So I have gotten much advice from many posters on here and I am taking my time to get ready for my rough in inspection. I have decided to put in a new breaker for the circuit I am wiring. I have run all my wire for my outlets and have run wiring to the breaker box. Although I have not connected the wiring at the breaker box yet.

My question is at what point do I connect it to the breaker box? I was unsure if I did that before or after the rough in inspection.

brackh is offline   Reply With Quote
Old 03-18-2008, 07:52 AM   #2
When is fishing season?
 
CowboyAndy's Avatar
 
Join Date: Feb 2008
Posts: 613
Default

preparing for inspection


I would leave it disconnected from the breaker for rough in, especially with no devices installed on the circuit. You dont want to take the chance of someone flipping it on.

The inspector should be checking the connections in the panel at final inspection.

__________________
I DON'T OWN MY HOUSE...
MY HOUSE OWNS ME!
CowboyAndy is offline   Reply With Quote
Old 03-18-2008, 09:03 AM   #3
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,772
Default

preparing for inspection


It is a good idea to do as Cowboy suggests.
Make up the grounds and neutrals but leave the hots OFF the breakers until the end.
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC. If you're on the '14 already I feel sorry for you.
Speedy Petey is online now   Reply With Quote
Old 03-18-2008, 09:43 AM   #4
When is fishing season?
 
CowboyAndy's Avatar
 
Join Date: Feb 2008
Posts: 613
Default

preparing for inspection


Quote:
Originally Posted by Speedy Petey View Post
It is a good idea to do as Cowboy suggests.
Make up the grounds and neutrals but leave the hots OFF the breakers until the end.
Is that common?

I usually don't even have the cable entering the panel at rough in...
__________________
I DON'T OWN MY HOUSE...
MY HOUSE OWNS ME!
CowboyAndy is offline   Reply With Quote
Old 03-18-2008, 09:44 AM   #5
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,772
Default

preparing for inspection


For me it is.
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC. If you're on the '14 already I feel sorry for you.
Speedy Petey is online now   Reply With Quote
Old 03-18-2008, 09:56 AM   #6
When is fishing season?
 
CowboyAndy's Avatar
 
Join Date: Feb 2008
Posts: 613
Default

preparing for inspection


Quote:
Originally Posted by Speedy Petey View Post
For me it is.
I guess I just prefer to do all my work in the panel all at once.

But, to each his own...
__________________
I DON'T OWN MY HOUSE...
MY HOUSE OWNS ME!
CowboyAndy is offline   Reply With Quote
Old 03-18-2008, 10:11 AM   #7
Member
 
Join Date: Jun 2007
Posts: 3,503
Default

preparing for inspection


Where I live we are required to have the breaker panel completed and all devices installed, including recepts, discos and switches. We usually leave recepts and switches hanging out of their boxes. This inspection is done before the rock hangers start. Then only a final is left. Two inspections only. We can't get the meter until the final, so we have no issues with safety.
J. V. is offline   Reply With Quote
Old 03-18-2008, 10:14 AM   #8
UAW SKILLED TRADES
 
Stubbie's Avatar
 
Join Date: Jan 2007
Location: Kansas
Posts: 4,851
Default

preparing for inspection


Well I suppose it differs from state to state but I'm not sure how you pass rough in without all cables fastened and entering all device boxes, outlets, and enclosures. It wouldn't fly here.
You have always done it this way for your customers before roughin check or was this a homeowner job your speaking to?
Stubbie is offline   Reply With Quote
Old 03-18-2008, 10:19 AM   #9
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,772
Default

preparing for inspection


Quote:
Originally Posted by J. V. View Post
Where I live we are required to have the breaker panel completed and all devices installed, including recepts, discos and switches. We usually leave recepts and switches hanging out of their boxes.
This is for a rough inspection??? Sorry, but to me this is absurd!
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC. If you're on the '14 already I feel sorry for you.
Speedy Petey is online now   Reply With Quote
Old 03-18-2008, 10:46 AM   #10
When is fishing season?
 
CowboyAndy's Avatar
 
Join Date: Feb 2008
Posts: 613
Default

preparing for inspection


Quote:
Originally Posted by Stubbie View Post
Well I suppose it differs from state to state but I'm not sure how you pass rough in without all cables fastened and entering all device boxes, outlets, and enclosures. It wouldn't fly here.
You have always done it this way for your customers before roughin check or was this a homeowner job your speaking to?
I am not a professional, nor do I do work for other people (except for my brother in his new house and my father in law), but I have rewired my whole house one room at a time so I have had a few inspections now (each room individually) and everytime has been the same.

