I am currently finishing a room in the basement. Sometime in the distant future I am going to need to add some outlets and run cat5e and coax to the bedrooms above said room. To meet code height requirements I need to drywall the ceiling in the basement.
What would be the best way to plan for the future updates? Run empty conduit with pull strings in ceiling of the basement into the walls of the rooms above, or plan on going from the basement into the attic and back down to the bedrooms? Any thoughts would be appreciated.
Thanks,
Ben
What would be the best way to plan for the future updates? Run empty conduit with pull strings in ceiling of the basement into the walls of the rooms above, or plan on going from the basement into the attic and back down to the bedrooms? Any thoughts would be appreciated.
Thanks,
Ben