Bathroom ReDo From GA.


Hi again. I introduced myself in the welcome section. Now I need get on with it and start this project.

My plan is to completely redo my master bath. It is a small bath 4x8 including the shower stall. The floors and shower are tiled. My plan is to gut all the way to the studs, replace rotten subfloor, replace toilet, vanity/sink, retile shower (replace pan) and to put tile in from floor to ceiling. I will also replace the window (energy efficient). The house was built in 1979 approx. The tile was set in concrete on the floor, no wooden subfloor, not sure about the shower yet.

Why do I want to gut it all? Mildew, mold, and rotten everything else. I have not used this bathroom in over a year. So if it takes me 6 months to redo, I havn't lost anything.

I need to work things in my mind first and visualize how it should go. My question is the sequence of events. What comes first. Once I have that laid out, I can proceed. However, I have already done some demo and will need to get started soon, before the critters come up from the floor. Yes, I removed some of the tile and concrete and hit daylight.

So here is my sequences as I have worked it in my mind, please offer advice and any suggestions.

1. Remove, toilet, vanity.(after shutting off H2O)
2. Remove shower tile, down to pan.
3. Demo down to studs.
4. Inspect wiring and plumbing (have professional fix both, to code)
5. Remove floor tile/concrete/ shower pan.
6. Remove window
7. Start remodel- Start with sub floor and window- Same day.
May need to sister a couple of joists, won't know until I get under there.
8. Install ventilation fan
9. Have shower pan built. (son-in-law)
10 Tack roofing paper to studs
11 Backerboard to walls and subfloor. No sheet rock. Why don't you put walls up snug to the floor. Should there be a very small gap?
12 Tile shower, shower pan Which one first, the pan or the shower walls?. Then tile floor and walls. Which comes first? Do I tile the walls first or the floor. How do I join the two?
13. Replace toilet and vanity.
14. Fixtures.

See 14 easy steps, yeah right. I am sorry this is so long, but I would appreciate all input.

Thanks again.

Gilj.

Advertisement

gilj is offline   Reply With Quote
Old 05-28-2009, 12:41 AM   #2
Member
 
Join Date: Feb 2009
Location: Seattle, Washington
Posts: 344
Rewards Points: 250
Default

Bathroom ReDo From GA.


I need a little more info, Will there be any drywall in this bath, the ceiling I assume, any other walls get sheetrock?

Advertisement

Mop in Hand is offline   Reply With Quote
Old 06-02-2009, 05:38 PM   #3
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,116
Rewards Points: 1,044
Default

Bathroom ReDo From GA.


The drywall does not go all the way to the floor because it will "wick" water and deteriorate if there is any type of "flood". On a standard 8' wall, the studs are cut 93-5/8" long and there is a single bottom plate and double top plate making the walls actually 97-1/8" tall. Hang the ceiling first and you end up with 96-5/8". The drywall either laid down or stood up is only 96", leaving the NECESSARY gap at the bottom. As a rule, it is common to tile a shower from the floor up.......
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Old 06-02-2009, 06:47 PM   #4
Registered User
 
Join Date: Mar 2009
Posts: 9,986
Rewards Points: 2,038
Default

Bathroom ReDo From GA.


Get the fan there before the electrician, or have him supply it.

BJ, your math doesn't work for me...........LOL. Be safe, G
Gary in WA is offline   Reply With Quote
Old 06-02-2009, 10:12 PM   #5
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,116
Rewards Points: 1,044
Default

Bathroom ReDo From GA.


You're right GBAR, that should have been 92-5/8" for the stud length. I need "math check" as well as "spell check" I guess....
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Basement bathroom rough in efrobert Plumbing 2 06-23-2011 05:54 PM
Plumbing Help for New Basement Bathroom morphers82 Plumbing 2 03-14-2009 01:17 AM
Bathroom Redo 2008! manofthehill Remodeling 3 08-12-2007 01:10 PM




Top of Page | View New Posts