Removing part of a concrete garage tire stop?


I'm currently building a house with an attached garage. Normally when the foundation is poured the builder puts in a 3' wide raised area / tire stop running the back length of the garage. We decided to extend the garage by 4' so that my truck would have plenty of room to park but they accidentally also extended the tire stop 4' as well so that it is now 7' wide, taking up enough room to where my truck will not fit inside the garage.

I suggested they fix this by using a concrete saw to shorten the tire stop back to 3', then patch the area as needed to make it geometrically correct and then finally put down some sort of epoxy sealer to hide the patch marks.

The builder strongly advises against that, saying that it might damage or cause issues with the rebar and foundation if they cut into the wires while shortening the tire stop. They suggested to simply pour more concrete on the rest of the garage to make it level with the tire stop. I am strongly against this idea however, as I feel it is a huge bandaid and also would result in having no tire stop at all, in addition to several more problems.

Does anyone have any thoughts on how best to fix this issue? The raised section is only ~2" tall. Is it really that difficult to cut away a few inches of concrete without causing damage to the slab? Thanks in advance!

Lurch96 is offline   Reply With Quote
Old 01-02-2013, 02:38 PM   #2
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,276
Rewards Points: 2,134
Default

Removing part of a concrete garage tire stop?


have your bldr send a guy over w/7" grinder & diamond cup wheel,,, you might also suggest he revisit conc 101 to find out why there shouldn't have been any rebar or wire in the 2",,, failing this, you could also switch to a smaller diam tire on the front axle

seriously, you're correct & he's not as wire mesh ONLY works twice - once when it adds strength while the conc's in tension ( green curing conc ), & 2nd, when it holds the crack'd pieces together

this would be MUCH easier than adding a 2" o'lay even IF the o'lay is bonded,,, it would also prevent the bldr from charging for the addl 2" of conc

stadry is online now   Reply With Quote
The Following User Says Thank You to stadry For This Useful Post:
concretemasonry (01-02-2013)
Old 01-04-2013, 02:39 PM   #3
Newbie
 
Join Date: Jan 2013
Posts: 3
Rewards Points: 10
Default

Removing part of a concrete garage tire stop?


Thanks for the quick reply! I'm going to try to find out just how deep the tension cables are. Assuming we can grind/cut the step back without cutting or exposing the cables, then that's what I'll plan on doing.
Lurch96 is offline   Reply With Quote
Old 01-04-2013, 02:48 PM   #4
Member
 
Join Date: Jun 2009
Location: atl & hilton head
Posts: 3,276
Rewards Points: 2,134
Default

Removing part of a concrete garage tire stop?


tensioning cables should be located 1/2 on a vertical axis - that's SHOULD BE ' on most jobs, ' those guys ' got paid & they're gone
stadry is online now   Reply With Quote
Old 01-04-2013, 07:36 PM   #5
Guywithskills
 
Join Date: Jan 2013
Location: Arizona
Posts: 33
Rewards Points: 25
Default

Removing part of a concrete garage tire stop?


Coming from extensive concrete background, you were right in the beginning. Cut the step out, reform to 3'. there normally is no reinforcing in the drive floor and if there is, it is seperate from foundation and house floor. Insure the new poor has 4" of concrete and a turndown (that goes under the step a minimum of 4") at the step. Do not let him pour it 4" higher, this will cause issues with garage door clearances for your truck, also if you wash the drive floor, will run into the house. Lots of reasons there is a step as a standard. Forget grinding, not even a considertion. Grinding is for removing a 1/4" and a small area or rounding the edge of something. This would exceed the cost of a new pour and just not right.
The builder is just going to have to suck it up for his sole error. End of discussion, the fact you wanted to have the depth to fit the truck... and then extend the curb out to the door, this made it all pointless. Dont accept a "half bake solution" he was paid "full bake money." In the end, he will be glad he corrected it with sound solutions.
If he is smart as well, he will do this without a fuss and have it go in his favor. Your expectations are reasonable.
Guywithskills is offline   Reply With Quote
Old 01-04-2013, 08:59 PM   #6
Newbie
 
Join Date: Jan 2013
Posts: 3
Rewards Points: 10
Default

Removing part of a concrete garage tire stop?


Thank you sir, excellent points!

Lurch96 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Concrete Basics for the DIYer Mort Concrete, Stone & Masonry 7 11-22-2012 11:19 AM
Garage concrete block foundation on slope gopherdad Building & Construction 3 07-30-2011 01:23 PM
3" gap between concrete driveway and garage floor need to fill frankrizzo Building & Construction 0 11-23-2010 08:08 AM
Garage concrete and driveway asphalt repairs creamaster Building & Construction 4 07-12-2008 10:51 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.