Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Remodeling

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 05-10-2013, 02:18 PM   #1
Member
 
Join Date: May 2013
Location: Arlington MA
Posts: 53
Share |
Default

Remodel - order of operations


Hello, I just bought an old (1928) house in Arlington MA, and there's a lot of work to be done! I'd like some advice on the order that the projects should be done in. I plan to be in the house for at least 10 years, possibly for good.

1)The house is on oil, has steam radiators for heat, and no AC. I'd like to convert to gas and add central heat and AC, and the ducts necessary for that. Remove oil tank, boiler, steam pipes, radiators, baseboards.
2) It has a kitchen that will be taken down to the studs and built new, electric stove to be replaced with gas.
3) It has a great walkout basement that I'd like to finish someday, and add a half bath. I'd like a separate utility room vs having equipment currently centrally located.
4) The inspector pointed out that most of the copper and brass (yes brass) plumbing is at end of life and should be replaced. I'm thinking PEX for all supply lines
5) main drain stack is cast iron, visible rusting in basement, likely need large section replaced. It vents through the roof, attic section has large rusted out hole, needs replacement. Maybe replace all with PVC?

Basement insulation and framing is something I can do myself over time. Can I start that after ducts are in place? Or should that be done before?

I need a lot of plumbing work that will be done by a pro. Should bathroom framing be up, and should flooring be done before they can add a toilet and drain? I'm thinking 1" rigid foam over concrete, then tile.

Thanks in advance for advice!

Rekonn is offline   Reply With Quote
Old 05-10-2013, 02:53 PM   #2
JOATMON
 
ddawg16's Avatar
 
Join Date: Aug 2011
Location: S. California
Posts: 7,232
Default

Remodel - order of operations


Welcome Rekonn.....at least your off to a good start....you more or less know what you want to do....and you got your location in your profile....your doing better than most first time posters...we usually get a "How do I fix this" kind of question.

Pictures would help a lot....

Your list is long and involved. I'm assuming you plan to live in the house while all the work is being done. This will involve some logistics in having a usable bathroom and kitchen while you live there.

Personally...move in...get a fell for what needs to be done first. Obviously you want to do infrastructure stuff first....like plumbing....and during the summer...the heating...it really sucks to be without heat in the winter....

So post some pics and we can take it from there....we love helping you spend your money....

__________________
"The dream is free but the hustle is sold separately."

My 2-Story Addition Build in Progress Link ... My Garage Build Link and My Jeep Build Link
ddawg16 is online now   Reply With Quote
Old 05-10-2013, 03:33 PM   #3
Framing Contractor
 
Join Date: Feb 2009
Location: NE Ohio
Posts: 1,094
Default

Remodel - order of operations


Here is a quick order.

Plans and permits
Foundation work if any needed
Demolition
Framing (including windows and doors)
Rough Plumbing
Rough HVAC
Rough Electric
Roofing
Concrete in basement or garage
Siding including gutters and downspouts
Insulation
Drywall
Finish carpentry and flooring
Painting
Finish plumbing, hvac, and electric

This should give you a general idea, not written in stone though.
sixeightten is online now   Reply With Quote
The Following User Says Thank You to sixeightten For This Useful Post:
zakany (05-14-2013)
Old 05-10-2013, 04:01 PM   #4
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,323
Default

Remodel - order of operations


How's the roof?
If it needs replacing I'd do that first.
Anything below the roof will be trashed if it's not in good shape.
Efficient windows, insulation pay for it's self over time.
__________________
When posting in forums, letting us know your location will help others give better feedback/advice/solutions to your questions
joecaption is online now   Reply With Quote
Old 05-10-2013, 04:08 PM   #5
Member
 
Join Date: Mar 2013
Location: Chicago suburbs
Posts: 214
Default

Remodel - order of operations


Paraphrasing, your item list is...

Quote:
1)Convert to Gas
2)Kitchen Remodel
3)Finish Basement, add 1/2 bath and utility room
4)Replace plumbing with Pex
5)Replace drains with PVC
I would do them in this order...
1
5
4
2
3

Really, 1, 5, 4 can be worked on more or less at once. This is all HVAC and plumbing stuff. You could spend a year or more on just this.

I would do all of this first cuz you want a solid drain, water supply, and heat for the winters before you tackle things like bathrooms and kitchens. (how you gonna hook up the kitchen and baths w/o the water done first?)

2 (kitchen) is something you can probly live with.

3 (basement) should be done absolutely last. Given how much else you have to do, it could be 5 years before you get to this. You're gonna want your basement fully accessible for the other 4 items.

Other things will factor in here. Like how is your oven and dryer powered? Are they gas? If not are you converting them too? You want to stub out all your gas work in one shot. Whether you hook up to it now or in 2 years when you get around to the kitchen or laundry room is secondary.

Pictures!
-mike
SquishyBall is offline   Reply With Quote
Old 05-10-2013, 06:22 PM   #6
Member
 
GBrackins's Avatar
 
Join Date: Apr 2012
Location: Fairhaven, Massachusetts
Posts: 2,854
Default

Remodel - order of operations


Welcome to the Forum!

I'd start with the exterior and work my way in. Make sure you have a weather tight shell. Spring-Summer-Fall best time for exterior. Dawg has a good point and your heating system, Mass winters can be fun in case you're new to the area. You'll need a licensed plumber for your plumbing and heating system conversion and permits (at least they do in the South Coast area). Ask family and friends for recommendations and make a few appointments and bring them in to access your home.

if you are big time cooks then the kitchen would be a priority, if not get other things to your liking first. switching out electric to gas is not a big deal (need a licensed plumber or pipe fitter) for gas installation. (again at least in my area of Mass).

duct work located within conditioned space does not require insulation or leak testing, if in the unfinished basement it will require both. Finishing your basement is a nice winter project since you can't get out and work in the yard (except with your snow blower).

