Installing sub panel


Hey guys, going to give all info I can so here goes, I'm building a 16x24 workshop that will have a few lights,window a/c 110v, various woodworking tools such as bandsaw, table saw, jointer, and the only tool I have have that I will run at the same time as others is a dust collector all which I think will be fine with a 100amp sub. My shop is about 100 feet from my main.My current main breaker is 200amps I'm not sure how to go about getting the current I have coming through it or what not but my main question is from what I gather I need 3 #2 stranded thhn copper wires one for hot,another hot, a neutral and then a #6 stranded ground? I would run that from the main with the meter outside( there's only one 200amp breaker so I wouldn't think) or the 20 circuit panel with I think a 150 amp breaker (at work so can't check)? Also they would have to tie in to the main lugs right? Doesnt seem like there's room. Also read that I need 2 ground rods by the shed and not to bond the ground and neutral together. I'm not sure what that means I thought each wire had its own bar that it went to. I know it's a lot to answer so I really appreciate any help and I know I should hire someone I just can't afford it. Trying to get it right the first time and not burn down my house!

Advertisement

Lupus71 is offline   Reply With Quote
Old 11-26-2012, 04:39 PM   #2
Newbie
 
kbc1's Avatar
 
Join Date: Oct 2012
Posts: 22
Rewards Points: 10
Default

Installing sub panel


wires from sub panel would have to go on its on 100 amp breaker in main panel, are you trenching this run , what size pvc are you using

Advertisement

kbc1 is offline   Reply With Quote
Old 11-26-2012, 05:44 PM   #3
macon, ga bibb county
 
Join Date: Sep 2012
Location: macon ga
Posts: 183
Rewards Points: 150
Default

Installing sub panel


Yes. Think I have to use 1.5 conduit. So I need a 100 amp breaker for my existing panel? The main outside by the meter only has one 200 amp breaker and no other slots. I have a sub panel that is full but I can use 2 tandems to free a space if thats where it goes.
Lupus71 is offline   Reply With Quote
Old 11-26-2012, 06:32 PM   #4
Newbie
 
kbc1's Avatar
 
Join Date: Oct 2012
Posts: 22
Rewards Points: 10
Default

Installing sub panel


where all your other branch circuits are you will run your feeder wires into that panel and install a 100 amp 240 volt 2 pole breaker , make sure nuetrals and grounds are isolated in sub
kbc1 is offline   Reply With Quote
Old 11-26-2012, 06:39 PM   #5
Member
 
Join Date: Sep 2008
Location: Massachusetts
Posts: 270
Rewards Points: 250
Default

Installing sub panel


Nothing wrong with using #2 copper but you can use #3 copper thhn/thwn for 100 amps. Use a two pole 100 amp breaker in the main panel. The minimum size conduit (pvc) is 1 1/4 but I would go ahead and use the 1 1/2 to make the pull easier. You need the two ground rods at the shed. While you have the trench dug I would suggest that you install a couple of extra conduit runs for low voltage- cable, satellite, alarm wiring, etc.
teamo is offline   Reply With Quote
Old 11-26-2012, 06:59 PM   #6
Licensed Electrician
 
k_buz's Avatar
 
Join Date: Mar 2012
Location: SE Wisconsin
Posts: 4,343
Rewards Points: 2,006
Default

Installing sub panel


You could easily get by with a 60A sub. It would cut the cost of the installation down quite a bit. I would use 1 1/4" PVC, (3) #6's, and a #10 ground (copper conductors).
__________________
__________________________________________________ ______________
Answers based on the National Electric Code. Always check local amendments.


k_buz is offline   Reply With Quote
The Following User Says Thank You to k_buz For This Useful Post:
stickboy1375 (11-30-2012)
Old 11-26-2012, 10:38 PM   #7
macon, ga bibb county
 
Join Date: Sep 2012
Location: macon ga
Posts: 183
Rewards Points: 150
Default

Installing sub panel


Ok great! So the main you are referring to would be the existing sub panel that is feeding everything in my house? also as I said it is full so would using 2 tandems to free a space for the 100 amp breaker be ok? Someone said I can have up to 10 I believe, depending on how much is being ran on the main already, I'm not sure how to figure that up.

