Hey guys, so I am helping a friend install some recessed lighting in a location where two ceiling lights were before in a hallway.
I will post a quick link here and could someone please tell me if this is the proper way to do it for the wires in place.
I keep getting a master/slave situation between the two switches. Or I get power to one light and not the other.
I tested to confirm that the 14/2 coming into the first junction box is the power feed. From this junction box I have two runs of 14/2 running through the ceiling to the other light/junction box. at both junction box locations there is 14/3 running to the respective switch at each end of the hallway. I have tested and marked each run of 14/2 between lights as not to cross wires.
Please please help me end this 3 way nightmare. here's the link to the diagram it's #7.
http://www.easy-do-it-yourself-home-...agram.html#op7