I passed Rough-In


On Monday (yesterday) I scheduled my electrical rough-in inspection for today....but yesterday afternoon I get the "We need you now" phone call....so by the time I got home...I didn't have time to finish the 2-3 items I had to do before rough-in....

So this morning I cancelled....

I guess my inspector didn't get the memo.....my wife calls me at noon to say he is there...oh well...let him look...I know he will write it up...and I'll just reschedule....

He passed it. Mentioned a few things...need a staple here and there....asked about missing lights...she told him there were going to be in a soffett....he said "no problem"....etc.

My wife commented that she wishes she had a nickle for every time he said "He does clean work"....

Anyway....he signed off....

I've known this inspector for about 5 years now....he knows that if he tells me to correct something....I'll do it....he doesn't let me slide on things that are wrong...but is very easy on the simple things.

I do take pics of the corrections so if there is any question, I can show the pics.

I'm stoked....I'm getting closer.....

__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
The Following 3 Users Say Thank You to ddawg16 For This Useful Post:
frenchelectrican (01-29-2013), jbfan (01-29-2013), TheEplumber (01-29-2013)
Old 01-29-2013, 02:58 PM   #2
Member
 
eastcoastsparky's Avatar
 
Join Date: Nov 2012
Location: Pennsauken, NJ
Posts: 183
Default

I passed Rough-In


Post pics oc what you thought was wrong and going to fail for

eastcoastsparky is offline   Reply With Quote
Old 01-29-2013, 03:06 PM   #3
Member
 
Oso954's Avatar
 
Join Date: Jun 2012
Location: Northern Calif.
Posts: 1,518
Default

I passed Rough-In


Congratulations !!
Oso954 is online now   Reply With Quote
Old 01-29-2013, 04:06 PM   #4
Electrical Contractor
 
rrolleston's Avatar
 
Join Date: Oct 2011
Location: Granville, NY
Posts: 1,941
Send a message via AIM to rrolleston Send a message via Yahoo to rrolleston
Default

I passed Rough-In


Congratulations
__________________
With Electricity there is the right way to do it and the dead way. Just because it works does not make it safe.
rrolleston is offline   Reply With Quote
Old 01-29-2013, 08:35 PM   #5
Member
 
Join Date: Jul 2007
Location: OR
Posts: 168
Default

I passed Rough-In


Quote:
Originally Posted by ddawg16 View Post
On Monday (yesterday) I scheduled my electrical rough-in inspection for today....but yesterday afternoon I get the "We need you now" phone call....so by the time I got home...I didn't have time to finish the 2-3 items I had to do before rough-in....

So this morning I cancelled....

I guess my inspector didn't get the memo.....my wife calls me at noon to say he is there...oh well...let him look...I know he will write it up...and I'll just reschedule....

He passed it. Mentioned a few things...need a staple here and there....asked about missing lights...she told him there were going to be in a soffett....he said "no problem"....etc.

My wife commented that she wishes she had a nickle for every time he said "He does clean work"....

Anyway....he signed off....

I've known this inspector for about 5 years now....he knows that if he tells me to correct something....I'll do it....he doesn't let me slide on things that are wrong...but is very easy on the simple things.

I do take pics of the corrections so if there is any question, I can show the pics.

I'm stoked....I'm getting closer.....
It''s amazing how easy it is to deal with most inspectors if you follow the path that you have. Most of them really do want to help and to educate DIYs as to the right way to do things. Of course it helps to be in a small town or county where you can get to know each other. Well done!
philS is offline   Reply With Quote
Old 01-30-2013, 12:07 AM   #6
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,090
Default

I passed Rough-In


Quote:
Originally Posted by philS View Post
It''s amazing how easy it is to deal with most inspectors if you follow the path that you have. Most of them really do want to help and to educate DIYs as to the right way to do things. Of course it helps to be in a small town or county where you can get to know each other. Well done!
Far from a small town.....think....Los Angeles........contrary to popular perception, while LA may be big....people do get along pretty good.....a surprising amount of mutual respect.....you can't believe everything you see on the news....

