Transition From A New Pitched Patio To An Existing Level Patio - Concrete, Stone & Masonry - DIY Chatroom Home Improvement Forum


Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Concrete, Stone & Masonry

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Display Modes
Old 05-02-2013, 12:47 PM   #1
Member
 
Join Date: Sep 2009
Posts: 47
Rewards Points: 29
Default

Transition from a new pitched patio to an existing level patio


Hi,
Last year I built a paver patio for the sole purpose of putting a hot tub on it. It was just made big enough for the spa. I used pavers because I want to extend the patio over time and I want it to match instead of having a concrete pad and pavers. This year I am adding more of the patio pavers (same ones I used for the existing patio) around the spa for more of a walk way and seating area. The patio that the hot tub rests on is level with no pitch. The new patio will have a normal pitch to it and will be adjacent to the hot tub patio on two sides. I am trying to determine a plan for how to make the transition between the two. I am currently considering two options. I'm wondering if there are any other options or flaws in what I am considering and which would look best?

1. Leave a space (A few inches or so) between the adjacent sides of the existing patio and the new patio and then fill in with some decorative stone or something. My thoughts are that this will look good and provide some separation and maybe make the difference between the level vs. pitched patio less obvious?

2. Butt right up to the existing patio on both adjacent sides. I think this would also look good but wondering how it will look as the new patio pitches along it's run. I am also wondering if it would be such a good idea to dig right up to where the existing patio ends and if I would run into any kind of stabilty issues? The last thing I need is the patio giving out with a 6000lb hot tub on it! The current patio has 2 courses of retaining wall blocks around the perimeter. Each block is 3.5" high. And the top block is glued to the bottom block with construction adhesive. There is at least 6" of crusher run under the blocks. The hot tub rests entirely on the inside pavers and they have about 12" crusher run under them and a 1" sand base. The new patio is going to have a 4" base which will require me to dig down about 7" to give enough room for base,sand and 1.5" thick pavers. So, since I only need to go down 7", maybe that wouldn't pose any stability issues with the existing patio since I would barely make it to the top of the stone base that it rests on?

3. Any other transition possibilities?

Thanks for any insights!

Here is a photo of the existing patio before the spa was placed on it if that helps visualize. The new patio will go to the right and in the front of this one. The house is on the right and I will be pitching the entire patio away from the house and also pitching away from the deck along the right side.


Advertisement

barlav is offline   Reply With Quote
Old 05-03-2013, 06:20 AM   #2
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,443
Rewards Points: 2,468
Default

Transition from a new pitched patio to an existing level patio


i wouldn't bother w/any slope but 1/4" in 6' would allow surface drainage during a downpour,,, around here pavers are considered ' permeable pavement ' & usually installed level,,, # 2 sounds like the ticket

Advertisement

stadry is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Redwood Deck Over existing brick paver patio areacode516 General DIY Discussions 3 04-12-2009 10:09 PM
New Paver Patio Installation ddave23 Landscaping & Lawn Care 3 07-14-2008 11:03 AM
Attaching lean to patio roof to existing roof Jackhammer Roofing/Siding 3 05-27-2008 08:13 PM
how to level existing hardwoods before carpet lucyperry Flooring 6 01-25-2008 06:40 AM
Advice:Pouring Concrete Patio steve65 Building & Construction 3 10-10-2007 07:57 PM




Top of Page | View New Posts