I really am just guessing here so please help, lol...
1. Remove drain plate and unscrew shower spicket
2. Cut all caulk with a blade
3. Somehow (really need help here) remove the enclousure
4. Install cememt board with special screws
5. Latex caulk between cement board seams
6. Appy thinset and v-notch it
7. Install tiles with spacers
8. Grout (not sure what type to use)
9. Possibly spray on sealer to just the grout or the entire surface?
Just thought of a few more things...Going to need a "hump" on the floor to keep water in, Frame it with 2x4s and cover it with cement board?
Blah, another thing I just thought have, I already have a tiled floor, I assume I have to keep the same tile design as the floor?
1. Remove drain plate and unscrew shower spicket
2. Cut all caulk with a blade
3. Somehow (really need help here) remove the enclousure
4. Install cememt board with special screws
5. Latex caulk between cement board seams
6. Appy thinset and v-notch it
7. Install tiles with spacers
8. Grout (not sure what type to use)
9. Possibly spray on sealer to just the grout or the entire surface?
Just thought of a few more things...Going to need a "hump" on the floor to keep water in, Frame it with 2x4s and cover it with cement board?
Blah, another thing I just thought have, I already have a tiled floor, I assume I have to keep the same tile design as the floor?