hello,
currently I am having a company installing forced air on the first floor and basement of my home from 1901 (2100 sq ft). The company was hired 4 months ago and just finished the ductwork in the basement, but the furnance is not installed yet. after the first job is done, they plan to do a second furnance in the attic. however, it seems that another job wil take another 4 months at this rate, and I lost hope in them.
I was looking around at electrical heating with ducts or baseboard electric heating for the upstairs. It seems cheaper and maybe something I can accomplish. also, since the furnace has not been ordered yet, I have been trying to get the company to do one furnace for the entire house, however they say the system will not work well and alot of walls will be cut up to get the main ducts up into the attic. I really wish a one furnace system would work, since adding AC later on will be cheaper since I am getting the coil installed now. Can some of you HVAC guys chime in? thanks
currently I am having a company installing forced air on the first floor and basement of my home from 1901 (2100 sq ft). The company was hired 4 months ago and just finished the ductwork in the basement, but the furnance is not installed yet. after the first job is done, they plan to do a second furnance in the attic. however, it seems that another job wil take another 4 months at this rate, and I lost hope in them.
I was looking around at electrical heating with ducts or baseboard electric heating for the upstairs. It seems cheaper and maybe something I can accomplish. also, since the furnace has not been ordered yet, I have been trying to get the company to do one furnace for the entire house, however they say the system will not work well and alot of walls will be cut up to get the main ducts up into the attic. I really wish a one furnace system would work, since adding AC later on will be cheaper since I am getting the coil installed now. Can some of you HVAC guys chime in? thanks