Forums | Home Repair | Home Improvement | Painting | Interior Decorating | Remodeling | Landscaping


Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Remodeling

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 08-23-2009, 09:38 AM   #1
Newbie
 
Join Date: Dec 2008
Posts: 5
Share |
Default

drywalling over cold air return chase


I am finishing my basement and attempting to hang drywall for the first time. I ran into an issue where I have a cold air return chase in the ceiling between two joists. I have to drywall beneath a section of the return. I figured a could remove the screws that hold the sheet metal tight to joists so they do not puncture the drywall, and the drywall once up will hold the metal panning tight to the joists. My problem is that the metal panning has a splice joint that joins two pieces of metal panning together. When I hung my drywall it popped my drywall out a bit but did not break the paper. Should I remove the drywall and add drywall paper shims around the splice so it does not affect the drywall when i screw it up?

Last edited by avshockey; 08-23-2009 at 07:07 PM.
avshockey is offline   Reply With Quote
Old 08-23-2009, 10:37 PM   #2
Member
 
Join Date: May 2009
Location: anoka county mn
Posts: 280
Default

drywalling over cold air return chase


I'm assuming they must have used pan head screws or something, you can remove any of those screws and use small nails instead on that, also if it were me i'd remove that splice piece and use a few strips of that metalic tape / duct tape . ive never seen anyone use a splice piece or panhead screws on cold air returns though , are you sure its a cold air return??
oldrivers is offline   Reply With Quote
Old 08-29-2009, 08:53 AM   #3
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,083
Default

drywalling over cold air return chase


My return at the furnace has is spliced with the metal "joint" I believe you're referring to. I have seen it in runs between floor joists on occasion. Oldrivers has the right idea though with the metal tape on the joint after you take the spline out. You could also use tape to temporarily hold the actual metal to the joists until you get the drywall up. No need to replace the panheads that way.....
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Old 09-08-2009, 05:48 PM   #4
Member
 
Join Date: Jun 2008
Location: Normal, IL
Posts: 118
Default

drywalling over cold air return chase


Is the return not level with the joists? I cannot see how the screws will go all the way thru the drywall for 5/8's drywall.
bkeech is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Electric wire in cold air return bvbellomo Electrical 8 01-08-2009 06:01 PM
Basement Cold air return Bcoleman6 HVAC 2 06-07-2008 08:42 AM
move cold air return or add extra hot air CamL HVAC 2 03-26-2008 12:43 AM
Cold Air Return near ceiling or floor? jakobus HVAC 3 07-21-2005 10:54 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.