Old 02-28-2004, 04:54 AM   #1
LARRY
Guest
 
Posts: n/a
Unhappy

Larry's New House


QUESTION: My framer made a mistake and put TJI hangers to high. He says he can fix it by ripping the bottom part of the TJI 2 inches, and then lowering the TJI into the hanger. he says it will not effect the strength of the TJI. Is this correct?

  Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 02-28-2004, 08:30 AM   #2
HCI
Newbie
 
Join Date: Feb 2004
Posts: 2
Default

Larry's New House


do you mean the framer wants to notch the TGI to fit into the hanger? If so, STOP HIM. Have him remove the hanger and lower them the 2". Yes he will weeken the TGI and you may not pass your framing inspection.

HCI is offline   Reply With Quote
Old 02-28-2004, 12:53 PM   #3
Member
 
Join Date: Dec 2003
Posts: 67
Default

Larry's New House


If you want to give him a confirmation that it's not acceptable goto www.trusjoist.com and download their TJI manual. It specifically states no cutting of the top or bottom flange. I call it a flange - they might call it chord.
hatchet is offline   Reply With Quote
Old 02-28-2004, 04:34 PM   #4
Member
 
Grumpy's Avatar
 
Join Date: Dec 2003
Location: Chicago
Posts: 588
Send a message via AIM to Grumpy Send a message via MSN to Grumpy Send a message via Yahoo to Grumpy
Default

Larry's New House


I was on a jobsite once and I was watching the GC supervising his framers who were putting a pre-engineered floor joist in backwards so the AC duct space didn't line up. I told him it was backwards and needed to be flipped around. He shrugged and said "We'll just cut the hole in the joist.

I didn't complain since it's not my problem but my point is: These "I'll just...." answers are always a big problem. He should do it to the plan specifications.
__________________
-Grumpy

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


Sometimes the savings that comes from doing it yourself can be blown away with one mistake.

The information found in this post is not to be considered legal advice. All information should be considered relative, not specific. Never attempt any repairs you are not comfortable with. Always maintain safety! The author of this post takes no responsibility for any losses that occur. Use at your own risk.
Grumpy is offline   Reply With Quote
Old 03-01-2004, 05:39 AM   #5
PRO
 
Glasshousebltr's Avatar
 
Join Date: Feb 2004
Posts: 52
Default

Larry's New House


First thing you should do, is make sure your framer is not smokeing crack.
Glasshousebltr is offline   Reply With Quote
Old 03-01-2004, 08:47 PM   #6
Member
 
Grumpy's Avatar
 
Join Date: Dec 2003
Location: Chicago
Posts: 588
Send a message via AIM to Grumpy Send a message via MSN to Grumpy Send a message via Yahoo to Grumpy
Default

Larry's New House


The framers were obviously unskilled laborers and the GC was doing his own framing, by instructing the unskilled guys. I guess the GC was also obviously unskilled. As a matter of fact I spoke with himm today about an unpaid partial balance.
__________________
-Grumpy

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


Sometimes the savings that comes from doing it yourself can be blown away with one mistake.

The information found in this post is not to be considered legal advice. All information should be considered relative, not specific. Never attempt any repairs you are not comfortable with. Always maintain safety! The author of this post takes no responsibility for any losses that occur. Use at your own risk.
Grumpy is offline   Reply With Quote
Old 03-06-2004, 06:02 AM   #7
LARRY
Guest
 
Posts: n/a
Default

Larry's New House


Thanks everyone for the comments. It helped, I told the framer to lower the hanger the 2" and he did. I also told him to stop smoking crack on the job. Larry
  Reply With Quote
Old 03-06-2004, 03:04 PM   #8
Member
 
Join Date: Dec 2003
Posts: 67
Default

Larry's New House


LOL.. way to go.
hatchet is offline   Reply With Quote
Old 03-16-2004, 06:07 AM   #9
LARRY
Guest
 
Posts: n/a
Default

Larry's New House


Larry again folks. This time my framer is saying although we signed a contract for a certain amount, he is not able to complete the job because he says the plans were wrong. The roof system does not match the plans, he says the designer, the engineer and whoever else put it togeather was not in the field to see it did not work the way they designed it. My question is, who is most lible for screwing up. The designer, the carpenter, or the engineer?
  Reply With Quote
Old 03-16-2004, 06:38 AM   #10
Member
 
Join Date: Dec 2003
Posts: 67
Default

Larry's New House


Here's the way I look at it. If the framer did a takeoff they should have seen issues before they ever started work. And even if the plans are wrong - how different could 2 roofs be on the same house. If it goes from hip to gable it's the same amount of wood and vice versa.
Tell the framer to meet with the designer/engineer for a couple hours and figure it out - and offer to pay for the 2 hours of coordination. Then when you have it figured out tell him to quit his damn whining and do what he promised in the contract.

hatchet is offline   Reply With Quote
Reply


-->
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Cape Cod Style House Attic/Crawl Space Insulation Help Danielg Insulation 24 05-21-2012 09:20 AM
replumbing an old house simonfrog Plumbing 7 01-30-2012 05:45 AM
200 Amp service really needed for a 830 sq ft house? overkill? alexz Electrical 7 11-16-2009 06:54 PM
Re-siding house jdig Building & Construction 5 04-10-2007 10:15 AM
Will my house make my kids sick??? jokrupinski General Discussion 18 09-29-2006 05:05 AM


Top of Page | View New Posts


All times are GMT -4. The time now is 03:15 PM.


© 2003 - 2010 The Building Network LLC