Order of renovating bathroom on diy shows


I like watching these hgtv and diy bathroom shows for ideas. I can't help but to notice that almost always they tile the floor first after demo or after drywalling. I've always known it as

- demo
- Framing
- roughing
- backer board
- drywall
- finish backer
- finish drywall
- tile walls
- tile floor
- paint
- trim and doors
- fixtures and furniture

J187 is offline   Reply With Quote
Old 04-16-2009, 07:47 PM   #2
Member
 
Join Date: Nov 2008
Location: West Michigan
Posts: 4,292
Rewards Points: 2,120
Default

Order of renovating bathroom on diy shows


I hadn't noticed that. I have noticed the procedure they sometimes teach for tiling walk-in showers. They put a rubber membrane down under the floor tile and bring it about six inches up the wall. Everything above that 6" just has cement board, thinset and tile. No waterproofing on the walls.

gma2rjc is offline   Reply With Quote
Old 04-17-2009, 11:11 AM   #3
Stuck in the 70's
 
Blondesense's Avatar
 
Join Date: Sep 2008
Location: south central Missouri
Posts: 2,162
Rewards Points: 1,018
Default

Order of renovating bathroom on diy shows


I suspect the reason they tile first has to do with their deadlines. They only have so much time to film the show and complete the project so anything that takes substantial drying time (like thinset and grout) gets started first.
Blondesense is offline   Reply With Quote
Old 04-17-2009, 01:04 PM   #4
RDS
Member
 
Join Date: Feb 2008
Location: Northern New Jersey
Posts: 226
Rewards Points: 150
Default

Order of renovating bathroom on diy shows


Quote:
Originally Posted by Blondesense View Post
I suspect the reason they tile first has to do with their deadlines. They only have so much time to film the show and complete the project so anything that takes substantial drying time (like thinset and grout) gets started first.
Possibly, but that doesn't explain why (as J187 notes) they so often tile the floor before the walls. That has always puzzled me, too.

And gma2rjc's right, I've never once seen waterproofing of shower walls discussed, except once when they put plastic behind the backerboard.

I'm only partway through my first bathroom (my own), so am basically an ignoramus about this, but I'm curious: Why would you paint after tiling? Seems to me if you do it the other way around, there's no need to worry about protecting your nice new tile floor from the occasional paint drip or scuff damage from the ladder/staging/etc. For this reason, I was planning to 1) put backerboard on walls, 2) paint drywall, 3) tile walls, 4) put backerboard on floor, 5) tile floor. I realize it's not maximally efficient but is there any other reason not to do it this way? Thanks.
RDS is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
renovating a bathroom valie Flooring 2 01-27-2009 08:58 PM
Renovating basement bathroom???? Oldyota Plumbing 1 01-10-2009 07:51 AM
Bathroom flooring order will_53115 Flooring 3 12-06-2008 05:00 PM
bathroom issues, renovating DIY help wombosi Plumbing 1 11-04-2008 10:06 PM
Bathroom Install order will_53115 Plumbing 1 09-12-2008 11:38 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.