DIY Chatroom -  DIY Home Improvement Forum
    DIY Forum     DIY Blogs     Photos     Woodworking     Advertise     Contact Us  

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   DIY Chatroom - DIY Home Improvement Forum > Home Improvement > Electrical

Reply
 
Thread Tools Search this Thread Display Modes
Old 02-03-2008, 10:45 PM   #1
Newbie
 
Join Date: Oct 2007
Posts: 3
Default

Main disconnect box before service panel


I am installing a new service panel in a small building. I have the masthead, meter box and temporary service available outside the wall. I'm going to go straight through a brick & cinder block wall and put in a service panel. I'll have a licensed electrician do the high voltage hookup. Question is.. I'd like to put a separate main disconnect, like a lockable double throw switch, before my service panel, which, of course, will have it's own main disconnect. I want to do this so I can totally disconnect power and work on the service box without having any hot wires near me. It would also be nice if the disconnect box had a single outlet that I could use for temp power prior to the disconnect. Is anything like this possible ? Thanks..

Cellomangler is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 02-03-2008, 10:52 PM   #2
nap
You talking to me?
 
nap's Avatar
 
Join Date: Dec 2007
Location: sw mi
Posts: 5,407
Default

Main disconnect box before service panel


You can do the disconnect. This will become your main service disconnect and the ground/neutral bond and the GEC will all be in this disconnect.

You cannot install a recep prior to the disconnect.

nap is offline   Reply With Quote
Old 02-04-2008, 12:14 AM   #3
Union Electrician
 
goose134's Avatar
 
Join Date: Nov 2007
Location: Chicago, USA
Posts: 615
Default

Main disconnect box before service panel


As for the receptacle, use your neighbors. How often will you need to do this anyhow?
goose134 is offline   Reply With Quote
Old 02-04-2008, 01:26 AM   #4
Newbie
 
Join Date: Oct 2007
Posts: 3
Default

Main disconnect box before service panel


"As for the receptacle, use your neighbors. How often will you need to do this anyhow?"

True... I'm mainly concerned about the construction phase. I know I could just keep the temp power outside at the meter until after I've totally wired my small building and installed the service panel. But I figured it would be nice to use a few outlets in progress but also be able to totally safeguard myself when I needed to work in the service panel.

"You cannot install a recep prior to the disconnect."

So.. when they connect from my masthead/meter to my inside disconnect box (and then to the service panel) they must eliminate the temporary outdoor receptacles that are below my meter ? Or can I have them leave that up for a while ? Thanks...
Cellomangler is offline   Reply With Quote
Old 02-04-2008, 08:43 AM   #5
Res Ipsa Loquitur
 
Join Date: Dec 2007
Location: Southeastern PA
Posts: 363
Default

Main disconnect box before service panel


I saw a small panel in Lowes the other day for just the purpose of temporary power such as construction. I think it was GE or Siemens. It had breakers and a GFCI outlet or two. In any case, considering having outlets downstream from your meter and main disconnect will still need breakers appropriate for the load of those outlets.
__________________
Did you ever stop to think, then forget to start again?
handyman78 is offline   Reply With Quote
Reply


-->
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
This doesnt seem right. JoulesWinfield Electrical 27 07-26-2009 08:40 PM
turn main panel into a sub panel? tikicarver Electrical 2 01-24-2008 08:37 AM
Replace main panel? And lots of other ?s Bcoleman6 Electrical 13 01-22-2008 10:40 AM
Main Service Panel Full bobo Electrical 5 09-24-2007 08:13 PM
Arced main lug in service panel burgeke Electrical 4 11-02-2006 12:28 PM


Top of Page | View New Posts


All times are GMT -4. The time now is 04:50 AM.


© 2003 - 2010 The Building Network LLC