I need to bundle romex to get through a tight space in a wall into the panel on the other side. Here is my breakdown:

quantity 6 10/3 cables
quantity 5 10/2 cables
quantity 1 6/3 cable

All this needs to pass through a 2" schedule 80 pvc conduit 6 inches long.

Am I breaking any code? Am I trying to pull too many cables through the 2" hole?

jackwashere is offline   Reply With Quote
Old 09-23-2013, 04:55 PM   #2
Electrical Contractor
 
Philly Master's Avatar
 
Join Date: Mar 2013
Location: SE PA
Posts: 1,137
Rewards Points: 500
Default

bundling romex


its 50/50 depending on the inspector the code says ... u get 24" .. to be bundled .... then seperate ...

__________________
Philadelphia Master Electrician-Generac Dealer
Philly Master is offline   Reply With Quote
Old 09-23-2013, 05:17 PM   #3
Licensed electrician
 
Join Date: Sep 2007
Location: Maryland
Posts: 7,824
Rewards Points: 2,446
Default

bundling romex


Why the conduit sleeve?
__________________
Answers based on the National Electrical Code. Local amendments may apply. Check with your local building officials.
Jim Port is online now   Reply With Quote
Old 09-23-2013, 05:29 PM   #4
Retired from the grind
 
gregzoll's Avatar
 
Join Date: Dec 2006
Location: Midwest - Central Illinois
Posts: 14,340
Rewards Points: 2,342
Default

bundling romex


Quote:
Originally Posted by Jim Port View Post
Why the conduit sleeve?
That was my question also. My other is, is this going through a 2x6 plate, or 2x4 plate, or just middle of the floor.
__________________
Ren: Now listen, Cadet. I've got a job for you. See this button? Ren: Don't touch it! It's the History Eraser button, you fool! Stimpy: So what'll happen? Ren: That's just it. We don't know. Maybe something bad, maybe something good. I guess we'll never know, 'cause you're going to guard it. You won't touch it, will you?
gregzoll is online now   Reply With Quote
Old 09-23-2013, 05:31 PM   #5
Electrical Contractor
 
Philly Master's Avatar
 
Join Date: Mar 2013
Location: SE PA
Posts: 1,137
Rewards Points: 500
Default

bundling romex


how about a block wall or stone wall ... ??
__________________
Philadelphia Master Electrician-Generac Dealer
Philly Master is offline   Reply With Quote
Old 09-23-2013, 05:45 PM   #6
Member
 
Join Date: May 2010
Location: Los Angeles County
Posts: 206
Rewards Points: 154
Default

bundling romex


Quote:
Originally Posted by Jim Port View Post
Why the conduit sleeve?
ICF walls
4" of concrete
you put a 2" schedule 80 piece of conduit in the wall before you pour
jackwashere is offline   Reply With Quote
Old 09-23-2013, 06:41 PM   #7
Licensed Electrician
 
k_buz's Avatar
 
Join Date: Mar 2012
Location: SE Wisconsin
Posts: 4,343
Rewards Points: 2,006
Default

bundling romex


Yes, you are breaking code.
__________________
__________________________________________________ ______________
Answers based on the National Electric Code. Always check local amendments.


k_buz is offline   Reply With Quote
The Following User Says Thank You to k_buz For This Useful Post:
gregzoll (09-23-2013)
Old 09-23-2013, 06:46 PM   #8
Retired from the grind
 
gregzoll's Avatar
 
Join Date: Dec 2006
Location: Midwest - Central Illinois
Posts: 14,340
Rewards Points: 2,342
Default

bundling romex


Quote:
Originally Posted by k_buz View Post
Yes, you are breaking code.
You are not supposed to tell them that, until the AHJ shows up and Red Tags the whole job, and they come back asking why they cannot do it.
__________________
Ren: Now listen, Cadet. I've got a job for you. See this button? Ren: Don't touch it! It's the History Eraser button, you fool! Stimpy: So what'll happen? Ren: That's just it. We don't know. Maybe something bad, maybe something good. I guess we'll never know, 'cause you're going to guard it. You won't touch it, will you?
gregzoll is online now   Reply With Quote
Old 09-23-2013, 07:13 PM   #9
E2 Electrician
 
stickboy1375's Avatar
 
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 5,142
Rewards Points: 2,076
Default

bundling romex


If the hole isn't fire stopped I say you are good to go....if this PVC actually connects to the panel, total violation....

By the way, I have never pulled so many #10 cables in a house in my entire career, what the heck are you doing?

