how to attach 2x10 on a 6 inch post?


Do you attach 2 2x10s on one side, or split 1 2x10 on one side and 1 2x20 on the other?

GCO88 is offline   Reply With Quote
Old 07-05-2012, 07:38 AM   #2
DIY staff
 
Join Date: Sep 2009
Location: Kane county,Illinois
Posts: 21,412
Default

how to attach 2x10 on a 6 inch post?


What are you building? Sounds like maybe a deck girder?

__________________
New members: Adding your location to your profile helps in many ways.--M--
oh'mike is offline   Reply With Quote
Old 07-05-2012, 10:35 AM   #3
Newbie
 
Join Date: Jul 2012
Posts: 5
Default

how to attach 2x10 on a 6 inch post?


Building a deck I can either notch out 3" x 10" on one side or notch out 1 1/2" on each side?
GCO88 is offline   Reply With Quote
Old 07-05-2012, 10:45 AM   #4
Member
 
Join Date: Jul 2008
Location: NW of D.C.
Posts: 5,990
Default

how to attach 2x10 on a 6 inch post?


Quote:
Originally Posted by GCO88 View Post
Building a deck I can either notch out 3" x 10" on one side or notch out 1 1/2" on each side?
I'd do 1.5" on each side and since the deck weight is carried by the shoulder you cut into the wood, minimal fasteners would be needed to secure these joists unless there are significant sideways forces.
Yoyizit is offline   Reply With Quote
Old 07-05-2012, 11:48 AM   #5
Member
 
Join Date: Jul 2010
Posts: 1,731
Default

how to attach 2x10 on a 6 inch post?


deleted

Last edited by DexterII; 07-05-2012 at 12:03 PM.
DexterII is offline   Reply With Quote
Old 07-05-2012, 02:46 PM   #6
Member
 
Join Date: Mar 2012
Location: Massachusetts
Posts: 221
Default

how to attach 2x10 on a 6 inch post?


Quote:
Originally Posted by GCO88 View Post
Do you attach 2 2x10s on one side, or split 1 2x10 on one side and 1 2x20 on the other?
This is at least the second time this has come up since I joined. The answer is maybe. Let me explain.
First split beam designs maybe banned by code or require signoff from a SE, but more importantly it is possible to under size the beams.
For a normal deck the load is assumed to be equally distributed across the surface for sizing purposes. Using this assumption, the length of the joists supported by a beam are linearly proportional to the width of the beam (2 by, 3 by 4 by, double 2 by, etc)If your deck supports point loads or exordinary loads, such as a hot tub, then additional calculations are required.
how to attach 2x10 on a 6 inch post?-beamload.jpg
The attached drawing shows a simple layout with split beams. The colored boxes represent the area of load for each of the "2 by" beams. If the beam was actually a "double 2 by" then the beam on the right would carry the total load of the blue and green area, while the beam on the left would carry the total load of the red and purple area which in this the load from the red area far exceeds half the total load.

What does this mean in the real world? For most decks people use the beam/joist tables using the maximum joist length from the design (green and red in the attachment). As you can this maximum yields a maximum supported load that is greater than or equal to any load any beam would actually see.

On the otherhand if you calculate and size beams individually, then it is possible that some beams may be undersized when split. For example, you size a double 2 by beam to handle the red and purple loads. Then you decide to split the beam. Remeber the length of a joist (distributed load)that a beam will support is lineraly proportional to the beam width, therefore when spliting a beam each 2 by has to support half the load. In this case the red load far exceeds half the combined load.

Hope that helps. I don't like to simply accept "because the code says", there usually is a logical explanation backed by engineering for what is in the code.
goosebarry is offline   Reply With Quote
The Following User Says Thank You to goosebarry For This Useful Post:
GCO88 (07-05-2012)
Old 07-05-2012, 02:57 PM   #7
Member
 
Join Date: Mar 2012
Location: Massachusetts
Posts: 221
Default

how to attach 2x10 on a 6 inch post?