Installing sub panel-image-287165259.jpg



Installing sub panel-image-118898109.jpg

This is the panel in my garage which is where I need to make room for the 100amp breaker, correct? Thanks for the help, I've been reading up all I can. Just want to do this correctly.
Lupus71 is offline   Reply With Quote
Old 11-26-2012, 10:47 PM   #8
Licensed Electrician
 
k_buz's Avatar
 
Join Date: Mar 2012
Location: SE Wisconsin
Posts: 4,343
Rewards Points: 2,006
Default

Installing sub panel


You might need to free up a total of 4 spaces. Many panels limit how much can be on each stab of the buss to 100A. Which means, if you use a 100A breaker on one side of the panel, you cannot have any breakers directly opposite.

You will need to verify that this panel is rated for tandems.
__________________
__________________________________________________ ______________
Answers based on the National Electric Code. Always check local amendments.


k_buz is offline   Reply With Quote
Old 11-26-2012, 10:55 PM   #9
macon, ga bibb county
 
Join Date: Sep 2012
Location: macon ga
Posts: 183
Rewards Points: 150
Default

Installing sub panel


I read somewhere that the panel numbers being qo2030 means I can have 10 tandems.So I would need 4 tandems to free up what is needed?im just not sure if thats too much for my panel.The old style for mine are costly at $35 used. Wish I could find them cheaper!
Lupus71 is offline   Reply With Quote
Old 11-27-2012, 11:02 AM   #10
macon, ga bibb county
 
Join Date: Sep 2012
Location: macon ga
Posts: 183
Rewards Points: 150
Default

Installing sub panel


How can I tell if 4 tandems and adding a 100amp breaker isn't overloading that panel?
Lupus71 is offline   Reply With Quote
Old 11-29-2012, 07:20 AM   #11
macon, ga bibb county
 
Join Date: Sep 2012
Location: macon ga
Posts: 183
Rewards Points: 150
Default

Installing sub panel


Bump bump
Lupus71 is offline   Reply With Quote
Old 11-29-2012, 07:33 AM   #12
Licensed Electrician
 
k_buz's Avatar
 
Join Date: Mar 2012
Location: SE Wisconsin
Posts: 4,343
Rewards Points: 2,006
Default

Installing sub panel


Quote:
Originally Posted by Lupus71 View Post
How can I tell if 4 tandems and adding a 100amp breaker isn't overloading that panel?
The circuits that will be protected are already feed by this panel and you know the service is able to handle what is currently there so that point is moot.

The 100A breaker isn't important. The important part is what loads are going to be in the sub panel. Most houses don't draw 100A, so I doubt it will be a problem, but you would need to do a load calc if you wanted to make sure.
__________________
__________________________________________________ ______________
Answers based on the National Electric Code. Always check local amendments.


k_buz is offline   Reply With Quote
Old 11-29-2012, 10:55 AM   #13
UAW SKILLED TRADES
 
