Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Concrete, Stone & Masonry

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 04-18-2014, 10:52 PM   #1
Member
 
Join Date: Jul 2007
Posts: 1,508
Share |
Default

When to schedule brickmason?


On new construction residential home do I schedule brickmason to come after I install the following exterior wall penetrations?:
1) Drier vent and oven vent ducting
2) Exterior Water spigot
3) Gas (propane) pipe entrance
4) A/C lines to outdoor unit
5) Power line to supply A/C outdoor unit

Or do I drill these penetrations out after mason is done? Or do I mark the location of these penetrations and ask mason to leave openings for these penetrations?

jogr is offline   Reply With Quote
Old 04-19-2014, 11:23 AM   #2
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,690
Default

When to schedule brickmason?


It's best to either install them first, or leave a sleeve in the wall that mimic's the size of the penetration. It's no fun trying to drill through later, but it can be done if necessary........

jomama45 is offline   Reply With Quote
Old 04-19-2014, 12:55 PM   #3
Member
 
Join Date: Jul 2007
Posts: 1,508
Default

When to schedule brickmason?


Thanks jomama45!
jogr is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
5 wires in 1/2" Schedule 80 PVC Amilsmithly Electrical 11 05-09-2013 04:20 PM
Schedule 40 PVC question OKDrew63 Electrical 9 08-20-2012 05:30 PM
Small Schedule PVC Pipe & Fittings Zekester Plumbing 2 07-26-2012 10:39 PM
Illustrated nailing schedule? cortell Building & Construction 6 11-29-2010 09:26 PM
OK to use schedule 40 & 80 conduit? Plumbvoltage Electrical 2 05-19-2009 02:27 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.