Ok guys, I just got started putting in my new sub panel, anyone see anything wrong yet?
Attached Thumbnails
Just got started-image-3860244250.jpg   Just got started-image-2657353444.jpg   Just got started-image-4140370626.jpg  

ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 01:21 PM   #2
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,510
Default

Just got started


You only need the sheath to extend 1/4" into the box.

The white on the two pole breaker needs to be re-identified as a hot.

I also would have routed the cable on the right down the right side gutter.

__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is online now   Reply With Quote
The Following User Says Thank You to Jim Port For This Useful Post:
ryan50hrl (07-19-2012)
Old 07-19-2012, 01:31 PM   #3
Member
 
Join Date: Jul 2012
Location: Fox Valley, WI
Posts: 202
Default

Just got started


Thanks Jim question on the sheath, do I need to pull those back out and cut them back further or should I just do it on the remaining ones, I guess the question is is it a code violation or just an ugly violation
ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 01:38 PM   #4
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,052
Default

Just got started


I don't see a main breaker....I believe your limit is 6 breakers.
__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is offline   Reply With Quote
Old 07-19-2012, 01:45 PM   #5
Member
 
Join Date: Jul 2012
Location: Fox Valley, WI
Posts: 202
Default

Just got started


Oh? I'm confused as to why there would be subpanel sold with Eight spots, 16 circuits labeled on it..... I was planning on using all eight spots is that a problem?
ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 01:53 PM   #6
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,052
Default

Just got started


Quote:
Originally Posted by ryan50hrl View Post
Oh? I'm confused as to why there would be subpanel sold with Eight spots, 16 circuits labeled on it..... I was planning on using all eight spots is that a problem?
Without a main disconnect....yea.....it will be a problem....I got dinged by my inspector on the sub-panel in my garage. I had 7 breakers. He said "Disconnect one".....then on the way out the door he said softly "You can reconnect it later if you want.".

The basic intent of the rule is that if you have to shut everything off quickly, anything more than 6 breakers may take too long.

Hopefully one of the experts will chime in...but I believe you can put in a larger breaker and backfeed it. That would be your main breaker .
__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is offline   Reply With Quote
Old 07-19-2012, 01:58 PM   #7
Member
 
Join Date: Jul 2012
Location: Fox Valley, WI
Posts: 202
Default

Just got started


I was under the understanding that as long as this was in the same structure, which it's in the basement next to the main panel about 20 feet away that it was okay. But that if it was in the garage then it had to have a main breaker
ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 02:02 PM   #8
A "Handy Husband"
 
rjniles's Avatar
 
Join Date: Feb 2007
Location: South Carolina Low Country
Posts: 3,979
Default

Just got started


You only need a main disconnect if the sub is in a remote building. If in same building as main panel it is not required.
__________________
Location:
Coastal South Carolina
rjniles is offline   Reply With Quote
The Following 4 Users Say Thank You to rjniles For This Useful Post:
brric (07-20-2012), J. V. (07-19-2012), mpoulton (07-19-2012), stickboy1375 (07-19-2012)
Old 07-19-2012, 02:14 PM   #9
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,510
Default

Just got started


It makes it harder to work with the conductors still in the sheath. The code does require at least 6" of free conductor in a box.
__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is online now   Reply With Quote
Old 07-19-2012, 02:17 PM   #10
Member
 
Join Date: Jul 2012
Location: Fox Valley, WI
Posts: 202
Default

Just got started


Quote:
Originally Posted by Jim Port View Post
It makes it harder to work with the conductors still in the sheath. The code does require at least 6" of free conductor in a box.

I did notice that........i'll measure more carefully next time......
ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 02:26 PM   #11
Member
 
Join Date: Jul 2012
Location: Fox Valley, WI
Posts: 202
Default

Just got started


Quote:
Originally Posted by Jim Port View Post
The white on the two pole breaker needs to be re-identified as a hot.

Any particular way it needs to be done to meet the requirement?
ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 02:33 PM   #12
Electrical Contractor
 
jbfan's Avatar
 
Join Date: Jun 2004
Location: Newnan GA
Posts: 5,740
Default

Just got started


Quote:
Originally Posted by ryan50hrl View Post
Any particular way it needs to be done to meet the requirement?
A black or red sharpie or piece of tape or some black/red paint.
__________________
Yes I am a Pirate, 200 years too late. "Jimmy Buffett"
jbfan is online now   Reply With Quote
The Following User Says Thank You to jbfan For This Useful Post:
ryan50hrl (07-19-2012)
Old 07-19-2012, 03:11 PM   #13
Member
 
Join Date: Jul 2012
Location: Fox Valley, WI
Posts: 202
Default

Just got started


Quote:
Originally Posted by Jim Port View Post

I also would have routed the cable on the right down the right side gutter.

Jim,

I'm assuming your talking about this wire to the circled location?
Attached Thumbnails
Just got started-electrical.jpg  
ryan50hrl is offline   Reply With Quote
Old 07-19-2012, 03:27 PM   #14
Semi-Pro Electro-Geek
 
Join Date: Jul 2009
Location: Arizona, USA
Posts: 2,544
Default

Just got started


The 6-disconnect rule applies only to services. So unless this panel serves a separate structure, you can have as many breakers as you want in there.
mpoulton is offline   Reply With Quote
Old 07-19-2012, 03:30 PM   #15
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,510
Default

Just got started


Yes to the red circle.

I would have also routed the white and bares the shortest route across the top of the panel.

__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is online now   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
My 5 year old composition roof started leaking boogiebuild Roofing/Siding 6 01-15-2011 07:40 PM
Started Exposed Brick Wall, Studs within brick, should I stop? perry167 Building & Construction 4 01-05-2011 09:41 AM
Started removing popcorn ceilings then found out there was 2% asbestos. Am I at harm? Peawhy Remodeling 15 12-30-2010 12:05 PM
Have you started your xmas decorations yet? StyleRoom Interior Decorating 2 12-02-2009 09:35 AM
Got started! rodsteryz Kitchen & Bath Remodeling 6 02-09-2009 12:51 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.