Hi my name is Steve and this is my first post.

I am getting ready to start a unfinished basement remodel and had a question.

House is 20+ years old and has water treated Cinder block walls on the outside below grade and inside as well. I have also had a company come out within the last year to make sure there was no heaving on my walls. There will need to be a drop ceiling to replace the one that used to be there and due to duct work etc... I live in Atlanta Georgia.

My plan is to attach 2x4's to the cinder block walls using Tapcon screws with the 4" part of 2x4 against the wall(flat) 16" O.C to save space and then using Pink Rigid insulation between the 2x4s attached directly to the block walls with some sort of adhesive. I will use 1/4" beaded paneling for walls.

Questions:
1) Is this an acceptable way to build a wall?
2)How do I determine how thick my insulation should be?
3) What is a good adhesive to use

Thanks for any advice

steve
swalke2 is offline   Reply With Quote
Old 12-16-2008, 01:25 PM   #2
Member
 
Join Date: Jul 2007
Posts: 1,467
Default

Another basement


Check with your local authorities. You might need drywall covering the foam to get the required burn through time. They will also know what R value insulation you should use.

No point using 2x4s, you could use 2x2s or you could use the foam board that is grooved out for 1x3 furring strips.

Or you could just build a "normal" 2x4 wall. Some folks would get tired of putting in all those tapcons and would find it easier to nail up a wall.

Be aware that you will need enough wall thickness for electrical boxes.
jogr is offline   Reply With Quote
Old 12-16-2008, 01:33 PM   #3
Newbie
 
Join Date: Dec 2008
Posts: 4
Default

Another basement


Ill check on that burn time.

I actually found a box that is made for that voltage and that is narrow enough for a 2x4 on flat.

Thanks!
swalke2 is offline   Reply With Quote
Old 12-16-2008, 01:59 PM   #4
Member
 
Join Date: Jul 2007
Posts: 1,467
Default

Another basement


Quote:
Originally Posted by swalke2 View Post
I actually found a box that is made for that voltage and that is narrow enough for a 2x4 on flat.

Thanks!
What's it's wire fill capacity? Some of the dinky boxes can only handle a terminal end (one romex in and none out) and don't have enough capacity to put in the middle of a run (1 romex in and one out).
jogr is offline   Reply With Quote
Old 12-16-2008, 02:08 PM   #5
Newbie
 
Join Date: Dec 2008
Posts: 4
Default

Another basement


Quote:
Originally Posted by jogr View Post
What's it's wire fill capacity? Some of the dinky boxes can only handle a terminal end (one romex in and none out) and don't have enough capacity to put in the middle of a run (1 romex in and one out).
Looks to be enough for one in, maybe "middle of a run" but my intention is to put a Junction box in the ceiling for each wall and then run a drop from the junction box to the outlet box (probaby 2 per wall).
swalke2 is offline   Reply With Quote
Old 12-16-2008, 02:14 PM   #6
Member
 
Join Date: Jul 2007
Posts: 1,467
Default

Another basement


Quote:
Originally Posted by swalke2 View Post
Looks to be enough for one in, maybe "middle of a run" but my intention is to put a Junction box in the ceiling for each wall and then run a drop from the junction box to the outlet box (probaby 2 per wall).
The box will have a fill limit based upon it's volume.

All those junction boxes in the ceiling (which must remain forevermore accessible) sound like a real pain and will be an obvious diy job. Doing it right with the correct wall boxes is easier, better, cheaper and faster.
jogr is offline   Reply With Quote
Old 12-16-2008, 02:29 PM   #7
Newbie
 
Join Date: Dec 2008
Posts: 4
Default

Another basement


Quote:
Originally Posted by jogr View Post
The box will have a fill limit based upon it's volume.

All those junction boxes in the ceiling (which must remain forevermore accessible) sound like a real pain and will be an obvious diy job. Doing it right with the correct wall boxes is easier, better, cheaper and faster.

Yeah I see what your saying, but I think no matter what I would have to bring the electrical up the wall. The 2x4's are flat against the wall and can really be drilled. There is also a drop ceiling that will always be in place.

How do I determine the fill limit of the box?

Thanks for the help
swalke2 is offline   Reply With Quote
Old 12-16-2008, 04:20 PM   #8
Newbie
 
Join Date: Oct 2008
Location: Chicago
Posts: 24
Default

Another basement


I'm still not sure why you do not want to build just a "normal" 2x4 wall spaced 1/2'' from your cinderblock wall. This helps with your electrical boxes, for hanging anything on walls (it gives you the 4 inches instead of 2 to screw anything heavy into), also and possibly most important it will ensure you have straight walls. Your cinder block walls may not be true, by building your own walls you will make sure that all of your walls are straight. Just some ideas, it is up to you in the end.
RobandStacey is offline   Reply With Quote
Old 12-16-2008, 07:35 PM   #9
Member
 
Join Date: Oct 2008
Location: Wisconsin
Posts: 228
Default

Another basement


Quote:
Originally Posted by swalke2 View Post
Looks to be enough for one in, maybe "middle of a run" but my intention is to put a Junction box in the ceiling for each wall and then run a drop from the junction box to the outlet box (probaby 2 per wall).
Use a 4x4 box with a plaster ring to bring it back to a single gang. You can get the required capacity to run a circuit in and out without adding boxes above the ceiling.

As the others have suggested, I would just frame a 2x4 wall in front of the block unless you have a serious space constraint. You'll thank yourself later.
__________________
Some advice you receive on the internet can be worth exactly what you paid for it - be careful.
stubborn1 is offline   Reply With Quote
Old 12-17-2008, 12:25 PM   #10
Member
 
Join Date: Nov 2008
Posts: 101
Default

Another basement


Does your building code allow you to attach the studs directly to the cinder block, whether treated or not?

I agree with the others. Build the walls conventionally, leaving a 1/2" gap between the 2x4's and cinder block.
Jeeper1970 is offline   Reply With Quote
Old 12-17-2008, 01:41 PM   #11
Drywall contractor
 
Join Date: Jul 2008
Location: Lilburn, GA
Posts: 2,083
Default

Another basement


2"x4" walls is the proper way to frame your walls. As noted above, that way you can be sure they're straight and square. That's a big necessity for your drop ceiling! Also if you decide to go with paneling, put a layer of 1/4" sheetrock up first to give solid backing.
__________________
If you can read this, thank a teacher. If you can read this in English, thank a soldier. Support our troops.
bjbatlanta is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
basement floor drain problem radioiowa88 Plumbing 5 10-22-2008 10:52 PM
Sunlight for a Basement Room prglor Remodeling 1 08-31-2008 04:29 PM
Basement mhughrob Remodeling 1 07-11-2008 07:11 PM
Basement Renovation Project Howdy Electrical 6 03-13-2008 11:07 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.