Old 02-02-2014, 11:44 PM   #1
Newbie
 
Join Date: Dec 2013
Posts: 11
Rewards Points: 10
Default

Using multiple ground screws


So, I've been searching and searching for an answer to this one, but haven't found anything definite (i.e. backed up by code) yet.

I've seen it done before where, in a metal box, instead of pigtailing all the grounds together and then attaching to a ground screw, someone pigtailed half of them together and attached them to a ground screw, then pigtailed the other half and attached them to another ground screw. (It was a 2-gang box made from 2 gangable metal boxes, so there were multiple holes that were designed to accept ground screws.)

I think this seems easier if there are a bunch of cables entering the box; for example, instead of trying to tie 8 ground wires together and connect to a ground screw, just tie 4 together and attach to one ground screw, then tie the 4 others together and attach to another ground screw.

Obviously there's still continuity between the grounds, but is there anything in the code that would prohibit this?

Advertisement

jhartz is offline   Reply With Quote
Old 02-03-2014, 01:15 AM   #2
Member
 
Join Date: Oct 2010
Location: Central Indiana (USA)
Posts: 1,318
Rewards Points: 500
Default

Using multiple ground screws


No Code ref, but take all the grounds, twist them together just a few turns, and put on a crimp sleeve and crimp it down. You will then take the longest remaining wire and, using that as a pigtail, place that around the ground screw, and cut the rest off.

The other way is just plain hack!

Advertisement

__________________
Installation is the Reverse of Removal.
sirsparksalot is offline   Reply With Quote
Old 02-03-2014, 06:41 AM   #3
A "Handy Husband"
 
rjniles's Avatar
 
Join Date: Feb 2007
Location: South Carolina Low Country
Posts: 4,241
Rewards Points: 2,392
Default

Using multiple ground screws


Quote:
Originally Posted by jhartz View Post
So, I've been searching and searching for an answer to this one, but haven't found anything definite (i.e. backed up by code) yet.

I've seen it done before where, in a metal box, instead of pigtailing all the grounds together and then attaching to a ground screw, someone pigtailed half of them together and attached them to a ground screw, then pigtailed the other half and attached them to another ground screw. (It was a 2-gang box made from 2 gangable metal boxes, so there were multiple holes that were designed to accept ground screws.)

I think this seems easier if there are a bunch of cables entering the box; for example, instead of trying to tie 8 ground wires together and connect to a ground screw, just tie 4 together and attach to one ground screw, then tie the 4 others together and attach to another ground screw.

Obviously there's still continuity between the grounds, but is there anything in the code that would prohibit this?
If you have 8 ground wires in a box (2 gang), you need to review your wiring layout and box fill. 8 #14 cables and 2 devices would require a 42 cu in box. #12 would require a 47.25 cu in box.
__________________
Location:
Coastal South Carolina
rjniles is online now   Reply With Quote
Old 02-03-2014, 06:53 AM   #4
E2 Electrician
 
stickboy1375's Avatar
 
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 5,164
Rewards Points: 2,120
Default

Using multiple ground screws


Besides possible box fill violation in this scenario, as long as it meets code I don't consider any installation hack, rather a preference.
stickboy1375 is offline   Reply With Quote
The Following 5 Users Say Thank You to stickboy1375 For This Useful Post:
brric (02-03-2014), ddawg16 (02-03-2014), Know A Little (02-04-2014), plummen (02-05-2014), Speedy Petey (02-03-2014)
Old 02-03-2014, 07:02 AM   #5
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,904
Rewards Points: 2,162
Default

Using multiple ground screws


Quote:
Originally Posted by stickboy1375 View Post
Besides possible box fill violation in this scenario, as long as it meets code I don't consider any installation hack, rather a preference.
I agree. I see NO problem in doing it the way you propose, but work out a better way of laying out your wiring so that you don't have EIGHT cables in a 2-gang box.
If you are doing the "spider" or "wagon wheel" layout where multiple circuits are fed out of that one box that is NOT the way professionals would do it, for this exact reason.
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC.
Speedy Petey is online now   Reply With Quote
The Following 2 Users Say Thank You to Speedy Petey For This Useful Post:
Jim Port (02-03-2014), stickboy1375 (02-03-2014)
Old 02-03-2014, 10:04 AM   #6
Member
 
