Rough inspection ?'s


I'm rewiring my kitchen and installing renovation recessed cans. Do I need to wait to install the cans and only run the wire before the rough inspection or can I connect the cans now?

Ebierley is offline   Reply With Quote
Old 02-09-2013, 04:15 AM   #2
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,506
Default

Rough inspection ?'s


You can install and wire them before the inspection.

__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is offline   Reply With Quote
The Following User Says Thank You to Jim Port For This Useful Post:
Ebierley (02-09-2013)
Old 02-09-2013, 10:18 AM   #3
Special User
 
Join Date: Jul 2012
Location: Idaho, US
Posts: 551
Default

Rough inspection ?'s


My inspector said to go ahead and install devices (switches, outlets, light fixtures) but wanted them left hanging out loose so he could verify the connections.
__________________
The above post is for entertainment purposes only. Its contents may, and probably will, lead to legal liability and damage or loss of property, life, or limb. Use at your own risk.
tylernt is offline   Reply With Quote
Old 02-09-2013, 10:17 PM   #4
Lic Electrical Inspector
 
electures's Avatar
 
Join Date: Dec 2009
Location: The Great Police State of New Jersey
Posts: 1,663
Default

Rough inspection ?'s


Quote:
Originally Posted by tylernt
My inspector said to go ahead and install devices (switches, outlets, light fixtures) but wanted them left hanging out loose so he could verify the connections.
Give him what he wants. I wouldn't have a problem with it as long as I can see inside the boxes.
__________________
All responses based on the 2011 NEC.
If you live in New Jersey click here. All other states click here.
Please check with local, county and state officials as laws may vary.
Sizing motors here. Online motor calculator here. Online calculators here.
electures is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Plumbing Rough In Versus Final Inspection kingbuggy Plumbing 4 06-23-2012 03:48 AM
Old wires not being used, a rough inspection dilema WillK Electrical 9 01-26-2011 09:26 PM
Rough inspection WillK Electrical 9 01-06-2011 08:19 AM
what to do for plumbing rough inspection? red86yota Plumbing 5 09-12-2010 04:39 PM
Passed my rough inspection, now what? theatretch85 Electrical 12 05-03-2009 02:11 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.