Installing pre-hung door over tile to laminate transition
I have a door way in which I will be installing a prehung door. This door will have 2 different types of flooring under it, tile and laminate. What is the proper order to install the door? Door then floor. Or floor then door?
If I install the door first, I will have to undercut the jams 2 seperate heights correct? One for the laminate, and one for the tile?
Edit: Also, I don't believe the difference in heights between the two floors will be too different, therefore is it acceptable to install both floors first, then the door?
Last edited by aldgagnon; 10-25-2010 at 10:56 AM.
|