Join Date: Oct 2011
Posts: 236
Rewards Points: 180
Default

Using multiple ground screws


ive seen that a lot on metal box, we almost never use wire nut on gnd unless there is more gnd wire than gnd screw available it make a cleaner box keeping the gnd on bottom of box

Last edited by carmusic; 02-03-2014 at 10:08 AM.
carmusic is offline   Reply With Quote
Old 02-03-2014, 10:42 AM   #7
Newbie
 
Join Date: Dec 2013
Posts: 11
Rewards Points: 10
Default

Using multiple ground screws


Just for clarification, the example with 8 cables wasn't necessarily a 2-gang box; I just wanted to make another scenario where this might be useful... maybe a 5-gang box (for a bunch of switches in one location or something).

I know I would also have to look at box fill, and I can't actually think of a new work situation where there would be 8 cables, but it could be useful.
jhartz is offline   Reply With Quote
Old 02-03-2014, 01:13 PM   #8
Member
 
Oso954's Avatar
 
Join Date: Jun 2012
Location: Northern Calif.
Posts: 1,817
Rewards Points: 1,514
Default

Using multiple ground screws


In my opinion, splitting the grounds between two screws is bad practice. If you tie 8 grounds together and someone removes/fails to replace that ground screw, you have one box that is no longer bonded.

If you split the grounds between 2 screws and someone removes/fails to replace one screw, you have four cables and everything connected to them that are no longer bonded back to the rest of the system.
Oso954 is offline   Reply With Quote
Old 02-03-2014, 02:04 PM   #9
Electrical Contractor
 
jbfan's Avatar
 
Join Date: Jun 2004
Location: Newnan GA
Posts: 5,964
Rewards Points: 2,324
Default

Using multiple ground screws


Quote:
Originally Posted by Oso954 View Post
In my opinion, splitting the grounds between two screws is bad practice. If you tie 8 grounds together and someone removes/fails to replace that ground screw, you have one box that is no longer bonded.

If you split the grounds between 2 screws and someone removes/fails to replace one screw, you have four cables and everything connected to them that are no longer bonded back to the rest of the system.
That is not the fault of the install, but the idiot that failed to make the connections that needed to be made.
__________________
Yes I am a Pirate, 200 years too late. "Jimmy Buffett"
jbfan is online now   Reply With Quote
The Following 4 Users Say Thank You to jbfan For This Useful Post:
darren (02-05-2014), Know A Little (02-04-2014), Speedy Petey (02-03-2014), stickboy1375 (02-03-2014)
Old 02-03-2014, 03:16 PM   #10
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,904
Rewards Points: 2,162
Default

Using multiple ground screws


Quote:
Originally Posted by jbfan View Post
That is not the fault of the install, but the idiot that failed to make the connections that needed to be made.
Exactly. You could "What if.." almost any installation and call it bad practice.
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC.
Speedy Petey is online now   Reply With Quote
The Following 3 Users Say Thank You to Speedy Petey For This Useful Post:
jbfan (02-03-2014), jhartz (02-04-2014), stickboy1375 (02-03-2014)
Old 02-03-2014, 08:34 PM   #11
Member
 
Join Date: Jan 2013
Location: New Jersey
Posts: 330
Rewards Points: 296
Default

Using multiple ground screws


Quote:
Originally Posted by Oso954 View Post
In my opinion, splitting the grounds between two screws is bad practice. If you tie 8 grounds together and someone removes/fails to replace that ground screw, you have one box that is no longer bonded.