All wiring into their boxes, stapled, etc. At the panel, the cable gets stapled in place almost up to the panel, then just hangs out untill after rough inspection. Then, once rock is up, devices get terminated and the cable(s) get terminated in the panel.

This is the way I did it in my house, my brothers house and my father in law did it the same way. Various inspectors were used, and none of them said anything about.... even the pickiest one (who actually used a tape measure to make sure cables were stapled within the proper distance).
__________________
I DON'T OWN MY HOUSE...
MY HOUSE OWNS ME!
CowboyAndy is offline   Reply With Quote
Old 03-18-2008, 11:06 AM   #11
UAW SKILLED TRADES
 
Stubbie's Avatar
 
Join Date: Jan 2007
Location: Kansas
Posts: 4,851
Default

preparing for inspection


Ok that's fair enough but I think you see my point considering everything else that occurs after your rough in check.
As for JV I'd hate to be a drywaller in your state....
Stubbie is offline   Reply With Quote
Old 03-18-2008, 12:28 PM   #12
Member
 
Join Date: Dec 2007
Location: Baltimore, MD
Posts: 1,802
Default

preparing for inspection


Quote:
Originally Posted by Stubbie View Post
Ok that's fair enough but I think you see my point considering everything else that occurs after your rough in check.
As for JV I'd hate to be a drywaller in your state....
That's what I was thinking. How can they hang drywall with all of the devices connected? Here, in central MD, the POCO will put the meter on after the rough inspection with a single outlet next to the breaker box for construction use (at least for new homes).
jerryh3 is offline   Reply With Quote
Old 03-18-2008, 12:42 PM   #13
" Euro " electrician
 
frenchelectrican's Avatar
 
Join Date: Apr 2006
Location: WI & France { in France for now }
Posts: 5,369
Default

preparing for inspection


Quote:
Originally Posted by J. V. View Post
Where I live we are required to have the breaker panel completed and all devices installed, including recepts, discos and switches. We usually leave recepts and switches hanging out of their boxes. This inspection is done before the rock hangers start. Then only a final is left. Two inspections only. We can't get the meter until the final, so we have no issues with safety.

I hate to do this but i will never go this route at all. I know some of the rockers did a good job destory some of the switches and repectales along the way.

in my area it will not freaking fly like this.

I am with speedy pete with this matter

My inspector will not let us hook up any devices in rough stage until he go over with it once the rough inspection is done and the rocker done with it then i do go back and do the trim up.

Merci, Marc
frenchelectrican is offline   Reply With Quote
Old 03-18-2008, 01:45 PM   #14
Member
 
Join Date: Sep 2007
Posts: 192
Default

preparing for inspection


I'm doing a remodel in Northern CA, and getting ready for a rough-in inspection (btw, I am not an electrician). We are living in the house so our panel is live. I called the inspector and asked your exact question. Their response:

1st choice: panel made up, hots landed on breakers....but must have wire nuts on all the conductors in the boxes throughout the house. He went further to explain that they understand that is a lot of extra work (wire nuts), so he said they are also perfectly fine with 2nd choice....

2nd choice: grnds and neutrals connected, breakers in & labeled. Hots labeled but not landed. Non-landed hots must have wire nuts in the panel.

Boxes made up and ready for devices.
Everything stapled / supported.
nail plates where needed.
steve1234 is offline   Reply With Quote
Old 03-18-2008, 04:04 PM   #15
Learning by Doing
 
Leah Frances's Avatar
 
Join Date: Jan 2008
Location: Easton, Maryland
Posts: 3,156
Blog Entries: 7
Default

preparing for inspection


The easiest way to find out when (and what) you should have connected for your rough in is to call the inspector before you request your inspection and ask him (or her - I am sure there have to be some female inspectors out there - can I get a what!what!).

Inspections in my locality are performed by a third-party company (MDIA). Their receptionist advised me that the inspectors are happy to talk to HOs anonymously about inspections. She also gave me the hint that 7:30am was the best time to talk to the inspector!

I called the next day at 7:35 and asked the inspector a) what did he expect to see; and b) what were the most common reasons for failure. I tried to keep my questions specific and to the point. I also tried not to spend too much of his time.

He was nice, told me to make up my grounds and make sure I used nail guards.

Good luck!

__________________
If I could only remember to THINK about what I was doing before I did it.
Leah Frances is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
preparing kitchen cabinets np2008 Painting 3 01-07-2008 09:53 AM
preparing a estimate paintingpro Painting 3 04-17-2007 08:55 PM
preparing for subfloor before tiling zazu2056 Flooring 1 10-29-2005 08:09 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.