Hello All.

I have a question concerning my new house.

Once my connections are made I plan on hiring an electrician to check my work but I figure I will ask so that he can tell me it is correct rather then incorrect and trying to charge me $75 an hour.

I will have 200AMP service to my new house. I have buried three 4/0 wires in conduit and purchased the materials for the hookup. The meter socket is mounted at the house and includes a 200AMP disconnect. I have also purchased a breaker box for inside the house which also includes a 200 amp break to turn the whole box off.

Here is my question, I have 3 wires coming from the pole to my meter socket and main disconnect.

The hookup there is pretty self explanatory. The wire with the yellow strip goes to the neutral and the two hot wires with no colors connect to the two hot plugs.

On the other side there are a total of 4 big lugs for 4/0 wire and then the small lugs for the copper which will go to the two grounding rods.

On the breaker box that goes in the house though I only have three large lugs for wires. The two hot are again pretty self explanatory as is the neutral. My question is that when I had the electric supply company bring me the wire for inside I told them the inside run as 15 to 20 feet so they brought me what they said was “?SVR?” wire which is 3 which are in their own shields and one wire which looks to be just bare aluminum.

All 4 of these wires are in a sheath. I don't know where the bare wire goes or if it doesn't get hooked up or what.


Thanks for any adn all help.

Hunter

Advertisement


Last edited by user62587; 09-17-2009 at 10:44 AM.
user62587 is offline   Reply With Quote
Old 09-17-2009, 11:39 AM   #2
Tool Geek
 
PaliBob's Avatar
 
Join Date: Jun 2008
Location: Pacific Palisades CA
Posts: 2,546
Rewards Points: 2,072
Default

Service to a new House


Quote:
Originally Posted by jhunterthompson View Post
I plan on hiring an electrician to check my work .... rather then incorrect and trying to charge me $75 an hour.
Not a good way to start.Electricians are your friend. Installing a Service is not a DIY project. Be Safe
.

Advertisement

__________________
Disclaimer
& Stay Safe
.....Bob Lavery
PaliBob is offline   Reply With Quote
Old 09-17-2009, 11:48 AM   #3
Newbie
 
Join Date: Sep 2009
Posts: 5
Rewards Points: 10
Default

Service to a new House


Quote:
Originally Posted by PaliBob View Post

Not a good way to start.Electricians are your friend. Installing a Service is not a DIY project. Be Safe
.
While I appreciate the input your reply wasn’t really helpful in the least.

It was my understanding that if I have the main disconnect grounded via the ground rods then I only run three wires to the panel.

As I said, the connections are self explanatory and the POCO will inspect it prior to hooking it up to the pole regardless of who strips the wires and tightens the lugs. If they don’t like how it looks they will not hook it up.

Is grounding some tightly held secret?

It seems like the wire I was given to go from the main disconnect to the panel has an extra wire in the sheath. If it doesn’t then I am way out of my league and I apologize.
user62587 is offline   Reply With Quote
Old 09-17-2009, 11:59 AM   #4
Floor Sweeper
 
Join Date: Nov 2007
Location: Central MN
Posts: 360
Rewards Points: 252
Default

Service to a new House


Quote:
Originally Posted by jhunterthompson View Post

Is grounding some tightly held secret?
No, It is just expected to have the basics down before you take on a project of this magnitude.

Check out this link:
http://www.selfhelpandmore.com/home-...meter-2002.php
junkcollector is offline   Reply With Quote
Old 09-17-2009, 12:08 PM   #5
Newbie
 
Join Date: Sep 2009
Posts: 5
Rewards Points: 10
Default

Service to a new House


Quote:
Originally Posted by junkcollector View Post
No, It is just expected to have the basics down before you take on a project of this magnitude.

Check out this link:
http://www.selfhelpandmore.com/home-...meter-2002.php
Thank you for the link. It appears that the wire that was sent indeed has 4 wires in it when only three are needed.
user62587 is offline   Reply With Quote
Old 09-17-2009, 12:28 PM   #6
Licensed Pro
 
Join Date: Mar 2007
Location: SC
Posts: 1,545
Rewards Points: 1,000
Default

Service to a new House


If you have a main disconnect outside then that is the only place the neutral and ground are connected together. Any other panels fed from this main are considered subpanels and must be fed by four wires... 2 hot, neutral. and ground. The neutral and ground in the subpanel are NOT connected together; the neutral bar is isolated from the panel enclosure; the ground bar is bonded to the panel enclosure.

The supply company sent you the correct wire. I would try to get a licensed electrician involved now. It may be difficult to find one later that will sign off on your work.
__________________
"Life is hard. Life is harder when you're stupid." John Wayne
HouseHelper is offline   Reply With Quote
Old 09-17-2009, 01:08 PM   #7
Newbie
 
Join Date: Sep 2009
Posts: 5
Rewards Points: 10
Default

Service to a new House


Quote:
Originally Posted by HouseHelper View Post
The supply company sent you the correct wire. I would try to get a licensed electrician involved now. It may be difficult to find one later that will sign off on your work.
Thank you. I appreciate the informative answer.

