Cost Savings


Ok, about to start a basement finish (DIY). (Well, my husband is.

3200 square feet. Exterior basement walls are superior walls (nailer built into concrete studs) and are almost 9 feet high.
Question is on the interior stud walls.

2 by 4 by 10 foot is $3.38 each here in Michigan
2 by 4 by 7 feet id $1.33

Using 7 footers instead of 10 footers would save us about 50% IF

We build a short 20 inch wall, bottom plate, top plate, 16 oc, etc. Then we nail a top plate to the floor joists above and toe nail in 7 foot stids between the 20 inch wall and the top plate on the ceiling.

If we use 10 foot studs, a 10 foot wide wall costs $37.18.
If we use the 'wall on wall' method with 7 foot studs, the cost would be $19.95 plus extra nails.

(time does not matter, i won't let him do anything else anyway )

See any problems with codes or practical problems, electrical will be above 20inches anyway.

basement1 is offline   Reply With Quote
Old 02-26-2010, 01:22 PM   #2
Member
 
Join Date: Jan 2009
Location: South of Boston, MA
Posts: 17,248
Rewards Points: 2,000
Default

Cost Savings


I would never build a small wall then another wall on top
Just not the right way to do it

Scuba_Dave is offline   Reply With Quote
Old 02-26-2010, 01:49 PM   #3
Old School
 
Willie T's Avatar
 
Join Date: Jan 2009
Location: St. Petersburg, FL Minds of moderate caliber ordinarily condemn everything which is beyond them.
Posts: 3,634
Rewards Points: 2,000
Default

Cost Savings


Your $19.95 seems to neglect to take into consideration the additional $5 or so for the third top plate.

But that matters little. As Dave said, this is not an acceptable way to construct a solid wall. Most building departments would likely reject it. It creates what is referred to as an artificial and unnecessarily imposed moment of inertia that, in effect, weakens the structure of the wall.
__________________
"True eloquence consists in saying all that is necessary, and only that which is."
François Duc de La Rochefoucauld
Willie T

Last edited by Willie T; 02-26-2010 at 02:16 PM.
Willie T is offline   Reply With Quote
Old 02-26-2010, 06:03 PM   #4
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,108
Rewards Points: 1,028
Default

Cost Savings


Do the job correctly and buy the 10' studs.....
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Old 02-26-2010, 06:09 PM   #5
Member
 
Join Date: Nov 2009
Location: central virginia mountains
Posts: 1,857
Rewards Points: 1,000
Default

Cost Savings


buy 9' pre cuts= 104-5/8" they be cheaper than 10' and less waste. doubt box store has would need real lumber store
__________________
The older I get the better I was
tpolk is offline   Reply With Quote
Old 02-26-2010, 06:55 PM   #6
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,108
Rewards Points: 1,028
Default

Cost Savings


Tplok is correct, sorry I missed that. Was thinking 10' walls. HD and Lowes here have pre-cut 9' studs. If not in your area, check out the lumber yards.
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Old 02-26-2010, 09:08 PM   #7
Registered User
 
Termite's Avatar
 
Join Date: Apr 2008
Posts: 6,520
Rewards Points: 2,000
Default

Cost Savings


Although there's no code-based reason to reject a wall on top of another wall (assuming all of the walls are non-load-bearing), I wouldn't suggest it. If the walls are bearing it is going to be a problem because it creates what is called a hinge wall, therefore full-height studs are required.

Buy 9' precut studs that are 104-5/8". Plan on two top plates if you're sheetrocking the ceiling. One top plate and you're screwed when you try to hang sheetrock to the walls after hanging the ceiling.

You're mighty early in the remodeling process to be evaluating materials costs as hard as you are. Have you figured in tapcons to anchor the bottom plate? Additional materials for fireblocking? Drill bits for the tapcons? Etc...........

Termite is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Furnace Installation Cost philstewart HVAC 32 04-13-2014 02:44 PM
Lowest Cost heating method calculator ? Scuba_Dave HVAC 12 11-19-2009 05:10 PM
Can we get a cost estimate subforum going Will1987 Site Feedback and Suggestions 8 04-02-2009 08:57 AM
Hot Water Heater Installation Cost philstewart Plumbing 6 10-29-2008 06:05 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.