Here is my situation:
Total kitchen remodel.
Wall cabinets in- Base cabinets in place but not screwed to wall.
Appliances arrived (in garage)

Looking for a general order to go from here.
Do I screw all base cabinets in and then slide dishwasher/oven in- or start on one end ans work my way down? In other words- get dishwasher hooked up and then screw sink cabinet to wall etc? then work my way down to stove? Just want to make sure if I need to move something a fraction or so- I still can to accomodate appliances.

Huskyfan68 is offline   Reply With Quote
Old 11-24-2012, 05:16 PM   #2
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,372
Rewards Points: 72
Default

kitchen remodel order


Are all the walls painted before the cabinets went in?
Who designed this layout?
In most cases you start in the corners and work your way way out.
Without seeing what exactly you have it's hand to suggest a whole lot.
Do you have cabinet clamps.
Have you marked where the studs are?
Do you have cabinet screws?

joecaption is online now   Reply With Quote
Old 11-24-2012, 06:05 PM   #3
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,633
Rewards Points: 22
Default

kitchen remodel order


I like to mount the uppers first so I don't have to work over the base cabinets---but that is not a 'must do'

First step is to establish the high point in the floor----using the longest level you have--determine the high spot---mark a line on the wall 34 1/2" above that spot--(check the height of your base cabinets in case your cabinets are not 34 1/2")

Snap a level line using that mark----this is what you will use to level the cabinets---start in a corner--lazy Suzann if you have one---

Start champing the face frames together and pre drilling and screwing the cabinets together---the doors must be removed so be careful not to mix them up----shim the bottoms and screw the backs to the wall using your snapped line---when you get to the dishwasher hole----

DW is 24" wide opening----if you are smart you will cut two 24" wide spacer sticks---add a longer stick on top of that---then clamp the spacer to the cabinets----it's a common error to have that opening shift and ruin your installation,

Check your walls for plumb before you start----coping the cabinets or a filler might be needed to keep the cabinets level against a crooked wall.
__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
The Following User Says Thank You to oh'mike For This Useful Post:
joecaption (11-24-2012)
Old 11-24-2012, 06:06 PM   #4
Member
 
Join Date: Mar 2011
Location: Ohio
Posts: 1,646
Rewards Points: 0
Default

kitchen remodel order


paint first if you haven't. start in a corner like joe said. its easier if you mark all the studs first then you can put the cabinets in easier and faster. usually the floor is done before appliances go in. some people prefer to do the floor before the cabinets. i raised all my cabinets up 3/4 of an inch to compensate for the tile floor i was installing. always check your floor to find the lowest and highest spot. if you start at the highest spot you can shim the other cabinets up to that level. if you start at the low point you will be ripping the toe kick off to get the cabinets level. if you measure up at the high point and strike a level line around the wall you have a reference point for all of the cabinets.
DannyT is offline   Reply With Quote
Old 11-24-2012, 06:09 PM   #5
Member
 
Join Date: Aug 2012
Posts: 212
Rewards Points: 0
Default

kitchen remodel order


Like Oh'mike said establish the high spot of the floor first!
__________________
If my advise helped you hit "Thanks"
Hammer450R is offline   Reply With Quote
Old 11-25-2012, 03:12 PM   #6
Newbie
 
Join Date: Mar 2012
Posts: 17
Rewards Points: 0
Default

kitchen remodel order


remember the 24" for d/w is measured from the lip of the cabinets ,and not the body

terry603 is offline   Reply With Quote
The Following User Says Thank You to terry603 For This Useful Post:
oh'mike (11-30-2012)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
1930s Kitchen Remodel zeldarizona Painting 17 08-26-2011 04:41 AM
Kitchen remodel ideas/design needed, with PICs amdspitfire Kitchen & Bath Remodeling 4 04-16-2011 09:11 AM
Kitchen remodel advice J187 Remodeling 7 11-15-2010 02:47 PM
Kitchen Remodel - 101 allen1466 Remodeling 5 06-22-2007 08:56 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.