DIY Chatroom -  DIY Home Improvement Forum
    DIY Forum     DIY Blogs     Photos     Woodworking     Extreme How To     Advertise     Contact Us  


Go Back   DIY Chatroom - DIY Home Improvement Forum > Home Improvement > HVAC


CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Reply
 
Thread Tools Search this Thread Display Modes
Old 11-14-2008, 08:19 AM   #1
Member
 
jamiedolan's Avatar
 
Join Date: Sep 2008
Location: Neenah, Wisconsin, USA
Posts: 1,728
Default

Furnace Venting Requirments


Hello;
I have a Goodman highboy GMV 95% series furnace. We installed it about 2 years ago. All is well.

However, due to other projects, I think I may have to move the flue vent outlet for the furnace today. It is 2" PVC. I am looking for the spec on the distance this can run / the run of bends & turns allowed. I checked the goodman site and this is all I found:

Installer must supply one or two PVC pipes: one for combustion air (optional) and one for the fl ue outlet (required). Vent pipe must be
either 2” or 3” in diameter, depending upon furnace input, number of elbows, length of run and installation
(1 or 2 pipes).

Anyone out there have any idea what distance I can run this vent pipe with how many bends in it?

Thanks very much
Jamie

jamiedolan is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 11-14-2008, 10:59 AM   #2
Member
 
Join Date: Sep 2008
Location: Portland, OR
Posts: 1,187
Default

Furnace Venting Requirments


I don't have the information for your furnace but I would not go longer than 40 feet with more than 20 90's...JUST KIDDING HERE,,,THAT IS FOR HVACLOVER...DON'T TAKE THIS SENTENCE AS ANYTHING BUT A JOKE.

Seriously with a 2 inch pipe no more than 5 90's at 20 feet if I remember correctly. If you have to go more than that then you will have to go with a 3 inch pipe.

Here is the problem.

There are safely mechanisms build into high efficiency furnaces. One of these mechanisms is a pressure sensor for the exhaust. If the pressure gets to high the furnace shuts down assuming that the exhaust is plugged. If you have too much back pressure in the pipe then it will shut down. The reason that it shuts down is do prevent CO from being pushed into the building. I test the pressure sensor by holding my hand over the exhaust and it shuts down right away if the pressure sensor is working.

Things that cause the pressure to build up is the total length of the pipe and the number of angles, especially 90's. It can be a combination of both length and 90's that will cause a problem. The number of 90's and length is just a rough estimate. I have seen situations where 4 90's in a 2 feet has caused enough back pressure to shut down the furnace. It was a self install and the guy didn't have a hole saw and figured that he would just use a lot of 90's. His run to the roof was only 8 feet. Once I took out the 90's an put a single pipe to the roof his furnace worked fine, (except for the t-stat hook up but I won't go into that now).
__________________
My idea of a perfect day: No where to go and all day to get there.
Marvin Gardens is offline   Reply With Quote
Old 11-14-2008, 12:49 PM   #3
Member
 
Join Date: Sep 2008
Location: Upstate New York
Posts: 355
Default

Furnace Venting Requirments


Your first indication you have it wrong is the furnace will not start and you may get a control module led fault blinking something about pressure switch. If you can rough fit things and do a quick test fire of the furnace that might keep you from having to redo a bunch of work.
dac122 is offline   Reply With Quote
Old 11-14-2008, 05:35 PM   #4
Member
 
Join Date: Nov 2008
Location: palm coast fl
Posts: 469
Default

Furnace Venting Requirments


for what its worth not saying im right but ive never seen any 90+ allow more than 4 90s in the exaust run and the longer the run the better off you are going to the 3in pipe
kennzz05 is offline   Reply With Quote
Old 11-15-2008, 12:21 AM   #5
Member
 
jamiedolan's Avatar
 
Join Date: Sep 2008
Location: Neenah, Wisconsin, USA
Posts: 1,728
Default

Furnace Venting Requirments


Quote:
Originally Posted by Marvin Gardens View Post
I don't have the information for your furnace but I would not go longer than 40 feet with more than 20 90's...JUST KIDDING HERE,,,THAT IS FOR HVACLOVER...DON'T TAKE THIS SENTENCE AS ANYTHING BUT A JOKE.

