I will be moving my meter base and therefore having to replace the 4' run of conduit from the socket on the outside of the house to the load center in the inside basement. Currently the conduit is 2" steel but I would like to replace it with PVC. The local POCO says it is fine to use Schedule 40, but I am concerned that the electrical inspector will want Schedule 80. Are there any guidelines for when pipe is or isn't subject to damage? (I would try to ask the inspector but they are very hard to get in touch with!) Thanks!

lesp is offline   Reply With Quote
Old 05-27-2011, 12:50 AM   #2
Member
 
Join Date: Oct 2010
Location: Central Indiana (USA)
Posts: 1,316
Default

Schedule 40 or 80?


Schedule 80, I think, is required for above ground use in areas subject to damage. Sched 40 would be for undergroumd.

sirsparksalot is offline   Reply With Quote
Old 05-27-2011, 12:54 AM   #3
Member
 
Join Date: Mar 2011
Location: WA State
Posts: 37
Default

Schedule 40 or 80?


That's my understanding too, but it is unclear exactly when the conduit is "subject to damage". Does that mean any time the conduit is above ground? Or only certain circumstances -- like conduit on the front of a garage that could be driven into?

In my situation, the conduit runs vertically on the house siding from the meter socket to an LB where it enters the basement.
lesp is offline   Reply With Quote
Old 05-27-2011, 06:23 AM   #4
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,328
Default

Schedule 40 or 80?


So this will be above the meter socket? I am having a hard time seeing a socket mounted 3-5' above ground and then going up another 4' to get into the basement.
__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is offline   Reply With Quote
Old 05-27-2011, 07:12 AM   #5
I ask the impossible!
 
Join Date: Aug 2010
Location: Royal Oak, Michigan
Posts: 1,057
Blog Entries: 7
Default

Schedule 40 or 80?


Well it it was a walk-out basement maybe and the meter socket was coming from an underground service, but I guess it could even happen with an overhead service and a walk-out basement.

Things that make conduit subject to physical damage that is at ground level, or slightly above or below grade, would be weed whackers and gardenning tools. And 5 year old boys. Nothing below 4' is safe when a 5 year old is around.
__________________
Please do NOT consider any "before" picture of my house as any kind of endorsement of any particular construction method. In fact, you should probably assume that if I post a "before" picture, I am posting it because I am soliciting advice on a proper replacement for one of MANY things done wrong by a previous owner.

Last edited by WillK; 05-27-2011 at 07:15 AM.
WillK is offline   Reply With Quote
Old 05-27-2011, 07:42 AM   #6
Electrician
 
SD515's Avatar
 
Join Date: Aug 2008
Location: Near Jackson Michigan Area
Posts: 1,450
Default

Schedule 40 or 80?


Jim, I didn’t see where the OP mentioned the 4’ run was going up. Did I miss it?

In my area, I’ve haven’t yet had an inspector require Schd 80. For the most part, we try to position things away from vehicle damage and the like. When we can’t, we usually use RMC.

As the inspector has the final say about the installation, we let them make the judgment call before we do the work if it’s questionable.

Lesp, in your case, your POCO is probably correct, but I would get the approval of your inspector first just to be safe.
__________________
Kyle

Just because you can, doesn't always mean you should
SD515 is offline   Reply With Quote
Old 05-27-2011, 09:33 AM   #7
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,328
Default

Schedule 40 or 80?


This is what I was going on.

Quote:
Originally Posted by lesp View Post
That's my understanding too, but it is unclear exactly when the conduit is "subject to damage". Does that mean any time the conduit is above ground? Or only certain circumstances -- like conduit on the front of a garage that could be driven into?

In my situation, the conduit runs vertically on the house siding from the meter socket to an LB where it enters the basement.
__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is offline   Reply With Quote
Old 05-27-2011, 09:40 AM   #8
I ask the impossible!
 
Join Date: Aug 2010
Location: Royal Oak, Michigan
Posts: 1,057
Blog Entries: 7
Default

Schedule 40 or 80?


Vertical doesn't specify whether it is up or down, just that it's not sideways. Could have meant it goes down.

