Forums | Home Repair | Home Improvement | Painting | Interior Decorating | Remodeling | Landscaping


Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > HVAC

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 02-02-2013, 12:13 AM   #1
Newbie
 
Join Date: Jun 2012
Location: East Tn.
Posts: 15
Share |
Default

finish basement with metal-fab chimney


I want to finish my basement. I was planning on using 2" xps foam board, 1" furring strips, and 1/2" drywall. I have a question on how to work around the metal-fab chimney pipe that comes through the concrete block wall. (see pics)

I think the installer had a "wall firestop assembly" (TGWFSP), but didn't want to cut the hole big enough to use it, so I think he cut the cylinders off the TGWFSP, used the back plate on the outside of the concrete wall, and left the front plate for me to use however I wish. I do see fireblock caulking was used on the outside to seal the hole through the concrete.

Should I buy another TGWFSP, put it over the class A pipe and run my foam right up to the protective cylinder of the TGWFSP?

Do I even need to buy one as long as I keep the clearance? Maybe just build a wood frame (17"x17") around the class A pipe with 2.5" clearance, and install the leftover plate flush, running the drywall up to the edge of it. I could leave the foam outside the wood frame and dead air space between the frame and the class A pipe?

Also, what should I use to seal around the class A pipe and the concrete block (if anything)?

Thanks!
Attached Thumbnails
finish basement with metal-fab chimney-20130201_221833_resized.jpg   finish basement with metal-fab chimney-20130201_221904_resized.jpg  
88bomber is offline   Reply With Quote
Old 02-02-2013, 07:05 AM   #2
An old Tradesmen
 
Join Date: Oct 2008
Location: PA
Posts: 23,446
Default

finish basement with metal-fab chimney


Looks like your finished wall thickness will put it out over the single wall pipe, which will require a 6" clearance around it.
beenthere is offline   Reply With Quote
Old 02-02-2013, 08:03 AM   #3
Newbie
 
Join Date: Jun 2012
Location: East Tn.
Posts: 15
Default

finish basement with metal-fab chimney


I have 3.25" from the wall to the end of the class A pipe on top, and 3.75" at the bottom (its angled up slightly obviously).
88bomber is offline   Reply With Quote
Old 02-02-2013, 08:21 AM   #4
An old Tradesmen
 
Join Date: Oct 2008
Location: PA
Posts: 23,446
Default

finish basement with metal-fab chimney


Single wall requires 6" in all directions.
beenthere is offline   Reply With Quote
Old 02-02-2013, 08:31 AM   #5
Newbie
 
Join Date: Jun 2012
Location: East Tn.
Posts: 15
Default

finish basement with metal-fab chimney


So what if I used double wall stove pipe instead?
With the black trim plate I have, that would give me 4.5" to sheet rock.

Or, I guess I could use backer board + ceramic tile or "thin brick" instead of sheet rock for a small area behind the wood heater...that would work too right?

With either option, I still need to know what I should do behind the wall with regard to the XPS foam board and class A pipe.


So basically, the installer should have run the class A pipe 6" further into the room I guess.

Thanks!!
88bomber is offline   Reply With Quote
Old 02-02-2013, 11:31 AM   #6
An old Tradesmen
 
Join Date: Oct 2008
Location: PA
Posts: 23,446
Default

finish basement with metal-fab chimney


A small piece of the B vent to extend it further into the room will work fine. Not uncommon to do it the way it was done in an unfinished basement. But if he knew you were thinking of finishing it. He should have installed the complete fire stop/thimble assembly.

I would get a piece of 6" single wall pipe or what ever size the opening in your fire stop cover is. Fasten it to the cover and then slide it in the opening you leave in your finished wall and fasten the fire stop plate to the wall. That should get you your clearance. Also caulk the B vent to the block wall.
beenthere is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to finish a basement with low air-ducts? MKW Remodeling 12 09-15-2012 06:39 AM
Main beam in basement attached to the chimney in 2 sections. Same in the attic? strategery Building & Construction 4 08-02-2012 09:56 AM
Chimney Water Leaks in Basement roztom Roofing/Siding 6 07-05-2012 08:24 PM
replacing masonry chimney with metal chim. above roof line 4just1don Concrete, Stone & Masonry 2 04-13-2012 07:26 AM
Metal framing for basement Drop Cieling? joliet_man@yahoo.com Carpentry 3 10-22-2008 01:16 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.