Seriously with a 2 inch pipe no more than 5 90's at 20 feet if I remember correctly. If you have to go more than that then you will have to go with a 3 inch pipe.

Here is the problem.

There are safely mechanisms build into high efficiency furnaces. One of these mechanisms is a pressure sensor for the exhaust. If the pressure gets to high the furnace shuts down assuming that the exhaust is plugged. If you have too much back pressure in the pipe then it will shut down. The reason that it shuts down is do prevent CO from being pushed into the building. I test the pressure sensor by holding my hand over the exhaust and it shuts down right away if the pressure sensor is working.

Things that cause the pressure to build up is the total length of the pipe and the number of angles, especially 90's. It can be a combination of both length and 90's that will cause a problem. The number of 90's and length is just a rough estimate. I have seen situations where 4 90's in a 2 feet has caused enough back pressure to shut down the furnace. It was a self install and the guy didn't have a hole saw and figured that he would just use a lot of 90's. His run to the roof was only 8 feet. Once I took out the 90's an put a single pipe to the roof his furnace worked fine, (except for the t-stat hook up but I won't go into that now).
I ended up being able to do the electrical work without having to move the pipe today. However, I deffinatly still want to get the pipe into a better location. Ideally I would like to have it exit the house about 35' from the furnace. I could use just 45's and it would be a mainly straight run. I wonder if this would work then if I used 3"..
Thank You.
Jamie
jamiedolan is offline   Reply With Quote
Old 11-16-2008, 10:52 AM   #6
Member
 
tk03's Avatar
 
Join Date: Sep 2008
Location: PA
Posts: 155
Default

Furnace Venting Requirments


I would probably call goodman and ask them as it is their product. They will have all the answers.
tk03 is offline   Reply With Quote
Old 11-16-2008, 11:15 AM   #7
Member
 
Join Date: Sep 2008
Location: Portland, OR
Posts: 1,187
Default

Furnace Venting Requirments


Quote:
Originally Posted by jamiedolan View Post
I ended up being able to do the electrical work without having to move the pipe today. However, I deffinatly still want to get the pipe into a better location. Ideally I would like to have it exit the house about 35' from the furnace. I could use just 45's and it would be a mainly straight run. I wonder if this would work then if I used 3"..
Thank You.
Jamie
If you used 3" there is almost no back pressure and you could run a long ways. The problem is slope. You have to have 1/4" drop per foot to keep condensation from building up. That's a 9" incline over 35 feet.
__________________
My idea of a perfect day: No where to go and all day to get there.
Marvin Gardens is offline   Reply With Quote
Old 11-18-2008, 02:47 AM   #8
Member
 
Join Date: Nov 2008
Location: palm coast fl
Posts: 469
Default

Furnace Venting Requirments


Quote:
Originally Posted by lyjg1117 View Post
什么是GoogleGoogle,是指根据google排名规则进行网站的规划,网页的设计,以确保网站从内容、结构、链接等尽量符合北京google排名规律,能在上获得较好的排位,让更多的潜在客户能够很快地找到你,从而求得网络营销效果的最大化。在排名网 站时,不仅要看网页的信息相关度,同时也会考虑网站的声望如何,比如外部链接有多少,网页的点击率有多高等 等。因此一个内容充实的网站肯定会排在内容贫乏的网站前面。巨大的访问量和影响力使得北京北京google排名排名是网络营销商家必争之地!稳定首页排名可以带来无限商机和利润,落后的排名不仅是效益的损失,同时意味 着将一次次宝贵商机,恭手让与竞争对手! 更多内容>>关于我们我们专业提供排名(搜索排名)及相关咨询服务,北京Google排名(Google搜 索排名)和Google咨询是我们重要服务内容,我们不仅提供北京Google和北京google排名咨询,同时面向上海、天津、河北等全国用户提供北京北京google排名排名咨询服务。网站建设、网站设计是我们为客户提供的配套服务,我们可以在网站建设的同时针对擎排名规则进 行基本为以后的网站推广做好准备


postwhore?
kennzz05 is offline   Reply With Quote
Old 11-18-2008, 11:02 AM   #9
Member
 