But your right....treat the inspectors as a friend vs adversary, and it goes a lot easier.
__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Old 01-30-2013, 01:09 AM   #7
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,090
Default

I passed Rough-In


Quote:
Originally Posted by eastcoastsparky View Post
Post pics oc what you thought was wrong and going to fail for
I had a couple of spots like this....needed to put in a couple more staples....



I 'thought' this might be an issue.....



My load center is on the other side....as I understand it, your not supposed to enter a load center from the rear....but in my case, I don't really have an option....

Front view....(old pic BTW)

__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Old 01-30-2013, 05:54 AM   #8
Master Electrician
 
Join Date: Nov 2008
Location: Northern Virginia
Posts: 477
Default

I passed Rough-In


I'm very surprised you passed with that many obvious violations. You have fairly lenient inspectors.

Mark
__________________
Licensed Master Electrician
Commonwealth of Virginia
busman is offline   Reply With Quote
Old 01-30-2013, 09:49 AM   #9
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,090
Default

I passed Rough-In


Quote:
Originally Posted by busman View Post
I'm very surprised you passed with that many obvious violations. You have fairly lenient inspectors.

Mark
Besides the missing staples, what else do you see? I know the entry through the back of the load center is something that wouldn't fly out east...but is commonly done here....
__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Old 01-30-2013, 10:21 AM   #10
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,529
Default

I passed Rough-In


3M stackers would have been a better option instead of all those cables spread out with numerous staples.

Did the inspector say anything about derating the conductors leaving the bottom of the panel?

What sort of finish is going on the outside of the wall? I would have put a meter base like an MM30 under the panel.
__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is online now   Reply With Quote
Old 01-30-2013, 10:41 AM   #11
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,090
Default

I passed Rough-In


Quote:
Originally Posted by Jim Port View Post
3M stackers would have been a better option instead of all those cables spread out with numerous staples.

Did the inspector say anything about derating the conductors leaving the bottom of the panel?

What sort of finish is going on the outside of the wall? I would have put a meter base like an MM30 under the panel.
I've looked for stackers at HD but didn't see them.....

Nope....nothing about derating...I'm assuming you mean the NM going through the back of the load center?

Because the wall the meter is on is a shear wall (and the reason I couldn't recess the panel, I'm going to 'enclose' the load center and down pipe in a soffit.....(project for this weekend)
__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Old 01-30-2013, 11:15 AM   #12
Master Electrician
 
Join Date: Nov 2008
Location: Northern Virginia
Posts: 477
Default

I passed Rough-In


Quote:
Originally Posted by ddawg16 View Post
Besides the missing staples, what else do you see? I know the entry through the back of the load center is something that wouldn't fly out east...but is commonly done here....
Cables closer than 1-1/4" to the edge of a framing member.

Derating for more than 3 current-carrying conductors in a raceway.

Open knockout in the back of the loadcenter.

Conduit not secured to the loadcenter. It looks like the conduit is cinched down on the OSB with a bushing.

I sure wouldn't have passed that.

Mark

BTW, there is no code rule prohibiting entering a loadcenter from the back.
__________________
Licensed Master Electrician
Commonwealth of Virginia
busman is offline   Reply With Quote
Old 01-30-2013, 11:25 AM   #13
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,090
Default

I passed Rough-In


Before I respond....please understand that I'm not defending myself or am upset....just trying to learn....


Cables closer than 1-1/4" to the edge of a framing member. Are we talking about the NM cables that are stapled? In the cases of holes that are too close to the edge, I put nail block....and when I doubt...I use nail block...

Derating for more than 3 current-carrying conductors in a raceway. Are you calling the close nipple/knockout in the rear of the load center a raceway?

Open knockout in the back of the loadcenter. What are my options? If it's not open, how do I get wires in?