If you split the grounds between 2 screws and someone removes/fails to replace one screw, you have four cables and everything connected to them that are no longer bonded back to the rest of the system.
I can't see any argument for one of these scenarios being definitively worse than the other.
JKeefe is offline   Reply With Quote
Old 02-03-2014, 09:40 PM   #12
E2 Electrician
 
stickboy1375's Avatar
 
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 5,164
Rewards Points: 2,120
Default

Using multiple ground screws


Quote:
Originally Posted by Oso954 View Post
In my opinion, splitting the grounds between two screws is bad practice. If you tie 8 grounds together and someone removes/fails to replace that ground screw, you have one box that is no longer bonded.

If you split the grounds between 2 screws and someone removes/fails to replace one screw, you have four cables and everything connected to them that are no longer bonded back to the rest of the system.
But it's not, because any hack will just hack it anyway...
stickboy1375 is offline   Reply With Quote
Old 02-04-2014, 08:58 PM   #13
Member
 
Join Date: Sep 2013
Location: Virginia
Posts: 462
Rewards Points: 270
Default

Using multiple ground screws


Quote:
Originally Posted by Oso954 View Post
In my opinion, splitting the grounds between two screws is bad practice. If you tie 8 grounds together and someone removes/fails to replace that ground screw, you have one box that is no longer bonded.

If you split the grounds between 2 screws and someone removes/fails to replace one screw, you have four cables and everything connected to them that are no longer bonded back to the rest of the system.
And this is done all the time (multiple Equipment grounds landed separately) in large junction boxes, panels and not an issue when the work is competed to code.
Know A Little is offline   Reply With Quote
Old 02-05-2014, 02:45 AM   #14
retired elect/hvac/plumb
 
plummen's Avatar
 
Join Date: Jan 2010
Location: south east of omaha/The island of misfit contractors
Posts: 2,916
Rewards Points: 2,010
Default

Using multiple ground screws


Quote:
Originally Posted by jhartz View Post
So, I've been searching and searching for an answer to this one, but haven't found anything definite (i.e. backed up by code) yet.

I've seen it done before where, in a metal box, instead of pigtailing all the grounds together and then attaching to a ground screw, someone pigtailed half of them together and attached them to a ground screw, then pigtailed the other half and attached them to another ground screw. (It was a 2-gang box made from 2 gangable metal boxes, so there were multiple holes that were designed to accept ground screws.)

I think this seems easier if there are a bunch of cables entering the box; for example, instead of trying to tie 8 ground wires together and connect to a ground screw, just tie 4 together and attach to one ground screw, then tie the 4 others together and attach to another ground screw.

Obviously there's still continuity between the grounds, but is there anything in the code that would prohibit this?
Was it run with conduit between the boxes or is this a bunch of romex run to junction boxes youre dealing with?
__________________
"facts" have no relevance to this discusion
Posting from a concrete bunker under a non descript barn
plummen is offline   Reply With Quote
Old 02-05-2014, 04:37 PM   #15
Newbie
 
Join Date: Dec 2013
Posts: 11
Rewards Points: 10
Default

Using multiple ground screws


Quote:
Originally Posted by plummen View Post
Was it run with conduit between the boxes or is this a bunch of romex run to junction boxes youre dealing with?
In my house, the example I found was just a few Romex wires going to boxes; it was mostly just a theoretical question. (And, if it were conduit, I sure hope there wouldn't be that many ground wires )

Advertisement

jhartz is offline   Reply With Quote
The Following User Says Thank You to jhartz For This Useful Post:
plummen (02-05-2014)
Reply

Tags
bonding , grounding , grounding screw


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
50 Amps for a garage help IcyShadowz Electrical 48 05-31-2012 11:58 PM
Drywall nail types kevsprojects Drywall & Plaster 23 07-31-2011 08:34 PM
Ground Location and Wire Size LHB_Texas Electrical 25 05-27-2011 10:38 AM
Wiring an outlet using both ground screws instead of pig-tailing together. cabber24 Electrical 5 08-26-2010 09:40 AM
Ground wire when multiple branches run through same conduit Ptron Electrical 25 08-09-2010 05:38 PM




Top of Page | View New Posts