hvaclover's Avatar
 
Join Date: Oct 2008
Location: Suburbs of Detroit Mi
Posts: 2,646
Default

Furnace Venting Requirments


Refer to the following table for applicable length, elbows, and
pipe diameter for construction of the vent/flue pipe system of a
non-direct vent installation. In addition to the vent/flue pipe, a
single 90° elbow should be secured to the combustion air intake
to prevent inadvertent blockage. The tee used in the vent/flue
termination must be included when determining the number of
elbows in the piping system.
Pipe
Size (4)
(inc.) 2 3 4 5 6 7 8
045_3 2 68 65 62 59 56 53 50
070_3 2 68 65 62 59 56 53 50
070_4 2 46 43 40
2 16 13 10
3 68 65 62 59 56 53 50
090_5 3 68 65 62 59 56 53 50
115_5 3 68 65 62 59 56 53 50
Non-Direct Vent (Single Pipe)
Maximum Allow able Length of Vent/Flue Pipe (f t) (1) (2)
Models Number of Elbow s (3) (5)
(kBtu_Tons
)
090_4
Not Recommended
1) One 90° elbow should be secured to the combustion air intake connection.
2) Minimum requirement for each vent pipe is five (5) feet in length and
one elbow/tee.
3) Tees and/or elbows used in the vent/flue termination must be included
when determining the number of elbows in the piping system.
4) 3” diameter pipe can be used in place of 2” diameter pipe.
5) Increased Clearance Configurations using (2) 45 deg. Long Sweep
elbows should be considered equivalent to one 90 deg. elbow.
VENT/FLUE PIPE TERMINATIONS
The vent/flue pipe may terminate vertically, as through a roof, or
horizontally, as through an outside wall.
Vertical vent/flue pipe terminations should be as shown in the
following figure. Refer to Section IX, Vent/Flue Pipe and Combustion
Air Pipe - Termination Locations for details concerning
location restrictions. The penetration of the vent through the roof
must be sealed tight with proper flashing such as is used with a
plastic plumbing vent.
Horizontal vent/flue pipe terminations should be as shown in the
following figure. Refer to Section IX, Vent/Flue Pipe and Combustion
Air Pipe - Termination Locations for details concerning location
restrictions. A 2 3/8” diameter wall penetration is required for
2” diameter pipe while a 3 1/2” diameter hole is required for 3”
diameter pipe. To secure the pipe passing through the wall and
prohibit damage to piping connections, a coupling should be installed
on either side of the wall and solvent cemented to a length
of pipe connecting the two couplings. The length of pipe should
be the wall thickness plus the depth of the socket fittings to be
installed on the inside and outside of the wall. The wall penetration
should be sealed with silicone caulking material.
In a basement installation, the vent/flue pipe can be run between
joist spaces. If the vent pipe must go below a joist and then up
into the last joist space to penetrate the header, two 45° elbows
should be used to reach the header rather than two 90° elbows.
Counterflow units.
Remove plastic plug from alternate combustion air intake
location. Relocate and install plug in standard air intake
location (basepan). Plug the remaining hole in the blower
deck with the plastic plug included in the drain kit bag.
4. Upflow and Counterflow units.
With the gasket facing the cabinet side panel, and the
flange’s flat spot facing forward, secure the combustion
air intake coupling to the cabinet using the screws removed
__________________
Just slow, not stupid.
hvaclover is offline   Reply With Quote
Old 11-18-2008, 06:40 PM   #10
Journeyman
 
