Ok couple quick questions I need some opinions on these.

1. Is 39.3 degrees considered steep?

2. Stringers need to sit on concrete, should set on treated blocks or entire stringer treated?

3. 2x10 or 2x12? Two outside stringers can be attached to walls.

4. If 2x12, can I get by with two stringers, width is 37 inches.


I guess that is four questions but oh well, toss me some opinions.

jackpine is offline   Reply With Quote
Old 01-24-2013, 09:40 PM   #2
Member
 
Join Date: Mar 2011
Location: Ohio
Posts: 1,646
Default

Basement steps couple questions


is this inside or outside? 39.3 degrees from horizontal or 39.3 from verticle/ 45 degrees is plenty steep. risers need to be around 7-8 inches with no more than 1/4 variance from one step to another and the treads are 10 or 11. you can't just go from point A to point B and call it good. i'm sure others will add and correct me.

DannyT is offline   Reply With Quote
Old 01-24-2013, 09:57 PM   #3
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,912
Default

Basement steps couple questions


Got a picture?
You can cut into the under sides of the stringers for a pressure treated 2 X 6 or 2, 2 X 4's. That will keep the stringers in alignment and allow then to be attached to the floor.
Need 2 X 12's and really should have three of them.
If the stringer come up againt a wall you need to add a 2 X 4 to the bottom, side of the strinker to hold it out away from the wall enough to fit sheetock and the skirt board.
http://www.blocklayer.com/stairs/stairseng.aspx
joecaption is offline   Reply With Quote
Old 01-25-2013, 05:00 AM   #4
Indentured Servant
 
Join Date: Sep 2008
Location: Grand Rapids Minnesota
Posts: 129
Default

Basement steps couple questions


Ok, so I will just cut the bottom stringer and insert a treated base, use three 2x12 stringers instead of the 2 2x10 stringers I am replacing. I like the idea on holding the stringer away from the walls for sheetrock, but an inch and a half is way too much, I will probably tack on a small strip of a 1 inch board along the stringer.

Danny I am way beyond that stuff already.
jackpine is offline   Reply With Quote
Old 01-25-2013, 07:04 AM   #5
Member
 
GBrackins's Avatar
 
Join Date: Apr 2012
Location: Fairhaven, Massachusetts
Posts: 2,813
Default

Basement steps couple questions


an inch and a half is way too much? what is the combined width of 1/2" drywall and a 1x skirt board?
__________________
Gary

"You get what you pay for, and sometimes free costs more!"
GBrackins is offline   Reply With Quote
Old 01-25-2013, 09:37 AM   #6
Indentured Servant
 
Join Date: Sep 2008
Location: Grand Rapids Minnesota
Posts: 129
Default

Basement steps couple questions


That is just one way to do it.
jackpine is offline   Reply With Quote
Old 01-25-2013, 10:48 AM   #7
journeyman carpenter
 
woodworkbykirk's Avatar
 
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,656
Default

Basement steps couple questions


Quote:
Originally Posted by GBrackins View Post
an inch and a half is way too much? what is the combined width of 1/2" drywall and a 1x skirt board?

1 1/4".. 1x stock is actually 3/4 .. 5 /4 is actually 1".. . so in fact youll have a 1/4 gap remaining between the stringer and the skirt board, this small space will allow some shimming of the skirtboard to keep it running fairly straight.. once thats done the riser board and treads get installed. its standard practice in construction
woodworkbykirk is offline   Reply With Quote
Old 01-25-2013, 11:02 AM   #8
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,912
Default

Basement steps couple questions


Once the skirts in place you can add base cap moulding to cover up any gaps and make it look better.
http://www.tiloindustries.com/profil..._profiles.html

What differance would it make in your mind if the stringer was held off by 1-1/2?
joecaption is offline   Reply With Quote
Old 01-25-2013, 11:33 AM   #9
Indentured Servant
 
Join Date: Sep 2008
Location: Grand Rapids Minnesota
Posts: 129
Default

Basement steps couple questions


Point taken. I will set it off that far. I probably should rock the walls then before I install the stringers. Is there any advantage to using an LVL product over 2x12? And what about riser and tread material? I was looking at pine or spruce/fir to match our other trim through out the house.
jackpine is offline   Reply With Quote
Old 01-25-2013, 11:57 AM   #10
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,912
Default

Basement steps couple questions


If you plan on attaching the outside stringer to the wall do not sheetrock before installing it. It will flex.
joecaption is offline   Reply With Quote
The Following User Says Thank You to joecaption For This Useful Post:
woodworkbykirk (01-25-2013)
Old 01-25-2013, 12:07 PM   #11
Indentured Servant
 
Join Date: Sep 2008
Location: Grand Rapids Minnesota
Posts: 129
Default

Basement steps couple questions


I shouldn't attach it through the sheet rock to the wall?
jackpine is offline   Reply With Quote
Old 01-25-2013, 12:28 PM   #12
Indentured Servant
 
Join Date: Sep 2008
Location: Grand Rapids Minnesota
Posts: 129
Default

Basement steps couple questions


I suppose the 2x4 should be attached to the walls first, then the stringers attached to the 2x4. Otherwise I will need some real long screws when all I will really need is a nail gun.
jackpine is offline   Reply With Quote
Old 01-25-2013, 12:32 PM   #13
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,912
Default

Basement steps couple questions


I use 1/2 lag bolts, one every other stud and it's not going any place.
I attach the 2 X 4 to the stringer, set it in place and mark the studs, take it down and predrill clearace holes then put it back in place.
joecaption is offline   Reply With Quote
Old 01-25-2013, 04:53 PM   #14
Indentured Servant
 
Join Date: Sep 2008
Location: Grand Rapids Minnesota
Posts: 129
Default

Basement steps couple questions


Ok quick run to the lumber yard after work and picked out 3 nice 2x12 12 feet long. Treads were picked over junk so I am going to temp in some dimensional stuff I have around. No risers either yet. Picked up a dozen 5 inch x 1/2 lag bolts, Spax brand name. No pre-drilling needed they say. Made in Germany? Never heard of them. Now the layout. Total run is 9 feet. Total rise is 95 1/4 inches. I'll do the math and start the layout..
jackpine is offline   Reply With Quote
Old 01-25-2013, 05:42 PM   #15
journeyman carpenter
 
woodworkbykirk's Avatar
 
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,656
Default

Basement steps couple questions


lvls do work for stringers they have far less bounce than regular lumber but cost waayyyyy more..

as for installing the drywall first, you lose 1/2" off the lenght of the fastener grabbing anything solid plus the fastener can flex in that 1/2".

for riser stock you can very easily use good one side plywood, my stair installers do it all the time to keep costs down and match the tread material

woodworkbykirk is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Basement Finishing Questions lmf232s Remodeling 3 01-20-2012 09:04 PM
Installing radiant heating in a basement and general basement questions... CarlsonRower General DIY Discussions 6 12-09-2011 12:32 AM
Basement Reno Take II...A Couple of Questions monsterbash Building & Construction 3 08-25-2010 09:16 PM
Basement Sump Pump & Dimpled Plastic Membrane Interior Questions cloves Building & Construction 0 03-24-2010 09:44 PM
Basement Return Questions 108Stitches HVAC 5 02-03-2009 10:56 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.