So I think I have a pretty good grasp of what to do to prepare for a service entrance move and upgrade I have planned. Let me describe what I plan to do, then I have a question.
I already have in place a 200 amp panel currently being used as a subpanel off of a 100 amp main panel.
So what I need to do is have a service mast in place with the weather head, have 3' of wire sticking out of the weather head, have the mast attached in at least 2 places, have the meter socket in place and have the wire from the socket to the 200 amp panel in place.
So once this work is done, I have my inspector inspect it, once it passes I call the POCO and within 2 days they come out, disconnect the old 100 amp wires and run new 200 amp wires to the new hookup.
So in these few days, I'm unable to use my 200 amp panel which currently is running the kitchen and the second floor.
My question is if there's any way of doing this without having the circuits on the 200 amp panel inoperative between the point I'm ready for inspection and when the 200 amp goes live?
I've looked at going from the meter to a seperate disconnect, but that seems a bit pricey.... Or maybe could I do a temporary hookup on a 100 amp panel that continues to run off the old 100 amp panel in place of the 200 amp sub?
I already have in place a 200 amp panel currently being used as a subpanel off of a 100 amp main panel.
So what I need to do is have a service mast in place with the weather head, have 3' of wire sticking out of the weather head, have the mast attached in at least 2 places, have the meter socket in place and have the wire from the socket to the 200 amp panel in place.
So once this work is done, I have my inspector inspect it, once it passes I call the POCO and within 2 days they come out, disconnect the old 100 amp wires and run new 200 amp wires to the new hookup.
So in these few days, I'm unable to use my 200 amp panel which currently is running the kitchen and the second floor.
My question is if there's any way of doing this without having the circuits on the 200 amp panel inoperative between the point I'm ready for inspection and when the 200 amp goes live?
I've looked at going from the meter to a seperate disconnect, but that seems a bit pricey.... Or maybe could I do a temporary hookup on a 100 amp panel that continues to run off the old 100 amp panel in place of the 200 amp sub?