Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > HVAC

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 11-03-2009, 01:49 PM   #1
Newbie
 
Join Date: Nov 2009
Posts: 1
Rewards Points: 10
Default

Boiler install questions


Im trying to help out my Brother in law plumber with some pre wiring of this boiler setup and want get some ideas on how to do it. Its a new boiler that has a circulator pump on it that runs when the boiler does, and there a 2 zones with a pump for each.

There is a Grundfos 3zone controller and a low water cutoff. My question is how do these systems tie together?

Just not sure how the controller ties in with the boiler and how the boiler and cutoff wire together. Thanks for any insight. It will be checked over by a rep before startup, but hes unavailable and we want to have most of it done when he comes.

ICBM is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tongue and Groove Ceiling install....questions... Dr. Jim Remodeling 9 04-08-2012 12:14 PM
pilot light on crown aruba boiler mazzonetv Plumbing 1 05-28-2009 10:13 AM
Outside water boiler shutdown hillardl Plumbing 2 03-20-2009 05:27 PM
Ductwork install questions smcmurrey HVAC 4 07-24-2008 05:36 PM
Preparing to install Kerdi on bathtub surround DIY-Renovator Flooring 18 07-17-2008 10:42 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.