Old 04-14-2012, 11:21 AM   #1
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 431
Share |
Default

225A Load Center


So, I decided to perform a service upgrade since I just finished installing an underground service lateral.

I believe the service upgrade falls under the NJ rehab code, so NEC 2005 would apply.

To the point, I would like to use 4/0 SEU to supply a 225A load center within about 18 inches of the meter pan. Can I use the 90 column under NEC 2005, which yields 205A, allowing me to use the next size up?

If not, I don't even know where to buy 3/0 copper SEU by the foot. Of course, I can get 3/0 THHN ($6/ft. per conductor) and 250 kcmil Aluminum, but 2" rigid conduit would be extremely difficult to install in the present location.

I could put in a 200A main breaker, but I foresee the day when I will need the extra 25A, as I add more 7 kilowatt mini splits, etc. 320A service is not an option, since the service lateral is 4/0 aluminum triplex.

CL200 meters with 225A service:

http://www.inspectorsjournal.com/forum/topic.asp?TOPIC_ID=1438


Last edited by benjamincall; 04-14-2012 at 03:18 PM.
benjamincall is offline   Reply With Quote
Old 04-14-2012, 11:25 AM   #2
Member
 
Join Date: Apr 2010
Location: central wisconsin
Posts: 772
Default

225A Load Center


you'll have to use the 75 degree c ampacity columns. i highly doubt your panel is rated for 90 degree c terminations.

itsnotrequired is offline   Reply With Quote
Old 04-14-2012, 11:27 AM   #3
Licensed Electrician
 
k_buz's Avatar
 
Join Date: Mar 2012
Location: SE Wisconsin
Posts: 4,335
Default

225A Load Center


I have never seen CU SER. Also, I would check somewhere else on that 3/0, I just priced 1/0 at $1.13/foot.
k_buz is offline   Reply With Quote
Old 04-14-2012, 11:31 AM   #4
Member
 
Join Date: Apr 2010
Location: central wisconsin
Posts: 772
Default

225A Load Center


Quote:
Originally Posted by k_buz View Post
I have never seen CU SER. Also, I would check somewhere else on that 3/0, I just priced 1/0 at $1.13/foot.
they make it but i don't believe it is used very often. aluminum is just so much more cost effective.

http://www.southwire.com/products/SEUSERSEOEM.htm
itsnotrequired is offline   Reply With Quote
Old 04-14-2012, 12:37 PM   #5
Member
 
Join Date: Dec 2011
Location: Livermore, California
Posts: 265
Default

225A Load Center


I'll second that check other places for prices. Even the big box stores can beat $6 a foot. I believe my local Lowes is ~$4 a foot. The electrical supply house I used (platt.com) appears to also offer those sizes cut to length. They want $1.37/ft for 250 XHHW-2 Au and $3.35/ft for 3/0 THWN-2 Cu.

Actually, as I look some more are you sure you didn't get a price on XHHW Cu? Platt apparently wants $5.57/ft for it.
a_lost_shadow is offline   Reply With Quote
The Following User Says Thank You to a_lost_shadow For This Useful Post:
benjamincall (04-14-2012)
Old 04-14-2012, 12:43 PM   #6
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 431
Default

225A Load Center


So, I've got to use invidual conductors in some sort of conduit?

Here's my panel:

http://products.schneider-electric.u...ber=QO142L225G

I haven't bought a main breaker yet, but this is the one I want to use:

http://products.schneider-electric.u...countrycode=us
benjamincall is offline   Reply With Quote
Old 04-14-2012, 12:55 PM   #7
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 431
Default

225A Load Center


Quote:
Originally Posted by a_lost_shadow View Post
I'll second that check other places for prices. Even the big box stores can beat $6 a foot. I believe my local Lowes is ~$4 a foot. The electrical supply house I used (platt.com) appears to also offer those sizes cut to length. They want $1.37/ft for 250 XHHW-2 Au and $3.35/ft for 3/0 THWN-2 Cu.

Actually, as I look some more are you sure you didn't get a price on XHHW Cu? Platt apparently wants $5.57/ft for it.
Must have been XHHW. If I can figure out some way to accommodate the conduit, do you think the 225A service will work? Just to recap:

135' (from the top of the pole) 4/0 aluminum triplex through 3" conduit, CL200 meter, 4/0 Cu or 250 Al in 2" PVC to the 225A load center.

Edit: The 75 column gives me 200A for 3/0 copper, so I guess I would have to go the next size up.

Last edited by benjamincall; 04-14-2012 at 01:02 PM.
benjamincall is offline   Reply With Quote
Old 04-14-2012, 12:59 PM   #8
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,772
Default

225A Load Center


Is this a residential service?
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC. If you're on the '14 already I feel sorry for you.
Speedy Petey is offline   Reply With Quote
Old 04-14-2012, 01:04 PM   #9
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 431
Default

225A Load Center


Quote:
Originally Posted by Speedy Petey View Post
Is this a residential service?
Yes, this is for my home.
benjamincall is offline   Reply With Quote
Old 04-14-2012, 01:05 PM   #10
Member
 
Join Date: Dec 2011
Location: Livermore, California
Posts: 265
Default

225A Load Center


You don't have to use single conductors. However, it's going to be easier to pull. Depending on what you're local supply houses stock, or what you find online. It may be cheaper and easier to find going single conductors.

