Basement Framing


I've started framing my basement and so far so good.
My question is....is it VERY important to leave a gap in-between the top header and floor joist?
Most of my walls have a 1/4" gap but one of them is a tight fit because of a floor slope. I have yet to hammer it in because not sure if I need to take it down and cut a 1/4" of each stud. (Would be a nightmare!)
Thanks in advance for opinions!!

Kjm25bball is offline   Reply With Quote
Old 05-14-2011, 05:34 PM   #2
timthetoolman
 
Join Date: Oct 2007
Location: Milwaukee
Posts: 58
Rewards Points: 75
Default

Basement Framing


Don't pound in a wall that doesn't fit. I have seen this lift floor joists. If not it will definitely put a strong bow to your new studs. A tight fit is fine... but 1/4'' is too much. You should cut each stud but considering it doesn't sound like you are putting up a load bearing wall, you could always cut notches into your top plate of the new wall every 16" or so to fit around joists.

timthetoolman is offline   Reply With Quote
Old 05-14-2011, 09:41 PM   #3
Newbie
 
Join Date: May 2011
Posts: 11
Rewards Points: 10
Default

Basement Framing


Great IDEA!! Didn't even think about that!!!

THANKS!!!
Kjm25bball is offline   Reply With Quote
Old 05-14-2011, 09:45 PM   #4
Framing Contractor
 
Join Date: Feb 2009
Location: NE Ohio
Posts: 1,098
Rewards Points: 508
Default

Basement Framing


Snug fit is ok. If it is so tight that it bows the stud, remove that particular stud, cut it shorter, and toe nail in place. Most of the time I install top and bottom plates and cut each stud in place.
sixeightten is offline   Reply With Quote
Old 05-16-2011, 01:00 PM   #5
Newbie
 
Join Date: May 2011
Posts: 11
Rewards Points: 10
Default

Basement Framing


Quote:
Originally Posted by timthetoolman
Don't pound in a wall that doesn't fit. I have seen this lift floor joists. If not it will definitely put a strong bow to your new studs. A tight fit is fine... but 1/4'' is too much. You should cut each stud but considering it doesn't sound like you are putting up a load bearing wall, you could always cut notches into your top plate of the new wall every 16" or so to fit around joists.
How would I go about notching the top plate? What tools do you suggest?
Thanks.
Kjm25bball is offline   Reply With Quote
Old 05-16-2011, 01:06 PM   #6
Newbie
 
Join Date: May 2011
Posts: 7
Rewards Points: 10
Default

Basement Framing


table saw works the best or you could use a router if you have one with the correct bit, just mark where your topplate it touching the joists and cut maybe a saw blade thickness extra on each side so you dont have to hammer the top plate on once you notch it
brick_layer is offline   Reply With Quote
Old 05-16-2011, 02:12 PM   #7
Newbie
 
Join Date: May 2011
Posts: 11
Rewards Points: 10
Default

Basement Framing


Quote:
Originally Posted by brick_layer
table saw works the best or you could use a router if you have one with the correct bit, just mark where your topplate it touching the joists and cut maybe a saw blade thickness extra on each side so you dont have to hammer the top plate on once you notch it
A table saw? Like remove the top plate? All of the studs are nailed together.
Kjm25bball is offline   Reply With Quote
Old 05-16-2011, 02:32 PM   #8
Member
 
SteelToes's Avatar
 
Join Date: Oct 2010
Location: Chicago Illinois
Posts: 185
Rewards Points: 150
Default

Basement Framing


If the ceiling height it’s inconsistent…build your wall on the spot
In other words attach a bottom and top plate and cut each stud on the spot.
Now in your case ...remove the top plate and measure each joist ...trim your studs to the smallest taken measurement taking in consideration top plate thickness.

Use shims to fill any gaps.

Done.

Notching a top plate in my opinion its just to much work...and unnecessary.
SteelToes is offline   Reply With Quote
Old 05-17-2011, 12:22 AM   #9
Newbie
 
Join Date: May 2011
Posts: 11
Rewards Points: 10
Default

Basement Framing


Here is the problem...the wall is all nail gunned together. It will be quite the job to take the header piece off!! Not sure what to do now. :-/

Hard to tell from the picture but there is probably about 3 inches until the wall were it should be.
Opinions??
Attached Images
 
Kjm25bball is offline   Reply With Quote
Old 05-17-2011, 01:16 AM   #10
Registered User
 
Join Date: Mar 2009
Posts: 9,967
Rewards Points: 2,000
Default

Basement Framing


Pull it down, remove top plate, cut them all, frame, add shims and sill sealer under bottom plate for a thermal/capillary break; http://www.greenbuildingadvisor.com/...-building-code
Use H.D. galv. nails in p.t. wood, add rigid foam board on concrete wall and rim joist first. Fire-stop top continuously and every 10' lineally per Code. Location establishes foam board thickness, Location?

Gary
__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.
Gary in WA is offline   Reply With Quote
Old 05-17-2011, 03:10 AM   #11
Member
 
Join Date: Dec 2010
Location: BC Canada
Posts: 500
Rewards Points: 500
Default

Basement Framing


this has happened to me on a groggy monday morning in an unlevel basement

if it's just over the span of a couple studs where you are too tight, what i've found has worked is too remove those couple studs (use a sawzall, cut the nails at either bottom or top) slam the wall in, plumb it, make sure it's square, tack it, now put those couple studs back it, just toenail them.

if your basement isn't very level i'd go with the other advice on here and stickframe it.
chrisBC is offline   Reply With Quote
Old 05-17-2011, 09:45 AM   #12
Member
 
Join Date: Apr 2009
Posts: 95
Rewards Points: 75
Default

Basement Framing


Basement floor is rarely perfectly level. You might be able to use this wall at a different location where the basement floor is a little lower.
leungw is offline   Reply With Quote
Old 05-18-2011, 12:31 AM   #13
Newbie
 
Join Date: May 2011
Posts: 11
Rewards Points: 10
Default

Basement Framing


Successfully notched the header piece. Super easy. Adjusted my skill saw to the lowest setting, made two cuts then just chipped away the notch.
Great solution!!

My next wall seems pretty short. Hope it will work!

Kjm25bball is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Insulate split framed/poured basement wall, prior to framing... pasichnyk Building & Construction 9 12-20-2010 06:32 PM
framing basement walls nickm1024cobra Remodeling 1 11-08-2010 01:06 AM
At a crossroads in my basement project - waterproofing help needed callisto9 Building & Construction 35 10-28-2010 03:01 AM
Suggestion for framing around ducts/pipe in basement xuc318 Building & Construction 2 12-19-2009 07:07 AM
Framing basement wall without covering top plate and rim joist dave11 Building & Construction 5 10-30-2009 09:38 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.