half wall construction


I'm going to replace the banister shown in the pic with a "half wall". there is a floor joist running parallel to that existing banister so I'll have some good "nailing". my question is whether I should nail each stud to the joist or whether I should have a "plate" at the bottom and nail THAT to the joist. any suggestions for making the end of the wall sturdy so that it doesn't "wobble"?

tnx,
Attached Thumbnails
half wall construction-rail-001.jpg  

Advertisement

analogmusicman is offline   Reply With Quote
Old 08-25-2011, 05:21 AM   #2
Member
 
m1951mm's Avatar
 
Join Date: Apr 2011
Location: SW Ohio
Posts: 494
Rewards Points: 250
Default

half wall construction


I would build the half wall as a separate piece. Top plate, bottom plate and the studs inbetween. That way you can nail or screw the studs from top and bottom straight in, not having to toe nail. Then set the whole half wall in place and secure to the joist. Since I tend to do over kill I would double up the two outsides with 2 studs giving more meat to attach to the wall (hoping there is a stud on the wall there for you) and more support to the outside (free standing) edge. By doing the separate bottom plate you are giving yourself a better place to attach the drywall and the baseboards or other trim of your choosing.

By the look of your run you might want to think about a receptical on that half wall. By building the wall freestanding you can predrill for the wire for it. If you are like me I do not have a small head drill, and predrilling the holes for the wire into the studs would be easier done prior to building the wall.

I am hoping someone else will follow to answer how to secure the free standing side so it does not wavy in the wind. The drywall should keep it all from moving around, but if there is a more safe method I too would love to know.

Advertisement

__________________
Mickey
Fantasy Walls and Windows

www.picturetrail.com/mickey51

Last edited by m1951mm; 08-25-2011 at 05:55 AM.
m1951mm is offline   Reply With Quote
Old 08-25-2011, 06:51 AM   #3
old guy contractor
 
tcleve4911's Avatar
 
Join Date: Nov 2010
Location: Maine on Little Sebago
Posts: 858
Rewards Points: 502
Default

half wall construction


If that Newel post is still sturdy, how about fastening your 1/2 wall to that?
tcleve4911 is offline   Reply With Quote
The Following User Says Thank You to tcleve4911 For This Useful Post:
12penny (08-25-2011)
Old 08-25-2011, 07:04 AM   #4
Member
 
m1951mm's Avatar
 
Join Date: Apr 2011
Location: SW Ohio
Posts: 494
Rewards Points: 250
Default

half wall construction


My question to attaching the new wall to the existing newel post would be, how do you make it look good?? with drywall and all?? Does the new wall end with a newel post of just with corner bead and drywall,

This could be way out there, but what if you run a level from your existing handrail to the bottom and find a space where the thickness would allow you to add a furring strip for support for the drywall?? You still would need to address squaring off the top with corner bead for the wall. With the balisters you would have more than enough space to nail drywall and trim????????? I am totally out of sense here, but to me it would work?

In thinking more about this you will need a square top plate to make the drywalling easier. Sorry for so may thoughts, but atleast I am thinking!! If you used the existhing handrail you would have to square it off for the drywall. Who Knows, Maybe that could work with adding a 2x4 on top, but you would still have the issue of the newel post top to deal with.
__________________
Mickey
Fantasy Walls and Windows

www.picturetrail.com/mickey51

Last edited by m1951mm; 08-25-2011 at 08:57 AM.
m1951mm is offline   Reply With Quote
Old 08-25-2011, 09:31 AM   #5
Member
 
amuffly's Avatar
 
Join Date: Aug 2011
Location: Wichita
Posts: 41
Rewards Points: 25
Default

half wall construction


Actually just did a project like this a few weeks ago for my brother in law. We built a half wall using 2 x 6 ' an did a top and bottom plated filled with studs at 16" on center. Used deck mate screws and glue to build. Attached to wall and floor using remaining deck mate screws. Also used 4 lags screws spaced on bottom plate to help hold it to the sub floor. To help strengthen even more you will want to run the drywall past the half wall and sub floor by a 1' or so. That way you won't have a drywall seems where the two walls meet.
amuffly is offline   Reply With Quote
Old 08-25-2011, 10:17 AM   #6
Too Old
 
Join Date: Mar 2011
Location: South of North
Posts: 345
Rewards Points: 250
Default

half wall construction


I don't know how handy you are but this is an easy job if you know what you are doing. As stated by previous posts here are a couple things to think of.
Electrical outlets are 6 and 12 for spacing it looks like you will need at least 2, how many outlets are on that circuit?
You will need to pull back the carpet and most likely relocate the tack strip. Build the wall with extra care on the strength of the end, nothing worse then a loose pony wall.
What are you using for a cap? you will need to be carfull and make sure the material and layout does not go into the window.
What is on the stairway wall? Drywall or plaster? You will have to match the new wall to the stairway wall so be sure to do a good layout or you will not be happy when you drywall the pony wall.
Get a plan together and make sure you have it fugured out to completion.
__________________
"Yeah, it's a nice garage, but you have to keep it heated at all times so it doesn't mess up your roof line."
havalife is offline   Reply With Quote
Old 08-25-2011, 11:13 AM   #7
Not so new
 
12penny's Avatar
 
Join Date: Nov 2008
Location: Lehigh Valley, Pa.
Posts: 934
Rewards Points: 504
Default

half wall construction


Quote:
Originally Posted by tcleve4911 View Post
If that Newel post is still sturdy, how about fastening your 1/2 wall to that?
Agreed...that end post should go thru floor and attach to joist below. Build the wall in between and cover it all with GWB.
12penny is offline   Reply With Quote
Old 08-25-2011, 03:44 PM   #8
Member
 
analogmusicman's Avatar
 
Join Date: Feb 2008
Location: colorado springs
Posts: 591
Rewards Points: 500
Default

half wall construction


Originally Posted by tcleve4911
If that Newel post is still sturdy, how about fastening your 1/2 wall to that?

thanks for all the input. that's an interesting idea about leaving the post on the end and attaching the wall to that. wonder if my "assistant" would go for that?
anyway, it'll work out somehow. I'll post a pic whenever I can.
really,my only concern is once the "banister" is removed, there'll be an 8' "drop-off" to keep people away from. glad I don't have kids or pets!!

ps: there'll be 1 outlet on the new wall, the "romex" will come up from an outlet directly below.

tnx,

Advertisement

analogmusicman is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Retaining Wall and Muddy Yard rjschwar Landscaping & Lawn Care 10 02-24-2010 01:55 PM
Wall - LOAD BEARING: How to Move? user49172 Building & Construction 1 03-11-2009 05:48 PM
Retiling half the wall omanalansan Carpentry 10 08-13-2008 01:41 PM
Framing a half wall for a bar QueenL Building & Construction 12 04-02-2008 11:47 PM
Garage wall construction question Bjonas Building & Construction 4 01-01-2008 05:18 PM




Top of Page | View New Posts