As other have stated I'd live in the house a few years to figure out what finished space you want in the basement. We're coming up on year 3 and am finally planning out what we want to do in the basement. You'll find out what activities are not easily accomplished in your existing living space. Insulation is easily doable on your part.

Check with your town and find out if they have adopted the Mass Stretch Energy Code, or if it is based upon the 2009 International Energy Conservation Code.

Here are links to code requirements, and the Board of Building Regulations and Standards for Mass:

2009 International Residential Code (basis for Mass Residential Code) http://publicecodes.cyberregs.com/ic...2009/index.htm

Massachusetts Amendments (changes to the above code) you'll have to check both to know what is required http://www.mass.gov/eopss/consumer-p...tial-code.html

2009 International Energy Conservation Code http://publicecodes.cyberregs.com/ic...2009_cover.htm

Mass Stretch Energy Code http://www.mass.gov/eopss/consumer-p...formation.html

Board of Building Regulations and Standards (people that make the rules) http://www.mass.gov/eopss/consumer-p.../csl/bbrs.html

Town of Alington Building Department/Inspectional Services http://www.town.arlington.ma.us/Publ...pections/index

Hope this helps! Good luck!
__________________
Gary

"You get what you pay for, and sometimes free costs more!"
GBrackins is offline   Reply With Quote
Old 05-11-2013, 03:39 PM   #7
Member
 
Join Date: May 2013
Location: Arlington MA
Posts: 53
Default

Remodel - order of operations


Awesome, that's a lot of feedback! I don't have time yet to go through and properly respond, just wanted to say thanks!
Rekonn is offline   Reply With Quote
Old 05-12-2013, 10:10 AM   #8
Member
 
Join Date: Mar 2009
Location: British Columbia Canada
Posts: 460
Default

Remodel - order of operations


I would choose to use abs vs pvc for my drains.
fixrite is offline   Reply With Quote
Old 05-14-2013, 09:31 PM   #9
Member
 
Join Date: May 2013
Location: Arlington MA
Posts: 53
Default

Remodel - order of operations


Ok, got some time, pics were requested, here you go:





Rekonn is offline   Reply With Quote
Old 05-14-2013, 10:23 PM   #10
Member
 
Join Date: May 2013
Location: Arlington MA
Posts: 53
Default

Remodel - order of operations


ddawg16 - I've been reading a lot of posts lately, found you can't get any useful info on hvac or insulation without knowing location, so I figured it would be good to put that in. Yup, I'll be living in the house while all work is being done.

sixeightten - thx!

joecaption - Inspector said roof was good, per sellers, it was put on in 2002. I'm happy I don't need to do anything with that that soon. For fun though, I am thinking of some remodels that would involve changing the roofline.

SquishyBall - makes a lot of sense, thx! Yes, the current (severly dated) kitchen is functional and we can live with it for a while. Oven and dryer are electric. I like the idea of putting all gas lines in place in one shot, then hookup when convenient. I definitely want a gas oven/range. Not sure if switch is worth it for dryer, but having the option would be nice.

GBrackins - I moved to Mass during the blizzard filled winter of 2010, when a local newspaper was comparing snowfall totals to Shaquille O'Neal's height (just joined the Celtics then). Baptism by ice, hehe.

I looked into gas conversion, National Grid confirmed my house can get it, but it might take 3 months!

Looks like my town has adopted the Mass Stretch Energy Code and it's in effect. That's a lot of reading material...

fixrite - why abs?
Rekonn is offline   Reply With Quote
Old 05-14-2013, 10:35 PM   #11
Member
 
Join Date: May 2013
Location: Arlington MA
Posts: 53
Default

Remodel - order of operations


I did a radon test during the inspection period, and it came back with a result of 4.0 pCi/L. I bought a radon detector LINK, and it's been showing values between 7 and 8.1 the last 2 days. Is this something that should be addressed before everything else? If it's not safe in the basement, can't really get much done.
Rekonn is offline   Reply With Quote
Old 05-18-2013, 10:23 AM   #12
Member
 
Join Date: May 2013
Location: Arlington MA
Posts: 53
Default

Remodel - order of operations


As a test, I moved the radon detector to the 2nd floor just to make sure I didn't get some defective unit that always showed a high level no matter what. It now shows a level of 1.2. So, definitely looks like there's a radon issue to solve. I've been doing some research, I think I like the idea of putting in an HRV system. The idea of fresh air being brought in and exhausting stale air continuously sounds good.
Rekonn is offline   Reply With Quote
Old 05-18-2013, 10:30 AM   #13
Member
 
GBrackins's Avatar
 
Join Date: Apr 2012
Location: Fairhaven, Massachusetts
Posts: 2,854
Default

Remodel - order of operations


you could also contact your local Board of Health in regards to the Radon.

__________________
Gary

"You get what you pay for, and sometimes free costs more!"
GBrackins is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Master bathroom remodel - at a crossroad now GregsBarn Project Showcase 7 05-20-2013 08:56 PM
Landscaping Order of Operations ncc1701 Landscaping & Lawn Care 1 03-04-2013 08:53 PM
Looking for door suggestions- Kitchen Remodel Jim F Remodeling 5 02-11-2011 08:59 PM
General Steps to a bathroom remodel jdt141 Building & Construction 1 01-10-2011 07:32 PM
remodel box for wall fixture DIYGST Electrical 4 01-02-2010 03:21 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.