Hi - new here. Been looking at the website and gathering information for some time now but now I need some advise if possible...
I am remodeling a 1950's bathroom which appears that it was remodeled 3 times before this.

It had tile glue, paneling, plywood, you name it on the walls on top of a the old plaster board sheets. I decideded to do it right...it has been torn down to the bare rough cut lumber studs to be started over from the beginning. What I can't figure out is the door and window frames. From the stud to the end of the window and door frames average about 7/8 - 1 inch. So if even if I buy 5/8 drywall, my drywall will not be even with the window and door frames leaving me up to a 1/2 possibly which will not allow an even transition from the drywall to the frame area. Hopefully I am explaining this correctly. I have seen of people planing this down to match but there is no way, that is way too much to do.
Any suggestions? I'm trying to avoid tearing anymore items out!

Thanks. Nate