Last edited by stickboy1375; 09-23-2013 at 07:18 PM.
stickboy1375 is offline   Reply With Quote
Old 09-23-2013, 08:51 PM   #10
Member
 
Join Date: May 2010
Location: Los Angeles County
Posts: 206
Rewards Points: 154
Default

bundling romex


Quote:
Originally Posted by stickboy1375 View Post
I have never pulled so many #10 cables in a house in my entire career, what the heck are you doing?
I have a separate circuit breaker for each of these:

1 for living room front/foyer
1 for living room back
1 for bedroom
1 for kitchen
1 for bathroom/laundry washer
1 for dishwasher/garbage disposer
1 for refrigerator
1 for outdoor outlet in the back of the house
1 for laundry dryer
1 for water heater in the back of the house
1 for hvac
1 for range

total: 12

I could use #12 for many of these I suppose. The difference is $71 for 250 feet of #12 romex and $137 for 250 feet of #10. I thought having #10 would be better. Am I guilty of overkill?
jackwashere is offline   Reply With Quote
Old 09-23-2013, 08:54 PM   #11
Member
 
eastcoastsparky's Avatar
 
Join Date: Nov 2012
Location: Pennsauken, NJ
Posts: 183
Rewards Points: 150
Default

bundling romex


Quote:
Originally Posted by jackwashere
I have a separate circuit breaker for each of these: 1 for living room front/foyer 1 for living room back 1 for bedroom 1 for kitchen 1 for bathroom/laundry washer 1 for dishwasher/garbage disposer 1 for refrigerator 1 for outdoor outlet in the back of the house 1 for laundry dryer 1 for water heater in the back of the house 1 for hvac 1 for range total: 12 I could use #12 for many of these I suppose. The difference is $71 for 250 feet of #12 romex and $137 for 250 feet of #10. I thought having #10 would be better. Am I guilty of overkill?
way overkill
eastcoastsparky is offline   Reply With Quote
The Following 2 Users Say Thank You to eastcoastsparky For This Useful Post:
jbfan (09-23-2013), stickboy1375 (09-23-2013)
Old 09-23-2013, 08:54 PM   #12
E2 Electrician
 
stickboy1375's Avatar
 
Join Date: Apr 2012
Location: Litchfield, CT
Posts: 5,142
Rewards Points: 2,076
Default

bundling romex


Quote:
Originally Posted by jackwashere View Post

I could use #12 for many of these I suppose. The difference is $71 for 250 feet of #12 romex and $137 for 250 feet of #10. I thought having #10 would be better. Am I guilty of overkill?
Just a little....but it's your money. Don't forget to weigh in the cost of labor for installing #10, it will offset the cost of installing #12 or #14 big time....
stickboy1375 is offline   Reply With Quote
Old 09-23-2013, 09:01 PM   #13
A "Handy Husband"
 
rjniles's Avatar
 
Join Date: Feb 2007
Location: South Carolina Low Country
Posts: 4,173
Rewards Points: 2,256
Default

bundling romex


You might want to consider box fill using all that #10 for receptacles and lighting circuits.
__________________
Location:
Coastal South Carolina
rjniles is online now   Reply With Quote
The Following User Says Thank You to rjniles For This Useful Post:
k_buz (09-23-2013)
Old 09-23-2013, 09:31 PM   #14
Licensed Electrician
 
k_buz's Avatar
 
Join Date: Mar 2012
Location: SE Wisconsin
Posts: 4,343
Rewards Points: 2,006
Default

bundling romex


Box fill and the fact that most devices aren't rated for #10's.
__________________
__________________________________________________ ______________
Answers based on the National Electric Code. Always check local amendments.


k_buz is offline   Reply With Quote
Old 09-23-2013, 10:04 PM   #15
Electrical Contractor
 
Philly Master's Avatar
 
Join Date: Mar 2013
Location: SE PA
Posts: 1,137
Rewards Points: 500
Default

bundling romex


Quote:
Originally Posted by jackwashere View Post
I have a separate circuit breaker for each of these:

1 for living room front/foyer
1 for living room back
1 for bedroom
1 for kitchen 2 for kitch counter top MIN
1 for bathroom/laundry washer must be 2 seperate circuits
1 for dishwasher/garbage disposer shoulb be 2 different ones
1 for refrigerator
1 for outdoor outlet in the back of the house
1 for laundry dryer 30 amp if electric 10/3
1 for water heater in the back of the house 30 amp 10/2
1 for hvac most 30 amp 10/2
1 for range 50 amp 6/3

total: 12

I could use #12 for many of these I suppose. The difference is $71 for 250 feet of #12 romex and $137 for 250 feet of #10. I thought having #10 would be better. Am I guilty of overkill?

blue are 20's

all the rest COULD be 15 amp 14/2

dining room must be 20 amp 12/2

__________________
Philadelphia Master Electrician-Generac Dealer
Philly Master is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Identify age of old Romex - also funny ground Leah Frances Electrical 9 02-06-2012 01:07 AM
How to build a romex spinner jimmy21 Electrical 17 02-06-2012 01:01 AM
bundling romex mazey Electrical 3 09-08-2011 08:05 PM
romex clamped against bx knockout in old box kbm774 Electrical 11 08-16-2010 02:53 PM
bundling romex, code? johnnyboy Electrical 6 10-09-2007 06:57 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.