Adding a footing to an existing slab on grade


Hello;

I am looking for some advice on a little summer project that I am planing out. I have owned an 82 yr old house in Vancouver Canada for about 1 year. We are looking to build a ground level patio and a deck extending off the second floor on the south side of the hose.

The house foundation is a slab on grade. I also found out that there is no footing to the foundation. Not a huge deal since it has been standing for 82yrs and there are only a few small cracks. I had the entire interior slab exposed for the past wet winter and saw no water at all.

But one of the design requirements is that I want the area under the deck to be a usable area. And since the second floor is only 7ft above the slab (low basement), that means that beams for the deck will be perfect head smacking height. My solution will be to dig about 18" to 24" along the south side of the house for a patio area.

The problem here is that I will need to dig below the bottom of the slab. So my solution will be to pour a retrofit footing to support the south edge of this slab.

So my big question is if anybody sees a problem with any of this? I could see arguments that a slab like this will want to move as a whole. By supporting one edge with a a footing, this could cause stresses near the south edge? Is there anything else that I should worry about? Does it make any difference that this is on the south edge of my house, while all the joists run east-west...so technically the south wall isn't even load bearing.

I have added a few photos and a couple of drawings. Any advice would be greatly appreciated.
Attached Thumbnails
Adding a footing to an existing slab on grade-backyard-dig.jpg   Adding a footing to an existing slab on grade-backyard_footing.jpg   Adding a footing to an existing slab on grade-backyard_footing_2.jpg  

jascox is offline   Reply With Quote
Old 07-05-2010, 12:47 AM   #2
Member
 
Join Date: Dec 2008
Location: Fairbanks, AK
Posts: 1,844
Default

Adding a footing to an existing slab on grade


(1) It looks like you are inviting a swimming pool or at least potentially wet earth under that patio area, which will lead to water under that end of the slab. How will you avoid that? (2) If for some reason you should not dig under the slab and re-fill w/ concrete (I'd guess you could; have thought about doing this to my garage some day), then digging next to it (if that won't disturb the soil, too) and putting a foundation wall next to the slab should work. You'd then drill the slab in several places, install/epoxy rebar about 8" in, and leave the rebar sticking out a foot or so. Pour the new foundation wall to embed the rebar. CHECK W/ AN ENGINEER ON THIS. That, I am not.


Last edited by jklingel; 07-05-2010 at 12:52 AM.
jklingel is online now   Reply With Quote
Old 07-05-2010, 01:05 AM   #3
Newbie
 
Join Date: Jun 2010
Location: St Louis Mo.
Posts: 17
Default

Adding a footing to an existing slab on grade


In Vancouver Canada the winters get pretty cold. I would imagine foundation depth is 4' or greater. The reason I bring this up is that if you place a footing and it is not deep enough the frozen ground will lift it and do real damage to your slab.By not having a footing the slab is currently "floating" on the surface.
Nailer is offline   Reply With Quote
Old 07-05-2010, 02:24 AM   #4
Member
 
Join Date: Dec 2008
Location: Fairbanks, AK
Posts: 1,844
Default

Adding a footing to an existing slab on grade


As I think about this more, why even bother w/ a "footer" (foundation wall, whatever)? Why not just let the slab do what it has been doing for 83 yrs, shore up the earth (exposed when the digging down happens) w/ wood or concrete NOT ATTACHED to the slab, and call it good. Let everything float. Since the new-cut edge will now be exposed to cold, I'd insulate it. Perhaps install 2" XPS vertically along that exposed edge and also 2' horizontally under the patio to (hopefully) avoid more freezing under the slab than it is used to. 1" of XPS is apparently worth 1' of dirt.
jklingel is online now   Reply With Quote
Old 07-05-2010, 02:20 PM   #5
jascox2001
 
Join Date: Mar 2010
Posts: 2
Default

Adding a footing to an existing slab on grade


Thanks for the responses. Vancouver doens't get too cold. But we typically have a couple of weeks of pretty cold weather (-5C sort of thing).

But pouring a footing and risking all the potential stresses seems like a bad idea, even if permafrost is unlikely in Vancouver. I like what jklingel has suggested as a mini-retaining wall (wood or concrete to keep all the support soil under the slab, and just keep the two completely separate.

Again, thanks for the responses.
JC.
jascox is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Adding new register via tee off existing register tpanc13 HVAC 12 06-30-2010 12:04 PM
Need advice on pouring slab inside existing wall. bmwbykrydr Building & Construction 2 04-05-2010 10:11 AM
adding a deck to existing concrete porch idiotbox37 Carpentry 6 12-02-2009 07:48 PM
Adding radiant heat to existing slab Seabass HVAC 9 04-27-2007 04:10 PM
Adding onto an existing garage awayne Building & Construction 2 06-04-2006 09:16 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.