Steel Building questions?


I'm building a 40 x 30 steel building on my property. It will be used for my personal shop for building hot rods, Etc.
I need to know if it is OK to use 12/2 Aluminum MC Cable through out the building using metal boxes. Or do I have to run all electric in conduit from the sub panel and treat it as a commercial building?

I have a 320/400 amp service on the house already 200 going to the house. I'm going to pull off of the meter with double lugs and I plan on useing a 100 Amp Two-Pole Outdoor Enclosed Circuit Breaker and running 2/0,2/0,2/0,#8 aluminum wire from the house in 2" conduit to a 100-Amp 20-Space 20-Circuit Indoor Main Breaker Load Center. Does this sound good?
I plan on putting a grounding rod at the building to ground the building and the sub panel.

Thanks for looking,

Advertisement

Arcmaster is offline   Reply With Quote
Old 10-26-2012, 12:01 AM   #2
Semi-Pro Electro-Geek
 
Join Date: Jul 2009
Location: Arizona, USA
Posts: 2,572
Rewards Points: 2,040
Default

Steel Building questions?


You can use MC cable, or you could even use NM cable. Both are required to be protected from damage and neither are wet-rated, so pretty much anywhere that you could legally run MC, you could run NM. In reality MC is quite a bit more durable but the code doesn't acknowledge this. Sleeve the MC or NM in conduit where it is subject to damage.

If you have a main breaker panel, then you don't need the 100A outdoor circuit breaker. Just run directly to the panel from the meter. For grounding, you will need two rods (unless you can prove under 25 ohms impedance, which you can't). You also need to bond the steel building, and if the slab has rebar then you need to bond it too.

Advertisement

__________________
I am a lawyer, but not your lawyer. And who cares anyways? We're here to talk construction. This is DIY advice, not legal advice.
mpoulton is offline   Reply With Quote
The Following User Says Thank You to mpoulton For This Useful Post:
Arcmaster (10-26-2012)
Old 10-26-2012, 02:28 PM   #3
Member
 
Join Date: Nov 2011
Location: Md/Pa
Posts: 1,499
Rewards Points: 1,354
Default

Steel Building questions?


I think the OP would need the 100 amp breaker as he isn't running 320/400 to the steel building.
zappa is online now   Reply With Quote
The Following User Says Thank You to zappa For This Useful Post:
Arcmaster (10-26-2012)
Old 10-26-2012, 04:54 PM   #4
Electrician
 
Join Date: Aug 2012
Location: Alberta
Posts: 14
Rewards Points: 10
Default

Steel Building questions?


Quote:
Originally Posted by zappa View Post
I think the OP would need the 100 amp breaker as he isn't running 320/400 to the steel building.
The OP mentioned using a main breaker load center, so the outdoor breaker is redundant. As long as the main breaker is properly sized for the wire used, he is good to go.
dawizman is offline   Reply With Quote
Old 10-26-2012, 05:10 PM   #5
Newbie
 
Join Date: Oct 2012
Location: Texas
Posts: 10
Rewards Points: 10
Default

Steel Building questions?


Yes I'm only running 100 amps to the steel building from the house. So I would need one grounding rod for the building and one for the Electric? I need to tie the ground from the building to the grounding rod at the house together correct.
Arcmaster is offline   Reply With Quote
Old 10-26-2012, 05:16 PM   #6
Electrician
 
Join Date: Aug 2012
Location: Alberta
Posts: 14
Rewards Points: 10
Default

Steel Building questions?


Quote:
Originally Posted by Arcmaster View Post
Yes I'm only running 100 amps to the steel building from the house. So I would need one grounding rod for the building and one for the Electric? I need to tie the ground from the building to the grounding rod at the house together correct.
You will need two ground rods spaced at least 6ft apart from each other. These will need to be tied together, and tied to the panel. Then, you will need to tie all metal components of your building together to your grounding electrode (Steel frame, metal siding, rebar in the pad).
dawizman is offline   Reply With Quote
Old 10-26-2012, 06:24 PM   #7
Member
 
Join Date: Nov 2011
Location: Md/Pa
Posts: 1,499
Rewards Points: 1,354
Default

Steel Building questions?


Quote:
Originally Posted by dawizman View Post
The OP mentioned using a main breaker load center, so the outdoor breaker is redundant. As long as the main breaker is properly sized for the wire used, he is good to go.
So he can run 2/0 straight from a 400 amp meter socket with no fusing? I'm assuming there is some distance beyond the tap rule to the metal building.
zappa is online now   Reply With Quote
Old 10-26-2012, 07:06 PM   #8
Electrician
 
Join Date: Aug 2012
Location: Alberta
Posts: 14
Rewards Points: 10
Default

Steel Building questions?


