Old 12-27-2012, 02:02 AM   #1
Newbie
 
Join Date: Dec 2012
Posts: 2
Share |
Default

New Basement Entrance


I'm putting in a new basement entrance. The plan is to pour a 5' x 10' pad and foundation with block walls. The pad will be 7' below grade and 6" thick with wire reinforcing. The stair will be treated wood. Feel free to comment on any of the above, but, the 2 questions are ...1. Does the pad foundation need to be attached to the existing basement floor/foundation? If so, how is that done? And 2. How is the concrete block attached to the existing poured foundation wall?

4021 is offline   Reply With Quote
Old 12-27-2012, 04:36 AM   #2
Member
 
Join Date: Dec 2011
Location: zentral Iowa
Posts: 1,149
Default

New Basement Entrance


Where are you located? Put this on your profile and people won't have to ask.

I've put in three of these, covered and uncovered. In both cases, the area was formed up as a part of the basement (continuous footings and poured walls).

So in your case, you'll want to over-excavate to allow for the footings. Form these up and tie into your existing footings somehow (re-rod dowels drilled in and attached to existing with epoxy, etc.).

Then you will also have to attach the concrete block wall or poured wall. You're going with C block walls, so you'll have to drill into what you have, attach bolts, then do same with what you're adding. If you're attaching to C block, then drill in the core of each block or however often as necessary, put in a bent piece of rebar, and leave a fair amount sticking out. Then go to the top of the wall and knock out a piece so you can fill the whole core solid with grouting material. If you knock out this piece on the exterior, maybe you can get a piece of re-rod down in this core as well.

If you are connecting to a poured concrete wall, then just drill holes, insert re-bar, and fill with epoxy.

When you lay up your c block wall for the entrance, you'll want to insert the re-rod into holes in the block, then bend the re-bar a bit. If possible, you can bend it before you lay the block. Maybe it is not even necessary to bend the re-bars, but it won't hurt. After you are done laying this wall, insert re-bar vertically down that core, and fill it with grout. You can fill as many cores with re-bar and grout as you like, I think minimum of every 4'.

If you are leaving the entrance open, you may as well cap it off with solid block or fill all the cores. It would look nice to have a rowlock of brick on top.

cleveman is offline   Reply With Quote
Old 12-27-2012, 06:31 AM   #3
Framing Contractor
 
Join Date: Apr 2006
Location: Caldwell, NJ
Posts: 1,758
Default

New Basement Entrance


Quote:
Originally Posted by 4021 View Post
I'm putting in a new basement entrance. The plan is to pour a 5' x 10' pad and foundation with block walls. The pad will be 7' below grade and 6" thick with wire reinforcing. The stair will be treated wood. Feel free to comment on any of the above, but, the 2 questions are ...1. Does the pad foundation need to be attached to the existing basement floor/foundation? If so, how is that done? And 2. How is the concrete block attached to the existing poured foundation wall?
Who's plan is this? Are you working from your own ideas, or are you working from a set of plans drawn by an architect? If so, call the architect back up and ask him/her for the answer. They HAVE to put that in the plans.
__________________
Joe Carola
Joe Carola is offline   Reply With Quote
Old 12-27-2012, 07:37 AM   #4
Member
 
joed's Avatar
 
Join Date: Mar 2005
Location: Welland, Ontario
Posts: 7,365
Default

New Basement Entrance


You did not state your location. That is important because you need to know your frost lines. If you have a four foot depth for foundation you will now have also dig four feet below the foundation of the house the compensate lowering the ground level to the base of the foundation.
__________________
Do not PM with questions that can be asked in a forum. I will not respond.
joed is offline   Reply With Quote
Old 12-27-2012, 07:43 AM   #5
Member
 
Join Date: Jun 2009
Location: hilton head & atlanta
Posts: 3,035
Default

New Basement Entrance


no, don't attach the new conc or blocks to existing - that's why we have isolation joint mtl for the conc & exterior wtrproofing mtls for blocks,,, you may wish to seal the adjoining joint w/proper jnt sealant & backer prior to applying wtrproofing mtl,,, during freeaing temps, i'd keep some 150w light bulbs burning to prevent frost wall damage
__________________

if you hear it from a guy in the apron store, be VERY suspicious the mtl/method will work,,, when it time to build something together, they won't answer phones NOR help
itsreallyconc is offline   Reply With Quote
Old 12-27-2012, 08:15 AM   #6
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,732
Default

New Basement Entrance


May want to check around some local concrete supply companys. Some carry premade concrete steps that can be just dropped into place.
http://www.bilco.com/foundations/sto...roduct=1PE%2D1
joecaption is offline   Reply With Quote
The Following User Says Thank You to joecaption For This Useful Post:
4021 (12-27-2012)
Old 12-27-2012, 09:15 AM   #7
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 25,732
Default

New Basement Entrance


http://www.bilco.com/foundations/sto...roduct=1PE%2D1
joecaption is offline   Reply With Quote
Old 01-04-2013, 09:39 PM   #8
Guywithskills
 
Join Date: Jan 2013
Location: Arizona
Posts: 33
Default

New Basement Entrance


Just to affirm got it right:
cleveman
Member

Join Date: Dec 2011
Location: zentral Iowa
Posts: 523

I have done these as well, and this is how we did them. I would call the architect only if I wanted a drinking buddy. Their skills in remodel or after the fact are too often limited. Coming from one who would bid on lots of Army Corps of Engineer projects. Then when we got the job, we would draw up what we proposed to do, and they usually rubber stamped what we proposed. They were good about taking our input for non text book projects.
FYI; Field Journeymen train the architects after they are out of school... Cannot tell you how many times an inspector/engineer on the job was trained by us on how to inspect our work.

Guywithskills is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Walkdown Basement Entrance Needs Covered asmealio Building & Construction 5 12-06-2012 11:03 AM
Wet basement - don't know where to start konradsa Building & Construction 17 09-20-2011 10:08 AM
Building Code Requirements: Basement Stairs (Quantity) dutchswan0311 Building & Construction 27 09-19-2011 06:13 PM
Remodeling basement: Moist foundation gordonf238 Building & Construction 8 04-25-2010 06:50 PM
Basement Renovation Project Howdy Electrical 6 03-13-2008 11:07 AM




Top of Page | View New Posts