Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Concrete, Stone & Masonry

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 11-14-2012, 11:13 AM   #1
Member
 
Join Date: Dec 2006
Location: Fountain Valley, CA 92708 (orange county)
Posts: 660
Rewards Points: 504
Default

Float first before working on shower walls?


I'm having a hot mop pan installed. I'd rather not step directly on the hot mop surface for fear of damaging the waterproofing. I'm thinking about floating the mud over the hot mop, and then before tiling using that surface to stand on while I work on the shower walls. I assume that surface will be rock solid.
I did not work the walls because I've been told I cannot install the panels overlapping the hot mop vertical surface (the panels will bend). I want to see the finished pan and see for myself.

darsunt is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Uneven match between walls and Hardiboard in shower Ocelot Tiling, ceramics, marble 11 10-12-2012 09:26 PM
Cheapest shower walls possible? hoosbekah Kitchen & Bath Remodeling 2 12-09-2011 09:08 PM
Need to replace 34 x 48 shower base (has surround walls inside shower base lip) justplumducky Plumbing 3 09-10-2011 10:59 PM
Grout between new tiled shower walls looks wet. doogie88 Tiling, ceramics, marble 3 10-01-2009 09:05 PM
Busting out my shower tile floor and walls. caliskier Building & Construction 3 03-15-2009 09:59 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.