07-16-2012, 11:44 AM
|
#1
|
|
Newbie
Join Date: Jul 2012
Posts: 7
|
Square D Homelite Main Panel - Ground / Neutral Bonding
This is a 200 amp main panel which will feed a 200 amp sub panel back to back. From the way things look on this panel it looks to be bonded already. No green bonding screw to be found inside. See attached pictures. It looks like the neutral coming in from the power company ties into a bar and then there is a place for my ground and neutral to tie in the top left part of the panel on my side (two lugs with one being bigger than the smaller one). I believe at this point it is bonded with the panel. Its a clean way to do it if my thinking is correct or maybe im wrong.......thats why im here asking questions.! Help!
P.S. The current Main panel is out in the yard on a small telephone pole so im shifting it over beside the house (Back to back with inside subpanel) and going from aerial to underground service.
Last edited by erm1981; 07-16-2012 at 11:49 AM.
Reason: more info
|
|
|
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
07-16-2012, 12:23 PM
|
#2
|
|
UAW SKILLED TRADES
Join Date: Jan 2007
Location: Kansas
Posts: 4,584
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Your correct. What you have is called combination metering equipment and is rated 'service equipment only'. In other words neutral and ground will be permanently bonded since this will be the location of the main disconnecting means and utility meter in one enclosure.
Your going to be feeding your other panel via the feed thru lugs shown at the bottom of the panel busses and will be utilizing a 4 wire H-H-N-Grd feeder with neutral and ground separated at the panel after the service equipment panel.
|
|
|
07-16-2012, 03:30 PM
|
#3
|
|
Licensed Electrician
Join Date: Feb 2008
Location: central wisconsin
Posts: 981
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Where are the load side meter stabs?
__________________
John
|
|
|
|
The Following 3 Users Say Thank You to jrclen For This Useful Post:
|
|
07-16-2012, 03:40 PM
|
#4
|
|
Electrical Contractor
Join Date: Jun 2004
Location: Newnan GA
Posts: 5,008
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by jrclen
Where are the load side meter stabs?
|
Good catch!
__________________
Yes I am a Pirate, 200 years too late. "Jimmy Buffett"
|
|
|
07-16-2012, 04:13 PM
|
#5
|
|
Electrical Contractor
Join Date: Sep 2008
Location: Delmarva
Posts: 3,130
|
Square D Homelite Main Panel - Ground / Neutral Bonding
No bonding screw is needed, as others have pointed out the neutral is permanently bonded. Also:
1) The inside cover that separates the utility wires from the rest of the enclosure is not in the proper position.
2) The load lugs of the meter socket are missing. Where did you buy this from?
__________________
-KB
Life is uncertain -- eat dessert first!! To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|
|
|
07-16-2012, 04:28 PM
|
#6
|
|
Licensed Electrical Cont.
Join Date: Feb 2004
Location: NY State
Posts: 6,158
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by jrclen
Where are the load side meter stabs?
|
You saw that too, huh?
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
|
|
|
07-16-2012, 05:11 PM
|
#7
|
|
Licensed Electrician
Join Date: Feb 2008
Location: central wisconsin
Posts: 981
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by Speedy Petey
You saw that too, huh? 
|
Yeah I did. I'd hate for the OP to call the power company for connection and have them catch it.
__________________
John
|
|
|
07-16-2012, 05:32 PM
|
#8
|
|
E2 Electrician
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 3,086
|
Square D Homelite Main Panel - Ground / Neutral Bonding
You are missing PVC bushings on your terminal adapters as well....
|
|
|
07-16-2012, 05:44 PM
|
#9
|
|
Licensed Electrical Cont.
Join Date: Feb 2004
Location: NY State
Posts: 6,158
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by stickboy1375
You are missing PVC bushings on your terminal adapters as well....
|
Not required, but I use them also.
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
|
|
|
07-16-2012, 05:47 PM
|
#10
|
|
E2 Electrician
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 3,086
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by Speedy Petey
Not required, but I use them also. 
|
Im going with required.  Also, if you read 352.46, Im still going with required even with wire size #4 or smaller.
Last edited by stickboy1375; 07-16-2012 at 05:52 PM.
|
|
|
07-16-2012, 05:50 PM
|
#11
|
|
Licensed Electrical Cont.
Join Date: Feb 2004
Location: NY State
Posts: 6,158
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Damn it. You need to stop catching me on theses.
Was this a change within the last couple of code cycles?
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
|
|
|
07-16-2012, 05:51 PM
|
#12
|
|
E2 Electrician
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 3,086
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by Speedy Petey
Damn it. You need to stop catching me on theses.
Was this a change within the last couple of code cycles?
|
Im on the 2005 in Connecticut.  That's the NEC I have in front of me.
|
|
|
07-16-2012, 05:51 PM
|
#13
|
|
Licensed Electrical Cont.
Join Date: Feb 2004
Location: NY State
Posts: 6,158
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by Speedy Petey
Was this a change within the last couple of code cycles?
|
 Nope.
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
|
|
|
07-16-2012, 05:54 PM
|
#14
|
|
E2 Electrician
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 3,086
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by Speedy Petey
 Nope. 
|
No worries...
|
|
|
07-17-2012, 12:46 AM
|
#15
|
|
Newbie
Join Date: Jul 2012
Posts: 7
|
Square D Homelite Main Panel - Ground / Neutral Bonding
Quote:
Originally Posted by stubie
Your correct. What you have is called combination metering equipment and is rated 'service equipment only'. In other words neutral and ground will be permanently bonded since this will be the location of the main disconnecting means and utility meter in one enclosure.
Your going to be feeding your other panel via the feed thru lugs shown at the bottom of the panel busses and will be utilizing a 4 wire H-H-N-Grd feeder with neutral and ground separated at the panel after the service equipment panel.
|
Since the sub panel is so close does a seperate ground need to feed it? It currently has one running to it but im wondering if that is needed anymore since im grounding the main service panel and its pretty much back to back with
|
|
|
-->
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|