Quote:
Originally Posted by GardenConcepts
Never had a problem with water- heavy rain will flow over top of the pavers. The epoxy only sits on the bottom of the perimeter course. I have one install from 6-7 years ago that is still good.
|
I'd agree with this as well. Although it may not seem ideal in theory, it seems to work very well in practice. I've done quite a few installations similar to this, but with a flexible adhesive on the perimeter vs. epoxy. All have held up well to the harsch winters we commonly see here. I've even dry-laid the brick infill before w/o issue, but I always use polymeric sand.
I should state though that I only do this on new concrete bases that I have installed myself, as I'm not willing to gamble on top of existing failing concrete that I dn't have any insight on.