Conduit not secured to the loadcenter. It looks like the conduit is cinched down on the OSB with a bushing. It's secured....there is a nut on there....unless I'm not seeing what your talking about.
__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Old 01-30-2013, 11:35 AM   #14
Master Electrician
 
Join Date: Nov 2008
Location: Northern Virginia
Posts: 477
Default

I passed Rough-In


Cables closer than 1-1/4" to the edge of a framing member. Are we talking about the NM cables that are stapled? In the cases of holes that are too close to the edge, I put nail block....and when I doubt...I use nail block...

Cables cannot be stapled closer than 1-1/4" to the edge of a framing member when run parallel to the member. If a drywall screw misses the stud, it should not hit the cable. If it's going thru a member, it can be closer with a nail-plate installed.

Derating for more than 3 current-carrying conductors in a raceway. Are you calling the close nipple/knockout in the rear of the load center a raceway?

I'm referring to the conduit leaving the bottom of the loadcenter. It appears to have about 10-15 conductors in it. Derating will render those wires overloaded.

Open knockout in the back of the loadcenter. What are my options? If it's not open, how do I get wires in?

I see two knockouts in use in the back. There is a third one knocked out that just has OSB showing thru it.

Conduit not secured to the loadcenter. It looks like the conduit is cinched down on the OSB with a bushing. It's secured....there is a nut on there....unless I'm not seeing what your talking about.


I can see OSB around the outside of the bushing, so the conduit is not attached to the loadcenter enclosure.


Regards,

Mark
__________________
Licensed Master Electrician
Commonwealth of Virginia
busman is offline   Reply With Quote
The Following User Says Thank You to busman For This Useful Post:
ddawg16 (01-30-2013)
Old 01-30-2013, 12:11 PM   #15
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,090
Default

I passed Rough-In


Cables closer than 1-1/4" to the edge of a framing member. Are we talking about the NM cables that are stapled? In the cases of holes that are too close to the edge, I put nail block....and when I doubt...I use nail block...

Cables cannot be stapled closer than 1-1/4" to the edge of a framing member when run parallel to the member. If a drywall screw misses the stud, it should not hit the cable. If it's going thru a member, it can be closer with a nail-plate installed.

I will correct that....

Derating for more than 3 current-carrying conductors in a raceway. Are you calling the close nipple/knockout in the rear of the load center a raceway?

I'm referring to the conduit leaving the bottom of the loadcenter. It appears to have about 10-15 conductors in it. Derating will render those wires overloaded.

If I'm not exceeding the fill for the conduit, why do I need to derate? I do conduit at my real job all the time...I've never had to derate if I don't exceed the fill.

Open knockout in the back of the loadcenter. What are my options? If it's not open, how do I get wires in?

I see two knockouts in use in the back. There is a third one knocked out that just has OSB showing thru it.

Oh....ok...I see what your talking about now. When I was doing the knockouts, I pulled that one before I realized there was a stud behind it. Do I just put a plate over it? Do I have to cover it if the load center is going to be enclosed in a soffit?

Conduit not secured to the loadcenter. It looks like the conduit is cinched down on the OSB with a bushing. It's secured....there is a nut on there....unless I'm not seeing what your talking about.


I can see OSB around the outside of the bushing, so the conduit is not attached to the loadcenter enclosure.



Ok, I see what your talking about now....damned knockout came off when I was trying to get the smaller one out. It's on my list of tasks....now that I know I don't have to make any major changes....one of my weekend tasks is to pull all the wires off the breakers....cut to final length...attach heat shrink wire labels (including matching labels on the neutrals) and re-dress all the wires so it looks nice and neat....that is when I'll put a washer or larger close nipple in.

Mark....I appreciate your input....thanks

__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Toilet and Shower Rough In Dimensions VikingDinKC Plumbing 16 05-13-2012 01:50 PM
Replace a 10" rough in toilet with a 12" rough in Opie46 Plumbing 3 05-16-2009 11:27 AM
Passed my rough inspection, now what? theatretch85 Electrical 12 05-03-2009 02:11 AM
Rough electrical inspection - passed today! THANKS!!! vsheetz Electrical 4 02-06-2009 10:42 PM
Passed rough inspection, thank you! mt232 Electrical 1 06-13-2007 03:27 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.