HI;
We are going to run the service out to the detached garage soon. In the garage, I plan to install a 60A service disconnected prior to a mlo. Garage is fed by PVC, which will transition to EMT in the garage, the entire garage will be EMT (May use some Flex ENT for attic).
I will have a switch loop between the house and the garage. Would the best way to run the switch loop be to have a J-box right where the service enters the garage, and run the switch loop off of the j-box? Otherwise, the switch loop would have to pass through the service disconnect and the panel.
This is what I am thinking of doing, Does this look like a good approach or would something else work better?
Thank You,
Jamie
We are going to run the service out to the detached garage soon. In the garage, I plan to install a 60A service disconnected prior to a mlo. Garage is fed by PVC, which will transition to EMT in the garage, the entire garage will be EMT (May use some Flex ENT for attic).
I will have a switch loop between the house and the garage. Would the best way to run the switch loop be to have a J-box right where the service enters the garage, and run the switch loop off of the j-box? Otherwise, the switch loop would have to pass through the service disconnect and the panel.
This is what I am thinking of doing, Does this look like a good approach or would something else work better?