The weekend can't get here fast enough?
__________________
Please do NOT consider any "before" picture of my house as any kind of endorsement of any particular construction method. In fact, you should probably assume that if I post a "before" picture, I am posting it because I am soliciting advice on a proper replacement for one of MANY things done wrong by a previous owner.
WillK is offline   Reply With Quote
Old 05-27-2011, 10:12 AM   #9
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,328
Default

Schedule 40 or 80?


Good thought Will. I don't know why i took it to mean upwards.
__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is offline   Reply With Quote
Old 05-27-2011, 11:58 AM   #10
Member
 
Join Date: Mar 2011
Location: WA State
Posts: 37
Default

Schedule 40 or 80?


OP here. The underground feed goes up to the meter socket (which strangely is about 6' off the ground) and then the conduit travels back down to grade level before popping through the rim joist.

I don't have any 5-year old boys around, but it sounds like the Sch 80 is the better bet. What's your preferred way of cutting the stuff (short of investing in a dedicated PVC cutting tool)?
lesp is offline   Reply With Quote
Old 05-27-2011, 12:07 PM   #11
Member
 
Join Date: Oct 2010
Location: Central Indiana (USA)
Posts: 1,316
Default

Schedule 40 or 80?


Quote:
Originally Posted by lesp View Post
OP here. The underground feed goes up to the meter socket (which strangely is about 6' off the ground) and then the conduit travels back down to grade level before popping through the rim joist.

I don't have any 5-year old boys around, but it sounds like the Sch 80 is the better bet. What's your preferred way of cutting the stuff (short of investing in a dedicated PVC cutting tool)?
Hack saw, miter saw.
sirsparksalot is offline   Reply With Quote
Old 05-27-2011, 12:07 PM   #12
I ask the impossible!
 
Join Date: Aug 2010
Location: Royal Oak, Michigan
Posts: 1,057
Blog Entries: 7
Default

Schedule 40 or 80?


Just about any kind of saw should work okay for pvc. I was using my circular saw to cut PVC when I was replacing my drainage pipes. I've also used a pipe cutter for copper pipes on schedule 40, but schedule 80 might be too thick - haven't tried it.

The circular saw is probably not the best choice, there are probably safer choices, but my excuse is that I had a lot of cuts and it was confined stinky crawlspace and I wasn't in any mood for spending the time and energy to use a hand saw for as many pieces as I needed to cut. Generally, a framing blade isn't really as fine as you want for plastic.
__________________
Please do NOT consider any "before" picture of my house as any kind of endorsement of any particular construction method. In fact, you should probably assume that if I post a "before" picture, I am posting it because I am soliciting advice on a proper replacement for one of MANY things done wrong by a previous owner.
WillK is offline   Reply With Quote
Old 05-27-2011, 07:43 PM   #13
Scared Electrician
 
Saturday Cowboy's Avatar
 
Join Date: Nov 2009
Location: Colorado
Posts: 715
Default

Schedule 40 or 80?


sawzall
__________________
Ragged Trousered Philanthropist


Please follow the code - its there for your safety no matter how inconvenient.
Saturday Cowboy is offline   Reply With Quote
Old 05-27-2011, 08:00 PM   #14
Electrical Contractor
 
Join Date: Feb 2008
Location: Colonia, NJ
Posts: 127
Default

Schedule 40 or 80?


Quote:
Originally Posted by Saturday Cowboy View Post
sawzall
Best friend.
hpp58 is offline   Reply With Quote
Old 05-27-2011, 08:50 PM   #15
Scared Electrician
 
Saturday Cowboy's Avatar
 
Join Date: Nov 2009
Location: Colorado
Posts: 715
Default

Schedule 40 or 80?


the first model on the market didn't sell so well: the sawzmost

__________________
Ragged Trousered Philanthropist


Please follow the code - its there for your safety no matter how inconvenient.
Saturday Cowboy is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Schedule 40 under driveway brjl Electrical 11 04-06-2011 07:32 PM
Illustrated nailing schedule? cortell Building & Construction 6 11-29-2010 09:26 PM
Using schedule 40 black pipe spaceman spif Plumbing 5 04-27-2010 05:37 PM
Primer/Topcoat Schedule for Trim? Lovegasoline Painting 26 12-19-2009 04:15 AM
OK to use schedule 40 & 80 conduit? Plumbvoltage Electrical 2 05-19-2009 02:27 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.