Quote:
Originally Posted by a_lost_shadow
Didn't you hear? Converting your garage to a laundromat is the latest craze. 
|
You're right. No garage. It's on hold for now. I'm still waiting on the AEP load engineer to give my electrician a quote for a 3 phase changeover. However, for my own knowledge, I would like to know how to compute the wire size and OCPD for the load described in the original post.
Plummen, the main service will be 400a 120/208 3 phase.
Seems to me it would be 35 + 30 = 65 Three of the five 10 amp single phase machines would be on one 120v phase. I appreciate the knowledge shared on this forum even if it is above and beyond DIY
David