DIY Chatroom Home Improvement Forum

DIY Chatroom Home Improvement Forum (http://www.diychatroom.com/)
-   Concrete, Stone & Masonry (http://www.diychatroom.com/f105/)
-   -   New Concrete On Top of Old (http://www.diychatroom.com/f105/new-concrete-top-old-167642/)

St. A 12-28-2012 06:01 PM

New Concrete On Top of Old
 
I touched on this topic in another thread, but thought this title would get right to the point. I'd like level an existing concrete foundation which was graded rather steeply at 7 1/2'' over an 18' run. I'm looking at doing this in two locations- one under the house (carport), one on a concrete parking area. I'm thinking of cleaning the old concrete, drilling some holes in it, adding rebar to help reduce any shifting, and then call in a truck for the pour. It looks like it would be about three yards in each location. How does this manner of leveling sound? Thanks- Aaron

woodworkbykirk 12-28-2012 07:05 PM

if you have done your calculation right on the volume you should be fine.. just be sure to strike a level line with a laser level so to have something to finish to

stadry 12-28-2012 07:22 PM

would you touch on this a bit more 'cause i just got in :laughing: someone poured a footer that's 7 1/2" LOW on 1 end 18' from the correct elevation ? ? ?

obviously having the conc contractor come back isn't an option ? then again, i he hadn't noticed the forms had fallen OR didn't use a level, why would you want him back,,, 'cleaning the old concrete' may involve scarifying or using a bushing tool, mortar for a bonding compound to prevent old conc from sucking moisture out of the new, vertical rebar 2' o/c + horizontal #4 bar tied to the vertical bar,,, anyway, that's my story & i'm stickin' to it :yes:

Bondo 12-28-2012 07:23 PM

Quote:

Originally Posted by St. A (Post 1081481)
I touched on this topic in another thread, but thought this title would get right to the point. I'd like level an existing concrete foundation which was graded rather steeply at 7 1/2'' over an 18' run. I'm looking at doing this in two locations- one under the house (carport), one on a concrete parking area. I'm thinking of cleaning the old concrete, drilling some holes in it, adding rebar to help reduce any shifting, and then call in a truck for the pour. It looks like it would be about three yards in each location. How does this manner of leveling sound? Thanks- Aaron

Ayuh,.... 'n you shoulda stuck with that thread,...

You've only answered a few of the questions asked of you, There....
Now yer runnin' another thread, 'n Nobody has a clue as to what yer talkin' 'bout....

If ya run 1 thread 'bout the project phase, All the relevant info is where it can be referenced...
New thread,... No reference,.... equals Confusion....

Btw,... I asked ya another question in yer 1st thread....

St. A 12-28-2012 07:54 PM

There's no contractor to call as the work was done years ago before I owned the house. But in any case, there is no fault, the concrete was graded, presumably for drainage away from the house. I just want to level part of it so I can build something on top of the level foundation. Thanks- Aaron

PS- Spanked about starting a second thread. Wasn't trying to break any rules of etiquette here. I was just trying to help by simplifying the question. On other forums where I am an active member, I know users often search for subjects by title and I thought clearing up mine would aid in other people's searches. Sorry for any confusion I may have caused. Thanks for your help- Aaron

stadry 12-29-2012 06:20 AM

is this a buried wall OR slab ? maybe a picture's a good idea :laughing:

forget those other forums - ALL the good guys are here :thumbsup:

md2lgyk 12-29-2012 06:57 AM

Quote:

Originally Posted by St. A (Post 1081536)
I just want to level part of it so I can build something on top of the level foundation.

What is it you want to build? Your slab isn't a "foundation" and likely has no footers.

Bondo 12-29-2012 07:22 AM

Quote:

Originally Posted by md2lgyk (Post 1081720)
What is it you want to build? Your slab isn't a "foundation" and likely has no footers.

Ayuh,... Click on the links in post #4 to find his Other thread, with all the Information...:whistling2:

Canarywood1 12-29-2012 11:28 AM

Quote:

Originally Posted by St. A (Post 1081481)
I touched on this topic in another thread, but thought this title would get right to the point. I'd like level an existing concrete foundation which was graded rather steeply at 7 1/2'' over an 18' run. I'm looking at doing this in two locations- one under the house (carport), one on a concrete parking area. I'm thinking of cleaning the old concrete, drilling some holes in it, adding rebar to help reduce any shifting, and then call in a truck for the pour. It looks like it would be about three yards in each location. How does this manner of leveling sound? Thanks- Aaron


Not a good idea to go from "0" to 7 1/2 inches,the "0" end should be at least 3 inches thick,and a good bonding agent applied for 3-4 feet.

St. A 12-29-2012 11:56 AM

Canarywood- Thanks for your reply. Is the feather edge always a bad idea? If it is an issue of traffic/ weather, would thinset/ tile over the top mitigate the degradation problem or is it another issue like brittleness in the thin feateredge? Thanks again, Aaron

Canarywood1 12-29-2012 12:11 PM

Quote:

Originally Posted by St. A (Post 1081847)
Canarywood- Thanks for your reply. Is the feather edge always a bad idea? If it is an issue of traffic/ weather, would thinset/ tile over the top mitigate the degradation problem or is it another issue like brittleness in the thin feateredge? Thanks again, Aaron



Feathering to "0" is always a bad idea,and thinset and tile would not mitigate the degradation problem,i've never seen it work in my 35 years in the business.

St. A 12-29-2012 12:21 PM

Thanks Canarywood. I sure appreciate the information. I asked another similar question in another section of the forum- basically using sleepers over vapor barrier over concrete to attempt the same thing- a level floor for a living area. If you have the time, I'd be curious if you'd ever seen this or another solution to this problem. -Aaron

http://www.diychatroom.com/f19/small...2/#post1081792

sixeightten 12-29-2012 12:27 PM

Quote:

Originally Posted by St. A (Post 1081868)
Thanks Canarywood. I sure appreciate the information. I asked another similar question in another section of the forum- basically using sleepers over vapor barrier over concrete to attempt the same thing- a level floor for a living area. If you have the time, I'd be curious if you'd ever seen this or another solution to this problem. -Aaron

http://www.diychatroom.com/f19/small...2/#post1081792

We have done that before. Cheaper than the concrete also. I didn't read the other thread so I am just going by what you have here.

Canarywood1 12-29-2012 02:42 PM

[quote=St. A;1081868]Thanks Canarywood. I sure appreciate the information. I asked another similar question in another section of the forum- basically using sleepers over vapor barrier over concrete to attempt the same thing- a level floor for a living area. If you have the time, I'd be curious if you'd ever seen this or another solution to this problem. -Aaron



That would be a much better and a lot cheaper solution to your problem,just be sure to use PT sleepers.

St. A 12-29-2012 04:54 PM

Last question and then that's it (until the next time :laughing:): Should I anchor the sleepers to the concrete? If so, with what? Thanks again all. -Aaron


All times are GMT -5. The time now is 09:08 PM.