Is this way of setting up the level strings ok?


Hi Everyone,

I removed all the grasses... now I need to setup the strings and start to remove the real soil to a correct depth... read quite a few ways to setup those levelling strings.... here is somthing I kind of combine different methods and would like to share with you and may be some expect here can point out anything wrong on this method:

as my to be laid area is kind of a irregular levelled ground with an irregular shape (not rectangle)... so this is the scheme I come up with and think it should work:

1. I surround the area with sticks and join each sticks with a string and make sure the string is levelled. All strings are at same height levelwise speaking, so the end result of this step is a surrounded levelled strings. I keep these setup untouch.

2. for places I require 1/4" / feet slope I measure up the distance from the strings in step 1 and drop accordingly and hammer in new sticks and tie in new strings.

3. for places I want to follow the natural grade, I setup sticks with the exact same height expose up the ground and joint them with strings.... to find the exact length expose... I can use the step 1 measurement to find the shortest expose stick for the direction I am interested in.

4. for places I want 100% level, I would use the height found in step1 to hammer in new sticks and tie new strings.

after step 2, 3 and 4 I should have all the horizontal and vertical grid strings which I can be used to guide how depth I should shovel by making a mark on my shoveler...

I have done step 1 yesterday... and will do step 2 and 3 as next steps... then hopefully, this weekend can do the real digging....


Above discuss levelling on one area... in my case, I actually have multiple areas which join together buy I want them have grade changes at the joining area sharper rather than gradually... I intend to use multiple surrounded levelled enclosed area and repeat above process to do that.

Will this work?....


Thanks for answering...


Last edited by KUIPORNG; 04-17-2008 at 10:15 AM.
KUIPORNG is offline   Reply With Quote
Old 04-17-2008, 11:39 AM   #2
Member
 
47_47's Avatar
 
Join Date: Sep 2007
Location: Springville, NY
Posts: 1,427
Default

Is this way of setting up the level strings ok?


It sounds like your idea would work. How large of an area are you dealing with? My two concern would be the time it took you to lay all of this out, someone may hit a grade stake and your yard would look like a giant spider web and it would be difficult to work around the strings and stakes. Have you considered a contractor to get you to grade or getting a laser level?
As far as following the natural grade, just eyeball it.

__________________
What we've got here is... failure to communicate. Some men you just can't reach. So you get what we had here last week, which is the way he wants it... well, he gets it.
47_47 is online now   Reply With Quote
Old 04-17-2008, 12:12 PM   #3
Member
 
Join Date: Jan 2006
Location: Toronto, Canada
Posts: 1,861
Default

Is this way of setting up the level strings ok?


Thanks for your comment... I really appreciate it... as this is the first time for me stuff.

I actually will dig one area at a time (ie. one enclosed loop) ... rather than the whole backyard...

the whole project is approx may be 1000 sq. ft.... I intend to divid it into 3 areas because of the grade situation....

I know that when the stick and string come off, it would be a total waste of my effort...

that is why I told my wife that the kids are probhabit to the backyard until further notice and I hope Toronto weather will be nice for a few days at least...

regarding contractors... it is kind of expensive for me... and I want to save $$ to buy a better stones...

using a lazer level.... I didn't think of that even I got a couple of those equipments.... I was using line level all along... may be next loop I will give that a try...


Thanks a lot

Last edited by KUIPORNG; 04-17-2008 at 12:28 PM.
KUIPORNG is offline   Reply With Quote
Old 04-17-2008, 12:59 PM   #4
Member
 
47_47's Avatar
 
Join Date: Sep 2007
Location: Springville, NY
Posts: 1,427
Default

Is this way of setting up the level strings ok?


I'm glad you're not doing the entire 1000 ft² all at one time. A few things to consider. Plan for your downspout water. Are you going to install an irrigation system or hardwired landscape lights? Now would be the time to rough them in. If you are not using a natural product, you may also want to order all of your stones and have them all delivered at the same time. Manufacturers sometimes change their product line. I would also look for a source other than the box stores to get your stones. You can sometimes get a break on the quantity and the delivery from a real supplier.
I know contractors cost, but sometimes the savings in time and saving your back is well worth it, especially with the short summer. Good luck and be sure to post pictures.

Mike
__________________
What we've got here is... failure to communicate. Some men you just can't reach. So you get what we had here last week, which is the way he wants it... well, he gets it.
47_47 is online now   Reply With Quote
Old 04-17-2008, 01:14 PM   #5
Member
 
Join Date: Jan 2006
Location: Toronto, Canada
Posts: 1,861
Default

Is this way of setting up the level strings ok?


to be honest and excuse me... I do not know what is a irrigation system and what its for... may be I will search the web a bit for that and see if I need to do it... regarding wiring and stuff.. I will pass on that... thanks for remind me taking pictures... will do... some before/after...

I have a hidden reason that I didn't share with my wife... why not hiring contractors... besides $$... you can't get the satisfaction when friends come to your place and they find out you did the stones yourself....for that it is really money can't buy....

I am kind of the margin of my age being able to do this stuff myself... few more years I amn't sure about that...

yes I did find a great landscape special store... all kind of people going there including lots of contractors....

Regarding place the order now... I am a bit hestiate... as I am not sure when will be ready for what stage... I am even thinking of placing double delivery charges having the materials deliver to me multiple times... in order for those stuff not to seat on the front yard for too long... you know... but I probably end up go for all at one shot...when I getting more confidence/closer to the stage.

ok, just find out what is irrigation system... I probably don't need those in Toronto... I suppose those thing are for desert type places... may be I am wrong... but here we worry about too much water underground more than too little water for wetting the basement....

Last edited by KUIPORNG; 04-17-2008 at 01:19 PM.
KUIPORNG is offline   Reply With Quote
Old 04-17-2008, 01:53 PM   #6
Member
 
47_47's Avatar
 
Join Date: Sep 2007
Location: Springville, NY
Posts: 1,427
Default

Is this way of setting up the level strings ok?


I think you missed my point. I would hire a contractor to grade your yard only. With the multiple levels you will need a proper base and they would get it done in no time. They could also bring in/remove fill. You would do all of the finish/stone work.

Mike
__________________
What we've got here is... failure to communicate. Some men you just can't reach. So you get what we had here last week, which is the way he wants it... well, he gets it.
47_47 is online now   Reply With Quote
Old 04-17-2008, 03:48 PM   #7
Member
 
Join Date: Jan 2006
Location: Toronto, Canada
Posts: 1,861
Default

Is this way of setting up the level strings ok?


consider preparing the base is really I think 80% of the job... although I never asked... but I wouldn't surprise contractors will charge a lot here... you have to know in Toronto... or in Canada... for this sake... everything is real expensive.... if you know it cost nowaday almost half a million for a decent home here...

KUIPORNG is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Is it bad to use mortar to level a floor? CB2007 Flooring 4 10-01-2008 08:38 AM
How level does a footing need to be? tripower Building & Construction 1 05-03-2007 08:59 AM
How to deal with setting drywall compound? KUIPORNG Remodeling 11 01-11-2007 08:22 AM
does the floor really need to be level before laying tiles? KUIPORNG Flooring 29 11-03-2006 11:56 PM
How to get string level? AllGoNoShow Carpentry 7 10-05-2006 12:30 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.