Looking for a little advice on the best way to re-grout these exterior steps, like would I just use standard concrete etc? They actually had them done a few years ago by a so-called professional, and well you can see the results!!!

Here's a couple pics at what we're looking at:
Attached Thumbnails
re-grouting steps-ftront-steps-001.jpg   re-grouting steps-ftront-steps-002.jpg  

denverboz is offline   Reply With Quote
Old 04-12-2012, 09:04 PM   #2
Member
 
Join Date: Apr 2012
Location: Va Beach, VA
Posts: 237
Rewards Points: 0
Default

re-grouting steps


I can see these steps were looking very nice at one point. A little TLC is all you need to make them shine again (figuratively). You should use a grinder with a diamond tip blade to cut out all of the old mortar approx. 1". Be careful not to cut into the stone. Use various size chisels to get the areas not accessible with grinder. Now- You have 2 options.

Option 1= Only cut and fill the joints that need it. Downside is new mortar will not match the old, and old could eventually crack away too.
Option 2= This option is the only way i would do it. Cut out ALL the old mortar.

Now that you have the mortar cut out, spray off with hose and let dry. Mix masonry mortar to a consistency of pudding. Loose enough to be squeezed through a grout bag but stiff enough to not be runny/watery. You might want to trial and error with the mix before you go grouting as you do not want to get mud on the stones and make a mess. The key is to grout the joints and leave the stones clean. Make sure to use the proper mixture of
sand/dry mortar/water.

The problem with some of these larger joints on the steps is that the joint is to big to receive mortar. You must place something sturdy underneath the hole for the mortar to sit on until it bonds to the stone. Kind of like a form for concrete. Use some wood or something to place underneath.

Once you have filled the bed and head (horizontal/vertical) joints, wait until it becomes hard and use a small margin trowel to scrap it off so its flush with the stone surface. After its all filled with new mortar it should take about 30-45 before its ready (65 degrees average).

I know this is alot of info to take in at once so no worries if you have many questions. Hope this helps.

EAGLE757

TRUEPRO is offline   Reply With Quote
The Following 2 Users Say Thank You to TRUEPRO For This Useful Post:
denverboz (04-16-2012), PaliBob (04-13-2012)
Old 04-16-2012, 02:40 PM   #3
Newbie
 
Join Date: Oct 2011
Posts: 2
Rewards Points: 0
Default

re-grouting steps


Quote:
Originally Posted by TRUEPRO View Post
I can see these steps were looking very nice at one point. A little TLC is all you need to make them shine again (figuratively). You should use a grinder with a diamond tip blade to cut out all of the old mortar approx. 1". Be careful not to cut into the stone. Use various size chisels to get the areas not accessible with grinder. Now- You have 2 options.

Option 1= Only cut and fill the joints that need it. Downside is new mortar will not match the old, and old could eventually crack away too.
Option 2= This option is the only way i would do it. Cut out ALL the old mortar.

Now that you have the mortar cut out, spray off with hose and let dry. Mix masonry mortar to a consistency of pudding. Loose enough to be squeezed through a grout bag but stiff enough to not be runny/watery. You might want to trial and error with the mix before you go grouting as you do not want to get mud on the stones and make a mess. The key is to grout the joints and leave the stones clean. Make sure to use the proper mixture of
sand/dry mortar/water.

The problem with some of these larger joints on the steps is that the joint is to big to receive mortar. You must place something sturdy underneath the hole for the mortar to sit on until it bonds to the stone. Kind of like a form for concrete. Use some wood or something to place underneath.

Once you have filled the bed and head (horizontal/vertical) joints, wait until it becomes hard and use a small margin trowel to scrap it off so its flush with the stone surface. After its all filled with new mortar it should take about 30-45 before its ready (65 degrees average).

I know this is alot of info to take in at once so no worries if you have many questions. Hope this helps.

EAGLE757
Hey, Just want to say thank you very much for the advice, and yeah just one other question.

As for as the mortar mix, can I get it with not having to add anything (besides water of course), or will I have to add sand no matter what?

And thanks again
denverboz is offline   Reply With Quote
Old 04-16-2012, 03:24 PM   #4
Member
 
Join Date: Apr 2012
Location: Va Beach, VA
Posts: 237
Rewards Points: 0
Default

re-grouting steps


Yes you can find various premixed products at your local HD/Lowes. I havent had the greatest experiences with these add water and go mixtures but for what your doing it should be fine. Getting the right consistency is the key to making the grouting go easy. Best of luck!
TRUEPRO is offline   Reply With Quote
Old 04-17-2012, 10:14 PM   #5
Concrete & Masonry
 
Join Date: Nov 2008
Location: Wisconsin
Posts: 2,720
Rewards Points: 0
Default

re-grouting steps


Quote:
Originally Posted by denverboz View Post
Looking for a little advice on the best way to re-grout these exterior steps, like would I just use standard concrete etc? They actually had them done a few years ago by a so-called professional, and well you can see the results!!!

Here's a couple pics at what we're looking at:
The reason it looks that way is because it was patched at that time, and from the looks of it, the material is less than ideal for horizontal masonry steps. I don't want to sound extreme, but I don't see that lasting more than a few short years without a complete tear-up & resetting or better yet, replacement with suitable material. Grindign and tuckpointing that in place will only buy you a few years IMPO........
jomama45 is offline   Reply With Quote
Old 04-18-2012, 01:33 PM   #6
Newbie
 
Join Date: Mar 2012
Location: At my desk
Posts: 5
Rewards Points: 0
Default

re-grouting steps


I believe TRUEPRO's advice is the best advice to follow...couldn't have said it better myself.

lynnbrwn is offline   Reply With Quote
The Following User Says Thank You to lynnbrwn For This Useful Post:
TRUEPRO (04-24-2012)
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Installing stone steps timcsi Landscaping & Lawn Care 2 12-19-2011 10:00 PM
Exterior Wood Steps with Fieldstone Risers Leck Building & Construction 1 06-29-2010 08:32 PM
Re-staining inside steps saggdevil Painting 10 09-20-2009 06:40 PM
Steps after grouting ceramic floor tile creamaster Flooring 1 06-15-2009 02:32 PM
wood front porch steps dlhein Carpentry 4 05-11-2008 08:06 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.