Top step question


I'm in the process of replacing all the treads and risers on my basement project. The top step to the upstairs floor has no overhang of any kind. I'm looking for suggestions. The carpet you see in the photos will be replaced with hardwood in the next year or so, but not right now. As it is, the floor is 90 to the riser. What I have in mind at this point is to use a piece of perhaps 1/4" wood of some kind and cover the existing OSB and let the alum finisher over hang it. I would use drywall, but I fear toes would have it in shambles in short order.

The one with the treads showing is to make sure I'm going at this right. I held the treads out from the studs 1 1/4" to allow for 1/2" drywall and 3/4" baseboards.


Last edited by MikeKy55; 09-11-2011 at 08:29 AM.
MikeKy55 is offline   Reply With Quote
Old 02-16-2011, 06:37 PM   #2
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,460
Default

Top step question


Can you lay a straight edge onto the front of the steps extending it through the door?

It would help to see how deep the stair nosing at the top (door opening) must be to keep all the stair noses the same.

Where are your risers? If you are going to have them,get them in before the door /stair nose is made.

__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
Old 02-16-2011, 06:42 PM   #3
Tileguy
 
Bud Cline's Avatar
 
Join Date: Mar 2006
Posts: 10,010
Default

Top step question


That much extension looks pretty dangerous to me. Looks as if it might tend to roll over a short time. There's a trip to a hospital. Is that thing also glued?
Bud Cline is offline   Reply With Quote
Old 02-16-2011, 06:43 PM   #4
Member
 
MikeKy55's Avatar
 
Join Date: Nov 2009
Location: Louisville KY
Posts: 321
Default

Top step question


Probably. If I understood what you meant. Sorry I'm a little slow tonight. Do you want to know how much nosing there is on the other steps? There is no overhang/nosing at all on the top step.
MikeKy55 is offline   Reply With Quote
Old 02-16-2011, 06:46 PM   #5
Member
 
MikeKy55's Avatar
 
Join Date: Nov 2009
Location: Louisville KY
Posts: 321
Default

Top step question


The top step will be replaced. In fact I still have 4 to replace. Should have mentioned that.

Yes there will be risers. I plan on using 1X material there. I am using 2 X 12's for the treads. I don't have enough room to stretch the stringers out to make the rise less, so I increased the treads so you have room for your foot when stepping down.
MikeKy55 is offline   Reply With Quote
Old 02-16-2011, 07:33 PM   #6
Stair builder
 
Join Date: Aug 2010
Location: Seattle
Posts: 252
Default

Top step question


I've read your post twice and still don't know what you are trying to do.

Landing tread is applied by the floor guys. It comes rabbeted for 1 1/4" nosing.

Skirts go on before risers and risers go on before treads. Landing strip goes on last.
Keith Mathewson is offline   Reply With Quote
Old 02-16-2011, 07:33 PM   #7
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,460
Default

Top step question


Got you----When the step are set (temporary or permanently) then you will be able to determine what you need for the top stair nosing-

You will do this by laying a long straight edge up the new stairs and into the door opening--slip a scrap of your new upstairs flooring through the door until it bumps into the straight edge--Mike---
__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
Old 02-16-2011, 07:37 PM   #8
Stair builder
 
Join Date: Aug 2010
Location: Seattle
Posts: 252
Default

Top step question


Ol Mike,
That assumes that the carriages are cut correctly. Better to measure nosings off the riser face so as to keep nosing distance constant and not exceed 1 1/4" max code allowance.
Keith Mathewson is offline   Reply With Quote
The Following User Says Thank You to Keith Mathewson For This Useful Post:
oh'mike (02-17-2011)
Old 02-16-2011, 07:47 PM   #9
Member
 
MikeKy55's Avatar
 
Join Date: Nov 2009
Location: Louisville KY
Posts: 321
Default

Top step question


Quote:
Originally Posted by oh'mike View Post
Got you----When the step are set (temporary or permanently) then you will be able to determine what you need for the top stair nosing-

You will do this by laying a long straight edge up the new stairs and into the door opening--slip a scrap of your new upstairs flooring through the door until it bumps into the straight edge--Mike---
Ok, ok, ok, now I got the straight edge thing, ha ha. I was racking my little pea brain on that one. So simple it went right over my head.

Thanks everyone. Now I have a better grip on what I need to do. Likely I will end up replacing the nosing on the very top step/kitchen floor twice, but thats okay. When I get to the hardwood flooring, I will just have to replace the nosing on that top step/floor/landing so as to match whatever hardwood we use.
MikeKy55 is offline   Reply With Quote
Old 02-16-2011, 10:44 PM   #10
Registered User
 
Join Date: Mar 2009
Posts: 9,968
Default

Top step question


It must be my old eyes..... it appears you have triangular blocks nailed on 2x6's for carriages (stringers)?

Usually, just add a 2x4 to the wall side of the stringers for the perfect 1-1/2" space needed. Much stronger and positive nailing to the studs.


Gary
__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.
Gary in WA is offline   Reply With Quote
Old 02-17-2011, 01:34 AM   #11
STAFF
 
BigJim's Avatar
 
Join Date: Sep 2008
Location: East Tennessee
Posts: 7,227
Blog Entries: 1
Default

Top step question


Quote:
Originally Posted by MikeKy55 View Post
The top step will be replaced. In fact I still have 4 to replace. Should have mentioned that.

Yes there will be risers. I plan on using 1X material there. I am using 2 X 12's for the treads. I don't have enough room to stretch the stringers out to make the rise less, so I increased the treads so you have room for your foot when stepping down.
One thing to be sure of is to not have too much over hang of the treads as it will be a toe catcher.

The landing tread on the top landing will look good. You will have to cut the door jamb and trim for it to go under.

__________________
New members: Please consider adding your location to your profile.

Jim
BigJim is online now   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
An unasked question is the only dumb question jackie treehorn Kitchen & Bath Remodeling 1 09-20-2009 08:24 PM
Unfinished step around wood laminate floors markq Flooring 7 07-17-2009 07:19 PM
A question about water preassure. reasonforseason Plumbing 5 04-14-2009 04:36 PM
Basement Renovation Question KUIPORNG Remodeling 234 08-26-2008 08:19 AM
hrv question indep HVAC 3 07-17-2008 10:39 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.