Looking at the cut sheet from one manufacturer, it appears that they don't make 2 conductor w/ground SER cable larger than 4/0 Au. So you'd need to go up to 3 conductor w/ground for your service entrance. Doing the conduit fill calculation, I see that you'll also need 2 1/2" RMC to meet conduit fill.

Also remember if you go with a cable such as SER or SEU, you need to do the conduit fill based upon the outer diameter, or largest outer dimension for non round cables like SEU.
a_lost_shadow is offline   Reply With Quote
Old 04-14-2012, 01:09 PM   #11
Member
 
Join Date: Dec 2011
Location: Livermore, California
Posts: 265
Default

225A Load Center


For residential main service you can often use NEC Table 310.15(B)(7) (I think it was B6 before 2011). This calls for 3/0 Cu or 250 mil Au for 225.
a_lost_shadow is offline   Reply With Quote
The Following User Says Thank You to a_lost_shadow For This Useful Post:
benjamincall (04-14-2012)
Old 04-14-2012, 02:21 PM   #12
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,772
Default

225A Load Center


Just use 4/0AL or 2/0CU like any other typical 200A service.

Is this really a 225A load center, or a 200A main breaker panel?
If it is really 225A, where did you get it and where is the main breaker?
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC. If you're on the '14 already I feel sorry for you.
Speedy Petey is offline   Reply With Quote
Old 04-14-2012, 03:01 PM   #13
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 431
Default

225A Load Center


Quote:
Originally Posted by benjamincall View Post
So, I've got to use invidual conductors in some sort of conduit?

Here's my panel:

http://products.schneider-electric.u...ber=QO142L225G

I haven't bought the main breaker yet, but this is the one I want to use:

http://products.schneider-electric.u...countrycode=us
Petey,

I bought the panel from a supply house on eBay. It's an MLO panel to which I'm going to add a 225A main breaker (above).
benjamincall is offline   Reply With Quote
Old 04-14-2012, 03:58 PM   #14
Licensed Electrical Cont.
 
Speedy Petey's Avatar
 
Join Date: Feb 2004
Location: NY State
Posts: 6,772
Default

225A Load Center


Quote:
Originally Posted by benjamincall View Post
Petey,

I bought the panel from a supply house on eBay. It's an MLO panel to which I'm going to add a 225A main breaker (above).
WHY in the world did you buy that? Why not just get a standard main breaker panel?
__________________
Sometimes I feel like if I answer any more questions it is like someone trying to climb over a fence to jump off a bridge and me giving them a boost.
Answers based on the 2008 & 2011 NEC. If you're on the '14 already I feel sorry for you.
Speedy Petey is offline   Reply With Quote
The Following User Says Thank You to Speedy Petey For This Useful Post:
electures (04-14-2012)
Old 04-14-2012, 06:16 PM   #15
Lic Electrical Inspector
 
electures's Avatar
 
Join Date: Dec 2009
Location: The Great Police State of New Jersey
Posts: 1,562
Default

225A Load Center


Quote:
Originally Posted by benjamincall View Post
So, I decided to perform a service upgrade since I just finished installing an underground service lateral.

I believe the service upgrade falls under the NJ rehab code, so NEC 2005 would apply.

To the point, I would like to use 4/0 SEU to supply a 225A load center within about 18 inches of the meter pan. Can I use the 90 column under NEC 2005, which yields 205A, allowing me to use the next size up?

If not, I don't even know where to buy 3/0 copper SEU by the foot. Of course, I can get 3/0 THHN ($6/ft. per conductor) and 250 kcmil Aluminum, but 2" rigid conduit would be extremely difficult to install in the present location.

I believe the service upgrade falls under the NJ rehab code, so NEC 2005 would apply.

I could put in a 200A main breaker, but I foresee the day when I will need the extra 25A, as I add more 7 kilowatt mini splits, etc. 320A service is not an option, since the service lateral is 4/0 aluminum triplex.

CL200 meters with 225A service:

http://www.inspectorsjournal.com/forum/topic.asp?TOPIC_ID=1438
New Jersey has updated the ReHab Subcode to reference the 2008 NEC. Good thing I just updated this post a week ago to reflect the change.

DIY Electrical work in New Jersey

If you have any questions let me know.

__________________
All responses based on the 2011 NEC.
If you live in New Jersey click here. All other states click here.
Please check with local, county and state officials as laws may vary.
Sizing motors here. Online motor calculator here. Online calculators here.
electures is offline   Reply With Quote
The Following User Says Thank You to electures For This Useful Post:
benjamincall (04-14-2012)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Square D load center QO20M100 LAA2of3 Electrical 32 01-09-2013 05:46 PM
Load center & grounding recommendations lesp Electrical 9 04-15-2011 11:14 PM
Load center vs. bottom fed Panel Board. Ugh. wmldwilly Electrical 8 04-23-2009 07:48 PM
CH42B200R Load Center for Detached Home Theater nomad4137 Electrical 6 07-21-2008 06:57 PM
Main Load center Size Evnldr Electrical 11 06-13-2008 10:10 PM