![]() |
2nd story porch post replacement
have three posts supporting front gable, deck has been renewed and want to install new 4x6 posts, do i need to drill through deck to block columns supporting deck from first story porch or can i use simpson boots and drill carriage bolts into deck floor joists,porch size is app 20wx8d
|
Quote:
Generally the load needs to be carried down to the base support. |
| All times are GMT -4. The time now is 09:52 PM. |
© 2003 - 2010 The Building Network LLC