Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Remodeling

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 02-28-2009, 10:39 AM   #1
Newbie
 
Join Date: Feb 2009
Posts: 3
Rewards Points: 10
Default

skimming bathroom


hi

i am getting part of my bathroom installed. i am keeping the existing toilet and basin, and was thinking of getting the walls skimmed rather than papered. can a tradesman skim around existing stuff and does the wallpaper need to be removed first.

thanks

pmunroe is offline   Reply With Quote
Old 02-28-2009, 11:38 AM   #2
Member
 
Join Date: Mar 2007
Location: Long Island, NY
Posts: 9,519
Rewards Points: 2,000
Default

skimming bathroom


What do you call skimming?
Ron

Ron6519 is offline   Reply With Quote
Old 02-28-2009, 11:48 AM   #3
Newbie
 
Join Date: Feb 2009
Posts: 3
Rewards Points: 10
Default

skimming bathroom


applying plaster to the walls for a smooth finish, then painted, rather than wallpaper
pmunroe is offline   Reply With Quote
Old 02-28-2009, 01:03 PM   #4
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,094
Rewards Points: 1,000
Default

skimming bathroom


I HAVE skimmed over wallpaper to "kill" the texture and help hide the seams so it can be painted. I don't recommend it and I don't guarantee that seams won't "telegraph" back through. Some papers will want to turn loose when the wet mud hits it. Often as the paper gets older, the corners will "round out" (the paper shrinks and pulls away). You have to cut that part out and often once you break that bond, the paper will, again, turn loose when the mud is applied. If you decide to go this route, I'd recommend cutting away any loose wallpaper (that's apparent) and priming before skimming with a quality primer. Then skim, sand, and prime/paint. No problem working around existing fixtures except you can't really get behind the tank on the commode. Same problem with painting usually, so it's not uncommon for that area to be left as-is. (Who's going to look??) If it were me I'd opt for removing the wallpaper, but that can open up another whole "can of worms".....
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Old 02-28-2009, 01:24 PM   #5
Newbie
 
Join Date: Feb 2009
Posts: 3
Rewards Points: 10
Default

skimming bathroom


thank you
they are good walls and in very good condition. i think it might be best to remove old wallpaper then plaster over for a high quality finish.
do you think this would be expensive? the bathroom is approx 1.8m x 2.8 m
pmunroe is offline   Reply With Quote
Old 02-28-2009, 01:59 PM   #6
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,094
Rewards Points: 1,000
Default

skimming bathroom


Expensive is a relative term and I really can't give an answer to that aspect. There are many variables such as how difficult it is to get the paper down; are you going to remove it or the contractor; how much damage is inflicted on the walls getting the paper down (seldom does it just come right down, but you may get lucky). I would at least try removing some paper to see how hard it's going to be. That may be the deciding factor. And I'm guessing the conversion would work out to maybe 5' x 8'??? I'm not much on metric conversion........
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Old 03-01-2009, 06:29 AM   #7
Man of many hats
 
wrangler's Avatar
 
Join Date: Oct 2008
Location: Florida Panhandle
Posts: 505
Rewards Points: 268
Default

skimming bathroom


As far as behind the tank goes, it's all too easy to turn off the water, disconnect the water supply, drain tank and remove the two bolts holding the tank to the bowl and remove the tank itself. Then, if in the future you HAVE to, or want to change the commode, you don't have to worry about an unfinished portion of the wall showing. 10-15 mins, and usually no new replacement parts needed.

__________________
Man of many hats
wrangler is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Wiring in New Addition? sandyman720 Electrical 6 11-27-2011 03:34 PM
Steps for Bathroom Remodel? SeattleHome Building & Construction 7 10-09-2008 11:04 AM
Basement Bathroom Circuit design drtpdee Electrical 6 01-03-2008 10:10 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.