I will contact an electrician to find out about grounding the panel.
user62587 is offline   Reply With Quote
Old 09-17-2009, 02:14 PM   #8
Member
 
joed's Avatar
 
Join Date: Mar 2005
Location: Welland, Ontario
Posts: 8,356
Rewards Points: 3,506
Blog Entries: 4
Default

Service to a new House


You probably need to buy an additional ground bar and DO NOT install the green bonding screw in the neutral bar that came with the panel. This is considered a sub panel.
__________________
Do not PM with questions that can be asked in a forum. I will not respond.
joed is online now   Reply With Quote
Old 09-17-2009, 02:27 PM   #9
Newbie
 
Join Date: Sep 2009
Posts: 5
Rewards Points: 10
Default

Service to a new House


Quote:
Originally Posted by joed View Post
This is considered a sub panel.
Is the diagram below (from teh sticky at the top of this page) an accurate description of how to connect the sub panel?

http://www.dropshots.com/stubbie4#al...09-04/20:03:00

I appreciate the information.

Thank You
user62587 is offline   Reply With Quote
Old 09-17-2009, 03:33 PM   #10
Member
 
Code05's Avatar
 
Join Date: May 2009
Location: Easton MD
Posts: 1,841
Rewards Points: 1,000
Default

Service to a new House


1. your cable is SER-Service Entrance Round.
2. You need a permit, Power company will not hook up without inspection.
3. that braided mesh is your grounding wire, it gets twisted up and installed in your separate ground bar in the sub panel, and with the neutral in the main panel/disconnect.
Code05 is offline   Reply With Quote
Old 09-17-2009, 03:36 PM   #11
Household Handyman
 
Join Date: Feb 2009
Location: Albany, Ga.
Posts: 2,299
Rewards Points: 1,050
Default

Service to a new House


I suppose this will be more of a question to all, than any answer: In the link that was shared with you, it shows a ground from the MAIN panel to a water pipe (NEC 250.50) along with an earth ground rod connection. In my area this would be a moot point as almost all homes built here now have a "plastic" line service from the water meter to the home and then PEX within the home. I understand the "cold water pipe ground" as it used to be here, and the connection had to be something like within five feet of the water line entering the home. So, is this still an NEC 250.50 requirement or a suggestion in today's world? OH-jhunter, I have helped (I'm not an electrician) pull the "SVR" wire for connecting an outside main to an inside sub-panel. The aluminum wire wrapped around the other three conducters was always used as a ground from one panel to another. Twisting that darn AL. wire to fit into a lug was not easy. Good Luck, David
Thurman is offline   Reply With Quote
Old 09-17-2009, 03:44 PM   #12
Member
 
Code05's Avatar
 
Join Date: May 2009
Location: Easton MD
Posts: 1,841
Rewards Points: 1,000
Default

Service to a new House


Quote:
Originally Posted by Thurman View Post
I suppose this will be more of a question to all, than any answer: In the link that was shared with you, it shows a ground from the MAIN panel to a water pipe (NEC 250.50) along with an earth ground rod connection. In my area this would be a moot point as almost all homes built here now have a "plastic" line service from the water meter to the home and then PEX within the home. I understand the "cold water pipe ground" as it used to be here, and the connection had to be something like within five feet of the water line entering the home. So, is this still an NEC 250.50 requirement or a suggestion in today's world? OH-jhunter, I have helped (I'm not an electrician) pull the "SVR" wire for connecting an outside main to an inside sub-panel. The aluminum wire wrapped around the other three conducters was always used as a ground from one panel to another. Twisting that darn AL. wire to fit into a lug was not easy. Good Luck, David
The water pipe connection is for copper or steel pipe only. You have to connect within the first 5 feet where it enters the house and the pipe must have at least 10 feet of lenghth in the ground going out. If the water lines meet the criteria it must be used.
Code05 is offline   Reply With Quote
Old 09-19-2009, 01:02 PM   #13
Member
 
Join Date: Jun 2007
Posts: 3,510
Rewards Points: 2,008
Default

Service to a new House


Try this. It's also at the top under "Stubbies" diagrams.

http://www.dropshots.com/stubbie4#al...09-04/20:03:00

Advertisement

J. V. is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
replumbing an old house simonfrog Plumbing 7 01-30-2012 05:45 AM
Trane XR12 1.5 ton-Too small for my house? Badfish740 HVAC 7 09-23-2009 06:48 AM
Just bought a house... need electical advice... pure_energy1 Electrical 18 04-18-2009 01:30 PM
Patio roof to house attachment question mikemobile Building & Construction 1 09-30-2008 08:51 AM
Complete AC installation in Old Capitol Hill Row House jacko10 HVAC 0 09-18-2007 06:42 PM




Top of Page | View New Posts