Quote:
Originally Posted by zappa View Post
So he can run 2/0 straight from a 400 amp meter socket with no fusing? I'm assuming there is some distance beyond the tap rule to the metal building.
As far as I know, the code states that the first disconnect must be "as close as possible" to the meter. In my opinion, you could run over to the shop without a breaker mounted near the panel. In the end, the inspector will have the final say, so ask your ahj what they want to see done
dawizman is offline   Reply With Quote
Old 10-26-2012, 07:46 PM   #9
Master Electrician
 
Join Date: Mar 2010
Location: Indiana
Posts: 2,977
Rewards Points: 2,210
Default

Steel Building questions?


If these will be service conductors coming directly from the meter, with no disconnect between the meter and the building panel only three conductors will be needed to the building and the panel should be connected as a service panel.
brric is offline   Reply With Quote
Old 10-26-2012, 08:07 PM   #10
Newbie
 
Join Date: Oct 2012
Location: Texas
Posts: 10
Rewards Points: 10
Default

Steel Building questions?


There is a distance of 115' between the house and the garage ( meter can to service). To be clear I can just run my 2/0 strait off the meter can under ground to the service panel in the garage? I thought that I would need to have a breaker next to the meter then go to the garage? That and I don't need to run the ground from the garage to the house, keep them separate? I don't live in the city limits.

Thanks,
Arcmaster is offline   Reply With Quote
Old 10-26-2012, 08:09 PM   #11
Electrician
 
Join Date: Aug 2012
Location: Alberta
Posts: 14
Rewards Points: 10
Default

Steel Building questions?


Quote:
Originally Posted by Arcmaster View Post
There is a distance of 115' between the house and the garage ( meter can to service). To be clear I can just run my 2/0 strait off the meter can under ground to the service panel in the garage? I thought that I would need to have a breaker next to the meter then go to the garage? That and I don't need to run the ground from the garage to the house, keep them separate?

Thanks,
This should be okay, but to be sure you should talk to the ahj (whoever will be doing the electrical inspection)
dawizman is offline   Reply With Quote
Old 10-26-2012, 08:11 PM   #12
Member
 
Missouri Bound's Avatar
 
Join Date: Apr 2011
Location: Almost Arkansas
Posts: 2,764
Rewards Points: 2,000
Default

Steel Building questions?


Quote:
Originally Posted by Arcmaster View Post
I need to know if it is OK to use 12/2 Aluminum
Is there a reason you wouldn't use copper? Do you already have a bunch of the aluminum?
__________________
Do you want it your way or the right way?
Missouri Bound is offline   Reply With Quote
Old 10-26-2012, 08:12 PM   #13
Semi-Pro Electro-Geek
 
Join Date: Jul 2009
Location: Arizona, USA
Posts: 2,572
Rewards Points: 2,040
Default

Steel Building questions?


Quote:
Originally Posted by dawizman View Post
As far as I know, the code states that the first disconnect must be "as close as possible" to the meter. In my opinion, you could run over to the shop without a breaker mounted near the panel. In the end, the inspector will have the final say, so ask your ahj what they want to see done
I'm not positive, but I'm pretty sure it's "as close as possible" to the point where the service conductors enter the building, not to the meter. In other words, the service entrance conductors can be as long as you want outside of a structure. Maybe someone will have a code citation that states otherwise.
__________________
I am a lawyer, but not your lawyer. And who cares anyways? We're here to talk construction. This is DIY advice, not legal advice.
mpoulton is offline   Reply With Quote
Old 10-26-2012, 08:32 PM   #14
Member
 
Join Date: Nov 2011
Location: Md/Pa
Posts: 1,499
Rewards Points: 1,354
Default

Steel Building questions?


edit out

Last edited by zappa; 10-26-2012 at 08:41 PM.
zappa is online now   Reply With Quote
Old 10-26-2012, 08:35 PM   #15
Newbie
 
Join Date: Oct 2012
Location: Texas
Posts: 10
Rewards Points: 10
Default

Steel Building questions?


The reason I'm running Alum. is the cost. is about half.

Advertisement

Arcmaster is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
U values for steel building, heat loss viper HVAC 7 07-13-2012 04:22 PM
Steel building price trends. When to buy?? viper Building & Construction 1 12-20-2010 12:15 PM
Building a front porch and have questions... SolidStateS15 Building & Construction 9 07-10-2010 05:16 PM
Questions on Building apartment On top of existing detached garage nsxman2001 Building & Construction 4 12-16-2008 05:36 PM
Handrail building code questions - Canada Peterpantz Carpentry 7 10-26-2008 01:24 PM




Top of Page | View New Posts