Join Date: Nov 2008
Location: North of Detroit
Posts: 42
Default

Furnace Venting Requirments


Quote:
Originally Posted by hvaclover View Post
Refer to the following table for applicable length, elbows, and
pipe diameter for construction of the vent/flue pipe system of a
non-direct vent installation. In addition to the vent/flue pipe, a
single 90° elbow should be secured to the combustion air intake
to prevent inadvertent blockage. The tee used in the vent/flue
termination must be included when determining the number of
elbows in the piping system.
Pipe
Size (4)
(inc.) 2 3 4 5 6 7 8
045_3 2 68 65 62 59 56 53 50
070_3 2 68 65 62 59 56 53 50
070_4 2 46 43 40
2 16 13 10
3 68 65 62 59 56 53 50
090_5 3 68 65 62 59 56 53 50
115_5 3 68 65 62 59 56 53 50
Non-Direct Vent (Single Pipe)
Maximum Allow able Length of Vent/Flue Pipe (f t) (1) (2)
Models Number of Elbow s (3) (5)
(kBtu_Tons
)
090_4
Not Recommended
1) One 90° elbow should be secured to the combustion air intake connection.
2) Minimum requirement for each vent pipe is five (5) feet in length and
one elbow/tee.
3) Tees and/or elbows used in the vent/flue termination must be included
when determining the number of elbows in the piping system.
4) 3” diameter pipe can be used in place of 2” diameter pipe.
5) Increased Clearance Configurations using (2) 45 deg. Long Sweep
elbows should be considered equivalent to one 90 deg. elbow.
VENT/FLUE PIPE TERMINATIONS
The vent/flue pipe may terminate vertically, as through a roof, or
horizontally, as through an outside wall.
Vertical vent/flue pipe terminations should be as shown in the
following figure. Refer to Section IX, Vent/Flue Pipe and Combustion
Air Pipe - Termination Locations for details concerning
location restrictions. The penetration of the vent through the roof
must be sealed tight with proper flashing such as is used with a
plastic plumbing vent.
Horizontal vent/flue pipe terminations should be as shown in the
following figure. Refer to Section IX, Vent/Flue Pipe and Combustion
Air Pipe - Termination Locations for details concerning location
restrictions. A 2 3/8” diameter wall penetration is required for
2” diameter pipe while a 3 1/2” diameter hole is required for 3”
diameter pipe. To secure the pipe passing through the wall and
prohibit damage to piping connections, a coupling should be installed
on either side of the wall and solvent cemented to a length
of pipe connecting the two couplings. The length of pipe should
be the wall thickness plus the depth of the socket fittings to be
installed on the inside and outside of the wall. The wall penetration
should be sealed with silicone caulking material.
In a basement installation, the vent/flue pipe can be run between
joist spaces. If the vent pipe must go below a joist and then up
into the last joist space to penetrate the header, two 45° elbows
should be used to reach the header rather than two 90° elbows.
Counterflow units.
Remove plastic plug from alternate combustion air intake
location. Relocate and install plug in standard air intake
location (basepan). Plug the remaining hole in the blower
deck with the plastic plug included in the drain kit bag.
4. Upflow and Counterflow units.
With the gasket facing the cabinet side panel, and the
flange’s flat spot facing forward, secure the combustion
air intake coupling to the cabinet using the screws removed
I think you just gave me a headache
pipefitter636 is offline   Reply With Quote
Reply


More On This Topic

This area used to be a back porch where the ceiling drops down. This entire area was a back porch. This end segment of it was a laundry room. When we decided to make this an entry alcove, what we did was we had to end the plumbing here, we had to... Read More »

Before you buy a house, it is a good idea to either inspect it yourself or hire a professional to do it for you. If you do not know what to look for, you may end up with repairs and problems you did not expect. Here are some tips on how to inspect... Read More »

When you need to pump water to a distant field, sometimes it's not convenient to run the pump with electricity. In such an application, a solar pump works well. Fortunately, you can do this yourself. This eHow can help you get started. Read More »

Hi! I'm Doug. I work with twenty great guys in St. Louis at Doug Jenkins Custom Hot Rods and we're going to do some work for you today on Expert Village. Dave is using a hydraulic pipe bender in order to shape the pipes that go from the exhaust headers... Read More »

Hi, My name is Christopher Howell with Expert Village. Today I am going to talk to you about how to watch soccer and its basics. When it comes to the soccer ball, the soccer ball needs to be 68 to 70 cm in diameter and it will have about 410 to 450 grams... Read More »

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Cased Coil - Install to Furnace - PICTURES!! hartkem HVAC 39 11-18-2008 02:45 AM
venting a high efficiency furnace through the roof (how high) allAboutDIY HVAC 11 10-21-2008 01:48 PM
venting furnace residing in attic-how to do so safely? mudpaw HVAC 5 08-01-2008 07:42 AM
Options for venting 90+ furnace RM575 HVAC 2 06-17-2007 11:32 PM
Furnace venting questions Mastiff HVAC 4 02-15-2007 08:27 AM

Top of Page | View New Posts


All times are GMT -4. The time now is 04:43 AM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
© 2003 - 2009 The Building Network LLC