Stubbie's Avatar
 
Join Date: Jan 2007
Location: Kansas
Posts: 5,235
Rewards Points: 2,440
Default

Installing sub panel


Quote:
Originally Posted by Lupus71 View Post
How can I tell if 4 tandems and adding a 100amp breaker isn't overloading that panel?
Put a 100 amp panel with main breaker in your workshop. It needs to have a main breaker to serve as the required service rated disconnect. It can be a 100 amp panel with 'main breaker' or it can have the backfed main option where you can install a double pole breaker with hold down kit. Many times the big box will have a value pack 100 amp panel with a main breaker very reasonable and comes with branch circuit breakers. This type panel will have a 'main breaker' like the one in your garage. The back fed type allows you to install your own main breaker which can be any double pole breaker designed for that panel. So if your running a 60 amp feeder from a 60 amp double pole breaker in your house panel you can install a 60 amp double pole breaker in the workshop panel. The idea is that the breaker in the workshop serves as a required disconnect for the detached workshop and the breaker in your house panel serves as the 'protection' breaker based on your feeder size. You cannot install a breaker that is more than the rating of your workshop panel.
You need 4 wires feeding the workshop panel set it up just like your house panel is being fed from the main breaker on the outside of your home. Notice in that panel there is a ground bar fastened directly to the metal of the enclosure and all the ground wires go to it. Then notice the neutral bar is separate from the ground bar and has all the white wires going to it. Next thing you will see is that the green 'bonding screw' is not installed in the neutral bar. That's the empty hole you see next to where the big gray feeder neutral connects into the lug of the neutral bar. With that bonding screw not installed this isolates the neutral bar from the ground bar and prevents neutral current from getting the the ground bar via the panel metal.Your going to use the same principle in your workshop panel.

When you buy your new panel just repost here and we can tell you how to separate neutral and ground.

I highly recommend using pvc conduit and thhn/thwn wire. A 60 amp feeder like K buz said will be adequate for your needs. Using a conduit size that will accept a 100 amp feeder will allow you to upgrade from the 60 amp feeder if you want in the future. You just use the wires existing to pull in the new wires.
Use the drawing below as your guide and I would strongly suggest you have your work inspected by a qualified person. Understand that the electrical work your doing requires a permit at a small cost. Do not be afraid of inspection it will give you peace of mind.

The drawing is a little different than your situation. The SER cable would be the cable that is coming from your main disconnect to your sub-panel with main breaker in the garage and your panel would be inside not outside other than that the drawing is accurate. The drawing shows a pvc conduit installation. All conduit above ground needs to be sch 80 ... below ground can be sch.40. You can also direct bury but the cost difference is minimal.
Attached Thumbnails
Installing sub panel-sub-panel-sub-panel-2.jpg  

Last edited by Stubbie; 11-29-2012 at 11:56 AM.
Stubbie is online now   Reply With Quote
Old 11-29-2012, 11:39 AM   #14
UAW SKILLED TRADES
 
Stubbie's Avatar
 
Join Date: Jan 2007
Location: Kansas
Posts: 5,235
Rewards Points: 2,440
Default

Installing sub panel


Quote:
Originally Posted by Lupus71 View Post
I read somewhere that the panel numbers being qo2030 means I can have 10 tandems.So I would need 4 tandems to free up what is needed?im just not sure if thats too much for my panel.The old style for mine are costly at $35 used. Wish I could find them cheaper!
Try Ebay. You only need 2 tandems to free up 2 spaces for a double pole breaker. Bus stab ratings may enter into the picture as K buz stated but on a 200 amp panel you should be fine as long as the breakers across from your feeder breaker are 20 amp or less. Look for a label that states the bus stab rating. Look at your panel starting at the bottom count up 5 breakers in each column. This is the area your tandems can go in.

Last edited by Stubbie; 11-29-2012 at 11:47 AM.
Stubbie is online now   Reply With Quote
Old 11-30-2012, 06:28 PM   #15
macon, ga bibb county
 
Join Date: Sep 2012
Location: macon ga
Posts: 183
Rewards Points: 150
Default

Installing sub panel


Just looked at my breaker outside (main?) it's actually a 150 amp and the sub panel too. Still ok for the 60 amp breaker? Also I want to put in a window unit a/c that draws 8.5 amps, is 60 amps still ok and could i go to 3 #6 thhn stranded and a #8 or 10 ground? Sorry for so many questions but also does the ground need to be solid?

Advertisement

Lupus71 is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
distribution panel amperage rating tom31415926 Electrical 10 08-26-2012 05:09 PM
Need some help installing a 60A sub panel stradt03 Electrical 22 02-09-2012 06:37 PM
200A upgrade and move, backfeeding permitted? WillK Electrical 3 05-30-2011 09:00 PM
Critique my Sub Panel rjniles Electrical 18 05-18-2011 12:31 AM
Installing panel blac1175 Electrical 6 05-02-2011 01:27 AM




Top of Page | View New Posts