Forgot one thing in accordance with the AWC Perscriptive Residential Wood Deck Construction Guide, a split beam should not be lag bolted to the side of the post (page 8 figure 9).
goosebarry is offline   Reply With Quote
The Following User Says Thank You to goosebarry For This Useful Post:
GCO88 (07-05-2012)
Old 07-05-2012, 05:28 PM   #8
Civil Engineer
 
Join Date: Mar 2009
Location: Boston
Posts: 4,167
Default

how to attach 2x10 on a 6 inch post?


If you are building to the International Residential Code, which is pretty common in the U.S., you are not permitted to split the beam. There is a diagram of the allowed attachment method in the Prescriptive Guide, which clearly shows that you notch the post for the full width of the doubled beam (typically 3 inches), then use 1/2 inch minimum diameter bolts (not lag screws unless allowed by your building inspector, and not carriage bolts unless specifically allowed by your building inspector). Alternatively, you can attach the beam to the top of the post using a Simpson type bracket.

If you are not building to IRC, follow the applicable code requirements. If there is no code in your area, I would follow IRC, it is pretty complete, it is conservative, and it is easy to follow.
Daniel Holzman is offline   Reply With Quote
The Following User Says Thank You to Daniel Holzman For This Useful Post:
GCO88 (07-05-2012)
Old 07-05-2012, 05:43 PM   #9
Member
 
Join Date: Jul 2008
Location: NW of D.C.
Posts: 5,990
Default

how to attach 2x10 on a 6 inch post?


I stand corrected.
Yoyizit is offline   Reply With Quote
The Following User Says Thank You to Yoyizit For This Useful Post:
GCO88 (07-05-2012)
Old 07-05-2012, 06:18 PM   #10
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 2,040
Default

how to attach 2x10 on a 6 inch post?


Put them together and use a bracket on top of the post. If you can't find one for a 3" beam then add a filler chunk if you have to.
mae-ling is offline   Reply With Quote
The Following User Says Thank You to mae-ling For This Useful Post:
GCO88 (07-05-2012)
Old 07-05-2012, 06:44 PM   #11
Member
 
Join Date: Mar 2012
Location: Massachusetts
Posts: 221
Default

how to attach 2x10 on a 6 inch post?


Quote:
Originally Posted by Daniel Holzman View Post
If you are building to the International Residential Code, which is pretty common in the U.S., you are not permitted to split the beam. There is a diagram of the allowed attachment method in the Prescriptive Guide, which clearly shows that you notch the post for the full width of the doubled beam (typically 3 inches), then use 1/2 inch minimum diameter bolts (not lag screws unless allowed by your building inspector, and not carriage bolts unless specifically allowed by your building inspector). Alternatively, you can attach the beam to the top of the post using a Simpson type bracket.

If you are not building to IRC, follow the applicable code requirements. If there is no code in your area, I would follow IRC, it is pretty complete, it is conservative, and it is easy to follow.
Daniel,
Do you know when the restriction was added? I remember back in the day it was popular because it was easy to notch and aesthetically pleasing.
goosebarry is offline   Reply With Quote
The Following User Says Thank You to goosebarry For This Useful Post:
GCO88 (07-05-2012)
Old 07-05-2012, 08:37 PM   #12
Civil Engineer
 
Join Date: Mar 2009
Location: Boston
Posts: 4,167
Default

how to attach 2x10 on a 6 inch post?


My town runs under the 2006 IRC, and split beams are not permitted under that code. The restriction may be older, I have not researched any further back.

Daniel Holzman is offline   Reply With Quote
The Following 2 Users Say Thank You to Daniel Holzman For This Useful Post:
GCO88 (07-06-2012), goosebarry (07-05-2012)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Compressor terminal post wiring connector came apart - remnant still sticking to post justplumducky HVAC 11 07-06-2011 08:04 PM